444 permits since 2000: 378 completed, 60 in progress, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 4 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
423 kitchen remodel permits: 363 completed, 54 in progress, 4 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 70 days from permit to final inspection.
Showing the 100 most recent of 423.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2026 | In progress issued Sep 2026 | 440 Davis Ct | unit# 2117: rehabilitate existing kitchen and bathroom. install washer & dryer. no removal of structural walls.Details
unit# 2117: rehabilitate existing kitchen and bathroom. install washer & dryer. no removal of structural walls. | $60,000 |
| Sep 17, 2026 | In progress issued Sep 2026 | 155 Jackson St | unit#: 1107; rehabiltate existing kitchen and bathroom install washer and dryer. no removal of structural walls.Details
unit#: 1107; rehabiltate existing kitchen and bathroom install washer and dryer. no removal of structural walls. | $100,000 |
| Aug 27, 2026 | In progress issued Aug 2026 | 440 Davis Ct | unit 2015- remodel kitchen and bathroom. no removal of structrual walls. no (n) penetrations into (e) concrete elements. install washer and dryerDetails
unit 2015- remodel kitchen and bathroom. no removal of structrual walls. no (n) penetrations into (e) concrete elements. install washer and dryer | $60,000 |
| Aug 27, 2026 | In progress issued Aug 2026 | 440 Davis Ct | unit 512- kitchen and bathroom remodel in kind like for likeDetails
unit 512- kitchen and bathroom remodel in kind like for like | $70,000 |
| Aug 27, 2026 | In progress issued Aug 2026 | 440 Davis Ct | unit 1701- kitchen and bathroom remodel in kind like for likeDetails
unit 1701- kitchen and bathroom remodel in kind like for like | $70,000 |
| Aug 25, 2026 | In progress issued Aug 2026 | 550 Battery St | unit#: 1410: one bathroom one kitchen remodel in kind like for like.Details
unit#: 1410: one bathroom one kitchen remodel in kind like for like. | $60,000 |
| Aug 25, 2026 | Completed final sign-off Sep 2026 | 550 Battery St | unit#: 1809: one bathroom one kitchen remodel in kind like for like.Details
unit#: 1809: one bathroom one kitchen remodel in kind like for like. | $60,000 |
| Aug 20, 2026 | Completed final sign-off Sep 2026 | 550 Battery St | unit #918: one kitchen, one bathroom remodel in kind like for like. kitchen approximately 80sf, bathroom approximately 42sf.Details
unit #918: one kitchen, one bathroom remodel in kind like for like. kitchen approximately 80sf, bathroom approximately 42sf. | $60,000 |
| Aug 20, 2026 | In progress issued Aug 2026 | 550 Battery St | unit #1018: one kitchen (80sf), one bathroom (42sf) remodel in kind like for like.Details
unit #1018: one kitchen (80sf), one bathroom (42sf) remodel in kind like for like. | $60,000 |
| Aug 20, 2026 | In progress issued Aug 2026 | 550 Battery St | unit #511: one kitchen, one bathroom remodel in kind like for like. kitchen approximately 94sf, bathroom approximately 42sf.Details
unit #511: one kitchen, one bathroom remodel in kind like for like. kitchen approximately 94sf, bathroom approximately 42sf. | $60,000 |
| Aug 18, 2026 | Completed final sign-off Sep 2026 | 550 Battery St | unit 2110: rehabilitate e) kitchen & bathroom, no removal of structural walls, install washer/dryerDetails
unit 2110: rehabilitate e) kitchen & bathroom, no removal of structural walls, install washer/dryer | $60,000 |
| Aug 18, 2026 | In progress issued Aug 2026 | 550 Battery St | unit#: 1017. rehabitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
unit#: 1017. rehabitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 |
| Aug 18, 2026 | Completed final sign-off Sep 2026 | 550 Battery St | unit#: 1515. rehabitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
unit#: 1515. rehabitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 |
| Aug 11, 2026 | Completed final sign-off Sep 2026 | 550 Battery St | unit 1308: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
