Permit GraphShortlistSan Francisco building permits since 2000

Block 0343, lot 032

27 Taylor St

City’s use
Commercial Office
Built
1922
Stories
7
Building
55,769 sq ft
Zoning
NA
Construction type
NA

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

32 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jun 2, 2026Completed
final sign-off Aug 2026
27 Taylor StJon K Takata Corp Dba Restoration Mgmt90 sqft of drywall repair from water damage - flooring/carpet ~ 900 sqft.
Details
Permit
202606022368
Permit issued
Jun 3, 2026
Final sign-off
Aug 6, 2026

90 sqft of drywall repair from water damage - flooring/carpet ~ 900 sqft.

Open the permit page

$100,000
Jun 12, 2024In progress
filed Jun 2024, not yet issued
25 Taylor StH C I Systems Incfire alarm as built: relocate annunciator as shown on sheet fa402. add pump phase reversal and theater duct to the control display module on sheet fa203. relocate facp bps to gr fl as fiel conditions depicted.
Details
Permit
202406124259

fire alarm as built: relocate annunciator as shown on sheet fa402. add pump phase reversal and theater duct to the control display module on sheet fa203. relocate facp bps to gr fl as fiel conditions depicted.

Open the permit page

$14,310
Apr 1, 2024In progress
issued Apr 2024
25 Taylor StH C I Systems Incinstallation of new edwards est3 gann annunciator at the loading dock/security location referenced on sheet fa-401 and fa-402. the annunciator will tie into an existing fire alarm system in the theater.
Details
Permit
202404018977
Permit issued
Apr 5, 2024

installation of new edwards est3 gann annunciator at the loading dock/security location referenced on sheet fa-401 and fa-402. the annunciator will tie into an existing fire alarm system in the theater.

Open the permit page

$14,310
Oct 17, 2018Completed
final sign-off Oct 2018
25 Taylor StRed Hawk Fire & Security Ca Llc7th fl: fire alarm ti: add 1 control relay for music shut down. no ref #.
Details
Permit
201810173489
Permit issued
Oct 17, 2018
Final sign-off
Oct 24, 2018

7th fl: fire alarm ti: add 1 control relay for music shut down. no ref #.

Open the permit page

$600
Oct 3, 2018Completed
final sign-off Nov 2018
25 Taylor StWework Construction Llc Dba Wework Constto obtain final inspection for work approved under app#201304233286 work is complete.
Details
Permit
201810032100
Permit issued
Oct 3, 2018
Final sign-off
Nov 14, 2018

to obtain final inspection for work approved under app#201304233286 work is complete.

Open the permit page

Oct 3, 2018Completed
final sign-off Nov 2018
25 Taylor StWework Construction Llc Dba Wework Constto obtain final inspection for work approved under app#201302210651, 201302119979, 201212105807. all work is complete.
Details
Permit
201810032094
Permit issued
Oct 3, 2018
Final sign-off
Nov 14, 2018

to obtain final inspection for work approved under app#201302210651, 201302119979, 201212105807. all work is complete.

Open the permit page

Oct 3, 2018Completed
final sign-off Nov 2018
25 Taylor StWework Construction Llc Dba Wework Constto obtain final inspection for work approved under app#201304184870, 201304154593, 201303202677. all work is complete.
Details
Permit
201810032099
Permit issued
Oct 3, 2018
Final sign-off
Nov 14, 2018

to obtain final inspection for work approved under app#201304184870, 201304154593, 201303202677. all work is complete.

Open the permit page

Oct 3, 2018Completed
final sign-off Nov 2018
25 Taylor StWework Construction Llc Dba Wework Constto obtain final inspection for work approved under app#201312063511, 201310290550, 201306149624. all work is complete.
Details
Permit
201810032098
Permit issued
Oct 3, 2018
Final sign-off
Nov 14, 2018

to obtain final inspection for work approved under app#201312063511, 201310290550, 201306149624. all work is complete.

Open the permit page

Aug 31, 2018Completed
final sign-off Nov 2018
25 Taylor StSchmitt Heating Co Incto obtain final inspection for work approved under pa#2013-1230-5225. all work is complete.
Details
Permit
201808318874
Permit issued
Aug 31, 2018
Final sign-off
Nov 6, 2018

to obtain final inspection for work approved under pa#2013-1230-5225. all work is complete.

Open the permit page

Aug 21, 2018Completed
final sign-off Nov 2018
25 Taylor StWework Construction Llc Dba Wework Constto obtain final inspection for work approved under pa 2012-1114-4236, 2012-0803-6458 and 2013-0724-2620. all work is complete
Details
Permit
201808217880
Permit issued
Oct 3, 2018
Final sign-off
Nov 14, 2018

to obtain final inspection for work approved under pa 2012-1114-4236, 2012-0803-6458 and 2013-0724-2620. all work is complete

Open the permit page

May 7, 2018Completed
final sign-off May 2018
25 Taylor StCanning Electric Incto obtain final inspection for work approved under pa# 201403180970
Details
Permit
201805078349
Permit issued
May 7, 2018
Final sign-off
May 29, 2018

to obtain final inspection for work approved under pa# 201403180970

Open the permit page

Jul 18, 2017Expired or cancelled
cancelled Jan 2026
25 Taylor St2 new partitions built w/o permits located at rooftop elevator equipment room. mep under separate permit.
Details
Permit
201707182141

2 new partitions built w/o permits located at rooftop elevator equipment room. mep under separate permit.

