Eric Lundquist
- Listed as
- architect, authorized agent-others
- Firm
- Heller Manus Architects
- Based in
- San Francisco
- On San Francisco permits
- Aug 2007 to Oct 2026
9 permits since 2000 (architect on 8 permits, authorized agent-others on 1 permit): 4 completed, 2 in progress, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 1400 Geary Bl | Peninsula Custom Construction Inc | elevator lobby improvements in support of elevator replacement. (e) elevator cabs remain in place, interior finishes & related cab components. upgraded as modernization, replacement of traction machines, counterweights, controls, & equipment for destination dispatch elevator system.Details
elevator lobby improvements in support of elevator replacement. (e) elevator cabs remain in place, interior finishes & related cab components. upgraded as modernization, replacement of traction machines, counterweights, controls, & equipment for destination dispatch elevator system. | $250,000 |
| Aug 20, 2026 | In progress filed Aug 2026, not yet issued | 1400 Geary Bl | replacement of exterior glazing systems throughout the entire facility,including windows,storefronts,entrances & curtain walls.replacement of elevators,traction machines & counterweights with(n) cabs,controls & equipment for a(n)destination dispatch elevator system.Details
replacement of exterior glazing systems throughout the entire facility,including windows,storefronts,entrances & curtain walls.replacement of elevators,traction machines & counterweights with(n) cabs,controls & equipment for a(n)destination dispatch elevator system. | $19,500,000 | |
| Apr 7, 2025 | Completed final sign-off Aug 2026 | 747 Howard St | Webcor Construction Lp | water proofing repairs at the expansion joint at moscone center. not on the public wayDetails
water proofing repairs at the expansion joint at moscone center. not on the public way | $40,000 |
| Jun 29, 2022 | Never finaled issued Jul 2022, no final | 235 Valencia St | addition of 2 rolling grilles and 3 security gates @ the ground floor; no plumbing or electrical workDetails
addition of 2 rolling grilles and 3 security gates @ the ground floor; no plumbing or electrical work | $18,000 | |
| Oct 8, 2020 | Completed final sign-off Jul 2021 | 181 Fremont St | administrative change of occupancy revisions dn level 39. level 39 exterior terrace doors to be modified w/ magnetic locks, signage for (e) a.d.a push button to engage the automatic operation of the doorDetails
administrative change of occupancy revisions dn level 39. level 39 exterior terrace doors to be modified w/ magnetic locks, signage for (e) a.d.a push button to engage the automatic operation of the door | $12,000 | |
| Feb 21, 2020 | Completed final sign-off Aug 2020 | 350 Bush St | Principal Builders Inc. | install 2 security doors within the exit passagewaysDetails
install 2 security doors within the exit passageways | $6,000 |
| Dec 23, 2019 | Never finaled filed Dec 2019, never issued | 424 Brannan St | erect a new 7 story, 1 basement, office,parking. type 1-aDetails
erect a new 7 story, 1 basement, office,parking. type 1-a | $17,500,000 | |
| Dec 23, 2019 | Never finaled filed Dec 2019, never issued | 424 Brannan St | erect a 7 story,1 basement. office with parking, cafe.type 1-a. **maher applicable**Details
erect a 7 story,1 basement. office with parking, cafe.type 1-a. **maher applicable** | $17,500,000 | |
| Aug 7, 2007 | Completed final sign-off Jan 2019 | 350 Bush St | Hathaway Dinwiddie Co. | to erect 20 stories, 3 basements, office bldg.Details
to erect 20 stories, 3 basements, office bldg. | $25,000,000 |