unit 1308: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 |
| Aug 5, 2026 | Completed final sign-off Sep 2026 | 155 Jackson St | unit 1205: one kitchen and one bathroom remodel in kind, new fixtures, new counter tops, new flooring. no tub to shower conversions.Details
unit 1205: one kitchen and one bathroom remodel in kind, new fixtures, new counter tops, new flooring. no tub to shower conversions. | $64,000 |
| Aug 3, 2026 | Completed final sign-off Sep 2026 | 440 Davis Ct | unit#2211: 1 kitchen and 1 bathroom remodel in kind like for like.Details
unit#2211: 1 kitchen and 1 bathroom remodel in kind like for like. | $40,000 |
| Aug 3, 2026 | Completed final sign-off Sep 2026 | 155 Jackson St | unit 1501: one kitchen and one bathroom rmodel in kind, no tub conversions, new fixtures, new counter tops, new flooring, update plumbing and electrical.Details
unit 1501: one kitchen and one bathroom rmodel in kind, no tub conversions, new fixtures, new counter tops, new flooring, update plumbing and electrical. | $64,000 |
| Jul 20, 2026 | Completed final sign-off Sep 2026 | 405 Davis Ct | unit 1807- remodel (e) kitchen and (2) bathrooms. no removal of structural walls. install washer and dryer.Details
unit 1807- remodel (e) kitchen and (2) bathrooms. no removal of structural walls. install washer and dryer. | $60,000 |
| Jul 20, 2026 | Completed final sign-off Sep 2026 | 440 Davis Ct | unit 1601- remodel (e) kitchen and bathroom. no removal of structural walls. install washer and dryer. kitchen approximately 107sf, bathroom approximately, 42sf.Details
unit 1601- remodel (e) kitchen and bathroom. no removal of structural walls. install washer and dryer. kitchen approximately 107sf, bathroom approximately, 42sf. | $60,000 |
| Jul 16, 2026 | Completed final sign-off Aug 2026 | 440 Davis Ct | unit 2212: 1 kitchen and 2 bathroom remodels in kind like for like. no change to floor layout. no change to wall layout. no structural work.Details
unit 2212: 1 kitchen and 2 bathroom remodels in kind like for like. no change to floor layout. no change to wall layout. no structural work. | $60,000 |
| Jul 14, 2026 | Completed final sign-off Aug 2026 | 155 Jackson St | unit #2102: (1) kitchen, (1) bathroom remodel in kind, like for like. kitchen approximately 80sf, bathroom approximaltey 41sf.Details
unit #2102: (1) kitchen, (1) bathroom remodel in kind, like for like. kitchen approximately 80sf, bathroom approximaltey 41sf. | $60,000 |
| Jul 14, 2026 | In progress issued Jul 2026 | 440 Davis Ct | unit #1807: (1) kitchen, (1) bathroom remodel in kind, like for like. kitchen approximately 95sf, bathroom approximately 35sf.Details
unit #1807: (1) kitchen, (1) bathroom remodel in kind, like for like. kitchen approximately 95sf, bathroom approximately 35sf. | $60,000 |
| Jul 14, 2026 | Completed final sign-off Aug 2026 | 405 Davis Ct | unit #1104: (1) kitchen, (1) bathroom remodel in kind, like for like. kitchen approximately 80sf, bathroom approximaltey 41sf.Details
unit #1104: (1) kitchen, (1) bathroom remodel in kind, like for like. kitchen approximately 80sf, bathroom approximaltey 41sf. | $60,000 |
| Jul 7, 2026 | Completed final sign-off Aug 2026 | 440 Davis Ct | unit 1807- remodel (e) kitchen and bathroom. no removal of structural walls. install washer and dryerDetails
unit 1807- remodel (e) kitchen and bathroom. no removal of structural walls. install washer and dryer | $60,000 |
| Jul 7, 2026 | Completed final sign-off Aug 2026 | 440 Davis Ct | unit 1410: rehabilitate existing kitchen and bathrom. no removal of structural walls. install washer and dryer.Details
unit 1410: rehabilitate existing kitchen and bathrom. no removal of structural walls. install washer and dryer. | $60,000 |
| Jun 24, 2026 | Completed final sign-off Oct 2026 | 550 Battery St | unit 08: rehabilitate existing kitchen and bathroom. no removal of structural walls. replace and relocate washer and dryer.Details