Open the permit page

$3,000
Jun 29, 2017Never finaled
issued Feb 2019, no final
25 Taylor StH C I Systems Incas-built resubmittal. ref app#201302059474. t.i. ref app #200712180785 and #201208036458
Details
Permit
201706290728
Permit issued
Feb 5, 2019

as-built resubmittal. ref app#201302059474. t.i. ref app #200712180785 and #201208036458

Open the permit page

May 10, 2017Completed
final sign-off Oct 2017
25 Taylor StBerland Designhandrail/guardrail upgrade of main bldg stair to meet cbc reqmnts . upgrade handrail/guardrail will match extg handrail/guardrail. n/a for maher.
Details
Permit
201705106254
Permit issued
Jun 15, 2017
Final sign-off
Oct 4, 2017

handrail/guardrail upgrade of main bldg stair to meet cbc reqmnts . upgrade handrail/guardrail will match extg handrail/guardrail. n/a for maher.

Open the permit page

$150,000
Apr 24, 2017Never finaled
issued Apr 2017, no final
25 Taylor StBuild Group Inc.revision to 201609198151, 201702169604 for t24 lighting compliance ref 201512185562 for architectural
Details
Permit
201704244717
Permit issued
Apr 24, 2017

revision to 201609198151, 201702169604 for t24 lighting compliance ref 201512185562 for architectural

Open the permit page

Apr 17, 2017Completed
final sign-off May 2017
27 Taylor Stto document address change at pa #201512185563 from 25 taylor street to 27 taylor street. n/a for maher.
Details
Permit
201704174097
Permit issued
Apr 17, 2017
Final sign-off
May 24, 2017

to document address change at pa #201512185563 from 25 taylor street to 27 taylor street. n/a for maher.

Open the permit page

Apr 17, 2017Never finaled
issued Apr 2017, no final
27 Taylor Stper pa #201512185563, add address to new commercial space stuiod dental as; 27 taylor street
Details
Permit
M778567
Permit issued
Apr 17, 2017

per pa #201512185563, add address to new commercial space stuiod dental as; 27 taylor street

Open the permit page

Feb 16, 2017Completed
final sign-off May 2017
25 Taylor StBuild Group Inc.revision to mep submittal for dental clinic ref 2016-0919-8151 maher na
Details
Permit
201702169604
Permit issued
Mar 7, 2017
Final sign-off
May 24, 2017

revision to mep submittal for dental clinic ref 2016-0919-8151 maher na

Open the permit page

Jan 10, 2017Completed
final sign-off May 2017
25 Taylor StBuild Group Inc.install non-electric projecting double faced door sign
Details
Permit
201701106840
Permit issued
Jan 23, 2017
Final sign-off
May 24, 2017

install non-electric projecting double faced door sign

Open the permit page

$250
Dec 28, 2016Never finaled
issued Dec 2016, no final
25 Taylor Ststreet space
Details
Permit
M749987
Permit issued
Dec 28, 2016

street space

Open the permit page

Nov 29, 2016Never finaled
issued Nov 2016, no final
25 Taylor StP 3 Construction & Remodeling Incto obtain final inspection for work approved under pa#2014-0521-6383. all work is final.
Details
Permit
201611293646
Permit issued
Nov 29, 2016

to obtain final inspection for work approved under pa#2014-0521-6383. all work is final.

Open the permit page

Oct 26, 2016Never finaled
issued Oct 2016, no final
25 Taylor Ststreet space
Details
Permit
M733287
Permit issued
Oct 26, 2016

street space

Open the permit page

Oct 11, 2016Completed
final sign-off Apr 2017
25 Taylor StH C I Systems Incinstall 9 new ceiling mounted notification appliances in studio dental tenant space. all strobes shall be synchronized. ref pa 2015-1218-5563. maher na
Details
Permit
201610119932
Permit issued
Oct 11, 2016
Final sign-off
Apr 5, 2017

install 9 new ceiling mounted notification appliances in studio dental tenant space. all strobes shall be synchronized. ref pa 2015-1218-5563. maher na

Open the permit page

$6,714
Sep 28, 2016Completed
final sign-off Apr 2017
25 Taylor StEco Fire Sprinklers Incaddition of 15 pendent sprinklers & 28 upright sprinklers to existing fire sprinkler system. ref pa 2015-1218-5563
Details
Permit
201609289004
Permit issued
Sep 28, 2016
Final sign-off
Apr 7, 2017

addition of 15 pendent sprinklers & 28 upright sprinklers to existing fire sprinkler system. ref pa 2015-1218-5563

Open the permit page

$15,000
Sep 19, 2016Completed
final sign-off May 2017
25 Taylor StBuild Group Inc.deferred mep for dental clinic on 1st fl of 7 story building. ref 2015-1218-5563. fire alarm, sprinkler deferred.
Details
Permit
201609198151
Permit issued
Oct 11, 2016
Final sign-off
May 24, 2017

deferred mep for dental clinic on 1st fl of 7 story building. ref 2015-1218-5563. fire alarm, sprinkler deferred.

