H C I Systems Inc
- Based in
- Ontario
- On San Francisco permits
- Aug 2012 to Jun 2026
- Last 24 months
- 20 permits filed
278 permits since 2000: 209 completed, 11 in progress, 45 never finaled, 13 expired or cancelled.
Of the 45 never-finaled permits, 1 is 3 to 5 years old, 22 are 5 to 10 years old, 22 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 never finaled. Typically 1 days from filing to permit and 32 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 15, 2016 | Never finaled issued Apr 2016, no final | 888 Brannan St | new kitchen & fire suppression system (pyro-chem), install of cabinets, tanks, pull station, detection & piping. reference arch/mep ti #201406300004Details
new kitchen & fire suppression system (pyro-chem), install of cabinets, tanks, pull station, detection & piping. reference arch/mep ti #201406300004 | $4,995 |
| Apr 15, 2016 | Completed final sign-off May 2016 | 1155 Market St | 10th & 11th flrs: new kitchen & fire suppression system (pyro-chem), install of tanks, pull station, detection, piping & gas valve. ref. t.i. permit #2015-0702-0526Details
10th & 11th flrs: new kitchen & fire suppression system (pyro-chem), install of tanks, pull station, detection, piping & gas valve. ref. t.i. permit #2015-0702-0526 | $4,995 |
| Jan 29, 2016 | Completed final sign-off Jul 2016 | 222 02nd St | connect & install ansul system to meet ul300 standard. in the kitchen and to connect pcu with ansul systemDetails
connect & install ansul system to meet ul300 standard. in the kitchen and to connect pcu with ansul system | $5,250 |
| Nov 23, 2015 | Completed final sign-off Dec 2015 | 888 Brannan St | ansul ul-300 r-102 fire suppression system for kitchen hood and pollution control unit to be tied to the fire alarm system as 1 system. reference ti 2015.0320.1442 . n/a ordinance #155-13Details
ansul ul-300 r-102 fire suppression system for kitchen hood and pollution control unit to be tied to the fire alarm system as 1 system. reference ti 2015.0320.1442 . n/a ordinance #155-13 | $4,200 |
| Aug 9, 2012 | Completed final sign-off Sep 2012 | 2222 Broadway | lower level-replace (e) facp with new est3, per csfm information bulletin 9/4/2008. add new fa devices in kitchen t.i #201202274935. new equipment est3 facp-4 smoke detectors, 5 horn strobes, 1 strobe, 1 input module & 3 control modules. e devices compatible with new panelDetails
lower level-replace (e) facp with new est3, per csfm information bulletin 9/4/2008. add new fa devices in kitchen t.i #201202274935. new equipment est3 facp-4 smoke detectors, 5 horn strobes, 1 strobe, 1 input module & 3 control modules. e devices compatible with new panel | $22,400 |