unit 08: rehabilitate existing kitchen and bathroom. no removal of structural walls. replace and relocate washer and dryer. | $60,000 |
| Jun 23, 2026 | Completed final sign-off Jul 2026 | 440 Davis Ct | unit 2108: one kitchen and one bathroom remodel in-kind; like for like.Details
unit 2108: one kitchen and one bathroom remodel in-kind; like for like. | $60,000 |
| Jun 23, 2026 | Completed final sign-off Jul 2026 | 155 Jackson St | unit 1705: one kitchen and 1 bathroom remodel like for like.Details
unit 1705: one kitchen and 1 bathroom remodel like for like. | $60,000 |
| Jun 23, 2026 | Completed final sign-off Jul 2026 | 155 Jackson St | unit 1105: one kitchen, one bathroom remodel in-kind; like for like.Details
unit 1105: one kitchen, one bathroom remodel in-kind; like for like. | $60,000 |
| Jun 16, 2026 | In progress issued Jun 2026 | 550 Battery St | unit#: 310: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls. no new penetrations into existing concrete elements.Details
unit#: 310: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls. no new penetrations into existing concrete elements. | $60,000 |
| Jun 16, 2026 | Completed final sign-off Sep 2026 | 550 Battery St | unit 1604: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls. no new penetrations into existing concrete elements.Details
unit 1604: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls. no new penetrations into existing concrete elements. | $60,000 |
| Jun 11, 2026 | Completed final sign-off Jul 2026 | 440 Davis Ct | unit#: 413: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls. no new penetration into exisiting concrete elements.Details
unit#: 413: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls. no new penetration into exisiting concrete elements. | $60,000 |
| Jun 11, 2026 | Completed final sign-off Sep 2026 | 550 Battery St | unit#: 1910: rehabitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls. no new penetrations into existing concrete elements.Details
unit#: 1910: rehabitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls. no new penetrations into existing concrete elements. | $60,000 |
| Jun 4, 2026 | Completed final sign-off Aug 2026 | 155 Jackson St | unit 301: rehabilitate e kitchen and bathroom. replace existing washer and dryer. no removal of structural walls. no new penetrations into existing concrete elements.Details
unit 301: rehabilitate e kitchen and bathroom. replace existing washer and dryer. no removal of structural walls. no new penetrations into existing concrete elements. | $60,000 |
| May 28, 2026 | Completed final sign-off Jun 2026 | 405 Davis Ct | unit #1001: (1) kitchen, (1) bathroom remodel in kind, like for like.Details
unit #1001: (1) kitchen, (1) bathroom remodel in kind, like for like. | $60,000 |
| May 28, 2026 | Completed final sign-off Jun 2026 | 155 Jackson St | unit 2302: one kitchen and one bathroom remodel in kind, like for like.Details
unit 2302: one kitchen and one bathroom remodel in kind, like for like. | $60,000 |
| May 28, 2026 | Completed final sign-off Jul 2026 | 155 Jackson St | unit 1907: rehabilitate (e) kitchen and bathroom. install washer and dryer. no removal of structural walls. no new penetrations into (e) concrete elements.Details
unit 1907: rehabilitate (e) kitchen and bathroom. install washer and dryer. no removal of structural walls. no new penetrations into (e) concrete elements. | $60,000 |
| May 14, 2026 | Completed final sign-off Jul 2026 | 440 Davis Ct | unit#1708: rehabitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls.Details
unit#1708: rehabitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls. | $60,000 |
| May 14, 2026 | Completed final sign-off Jul 2026 | 440 Davis Ct | unit#: 2107: rehabiliate existing kitchen and bathroom install washer and dryer. no remoral of structural walls.Details
unit#: 2107: rehabiliate existing kitchen and bathroom install washer and dryer. no remoral of structural walls. | $60,000 |