Open the permit page

Jun 29, 2016Completed
final sign-off Apr 2017
25 Taylor StBuild Group Inc.interior soft demo per ab-017
Details
Permit
201606291196
Permit issued
Jul 6, 2016
Final sign-off
Apr 13, 2017

interior soft demo per ab-017

Open the permit page

$10,000
Apr 1, 2016Completed
final sign-off May 2018
25 Taylor StH C I Systems Incbasement, 1st flr -hci sys install dual monitor modules to monitor all waterflow & tamper valve switches in fire pump rm. clean up all initiating circuit wiring. monitor os & y valve. a sys event printer will be installed in fire pump rm.all new devices shall be tied into (e)fire alarm sys.n/a maher
Details
Permit
201604013724
Permit issued
Apr 1, 2016
Final sign-off
May 2, 2018

basement, 1st flr -hci sys install dual monitor modules to monitor all waterflow & tamper valve switches in fire pump rm. clean up all initiating circuit wiring. monitor os & y valve. a sys event printer will be installed in fire pump rm.all new devices shall be tied into (e)fire alarm sys.n/a maher

Open the permit page

$5,000
Dec 18, 2015Completed
final sign-off May 2017
25 Taylor StBuild Group Inc.t.i. ground floor of (e) 7 story office/theater building. removal of demising wall between (e) adjacent office spaces to create new 1,815 sf dental clinic including selected interior improvements, rev to mezz & storefront. maher not req.
Details
Permit
201512185563
Permit issued
Sep 15, 2016
Final sign-off
May 24, 2017

t.i. ground floor of (e) 7 story office/theater building. removal of demising wall between (e) adjacent office spaces to create new 1,815 sf dental clinic including selected interior improvements, rev to mezz & storefront. maher not req.

Open the permit page

$217,800
Jul 7, 2015Completed
final sign-off Jul 2015
25 Taylor StPribuss Engineering Incbasement, fire sprinkler: relocated heads 7, added 5 total 12 heads; maher n/a
Details
Permit
201507070787
Permit issued
Jul 7, 2015
Final sign-off
Jul 15, 2015

basement, fire sprinkler: relocated heads 7, added 5 total 12 heads; maher n/a

Open the permit page

$6,176
Apr 23, 2015Never finaled
issued Apr 2015, no final
25 Taylor Stto obtain final inspection for work approved under pa#200012077376. all work is complete.
Details
Permit
201504234425
Permit issued
Apr 23, 2015

to obtain final inspection for work approved under pa#200012077376. all work is complete.

Open the permit page

Jan 29, 2015Expired or cancelled
withdrawn Dec 2015
25 Taylor Stowner improvement to ground floor retail space. demo- mezz with stair. combine two retail spaces into one. new interior "white-box" of space to prepare for lease to future tenant. new bathroom to replace (e). new facade stroe front.** maher: compliance with ordinance no# 155-13 not required **
Details
Permit
201501297000

owner improvement to ground floor retail space. demo- mezz with stair. combine two retail spaces into one. new interior "white-box" of space to prepare for lease to future tenant. new bathroom to replace (e). new facade stroe front.** maher: compliance with ordinance no# 155-13 not required **

Open the permit page

$50,000
Dec 3, 2014Completed
final sign-off May 2017
25 Taylor StH C I Systems Increplace the existing fire alarm system in the theater side of the building on a like for like basis per csfm code interpretation 12-001 and csfm information bulletin issued sept 4th 2008; maher n/a
Details
Permit
201412032930
Permit issued
Dec 3, 2014
Final sign-off
May 11, 2017

replace the existing fire alarm system in the theater side of the building on a like for like basis per csfm code interpretation 12-001 and csfm information bulletin issued sept 4th 2008; maher n/a

Open the permit page

$14,740

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Build Group Inc. (6), H C I Systems Inc (6), Wework Construction Llc Dba Wework Const (5), Berland Design, Canning Electric Inc, Eco Fire Sprinklers Inc, Jon K Takata Corp Dba Restoration Mgmt, P 3 Construction & Remodeling Inc, Pribuss Engineering Inc, Red Hawk Fire & Security Ca Llc, Schmitt Heating Co Inc
Architects
David D. Montalba, Michael Ryan, Millard Pratt
Engineers
Jefferson Chen, Julia Chen

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.