| May 14, 2026 | Completed final sign-off Jun 2026 | 550 Battery St | unit#: 811: one kitchen, two bedroom remodel in kind. like for like.Details
unit#: 811: one kitchen, two bedroom remodel in kind. like for like. | $60,000 |
| May 14, 2026 | Completed final sign-off Jul 2026 | 440 Davis Ct | unit#: 1408: one kitchen one bathroom remodel in kind. like and like.Details
unit#: 1408: one kitchen one bathroom remodel in kind. like and like. | $60,000 |
| May 7, 2026 | Completed final sign-off Jun 2026 | 440 Davis Ct | unit #521: rehabilitate (e) kitchen and bathroom install washer and dryer, no removal of structural walls. no new penetratrion into (e) concrete elementsDetails
unit #521: rehabilitate (e) kitchen and bathroom install washer and dryer, no removal of structural walls. no new penetratrion into (e) concrete elements | $60,000 |
| May 7, 2026 | Completed final sign-off Jul 2026 | 440 Davis Ct | unit #305: rehabilitate (e) kitchen and bathroom install washer and dryer, no removal of structural walls.no new penetratrion into (e) concrete elementsDetails
unit #305: rehabilitate (e) kitchen and bathroom install washer and dryer, no removal of structural walls.no new penetratrion into (e) concrete elements | $60,000 |
| May 7, 2026 | Completed final sign-off Jul 2026 | 440 Davis Ct | unit #501: rehabilitate (e) kitchen and bathroom install washer and dryer, no removal of structural walls. no new penetratrion into (e) concrete elementsDetails
unit #501: rehabilitate (e) kitchen and bathroom install washer and dryer, no removal of structural walls. no new penetratrion into (e) concrete elements | $60,000 |
| Apr 28, 2026 | Completed final sign-off Jun 2026 | 550 Battery St | unit 1905: rehablitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls.Details
unit 1905: rehablitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls. | $60,000 |
| Apr 28, 2026 | Completed final sign-off Jun 2026 | 550 Battery St | unit 1520: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls.Details
unit 1520: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls. | $60,000 |
| Apr 28, 2026 | Completed final sign-off Jun 2026 | 405 Davis Ct | unit#: 2208. one kitchen one bathroom remodel in kind like for like.Details
unit#: 2208. one kitchen one bathroom remodel in kind like for like. | $60,000 |
| Apr 21, 2026 | Completed final sign-off May 2026 | 440 Davis Ct | unit 1211: one kitchen one bathroom remodel in kind. like for like.Details
unit 1211: one kitchen one bathroom remodel in kind. like for like. | $60,000 |
| Apr 14, 2026 | Completed final sign-off Jun 2026 | 440 Davis Ct | unit #320: one kitchen and one bathroom remodel in-kind, like for like.Details
unit #320: one kitchen and one bathroom remodel in-kind, like for like. | $60,000 |
| Apr 9, 2026 | Completed final sign-off May 2026 | 155 Jackson St | #304: revision to pa#202602176000: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls.Details
#304: revision to pa#202602176000: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls. | $60,000 |
| Apr 2, 2026 | Completed final sign-off Jun 2026 | 440 Davis Ct | #809:rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
#809:rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 |
| Apr 2, 2026 | Completed final sign-off Jun 2026 | 550 Battery St | #1418: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
#1418: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 |
| Apr 2, 2026 | Completed final sign-off Jun 2026 | 550 Battery St | unit 2216: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
unit 2216: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 |
| Mar 23, 2026 | In progress issued Mar 2026 | 440 Davis Ct | revision 202602176002-unit 1406: remodel (e) kitchen and bathroom. no removal of structrual walls. install washer and dryer.Details
revision 202602176002-unit 1406: remodel (e) kitchen and bathroom. no removal of structrual walls. install washer and dryer. | |
| Mar 23, 2026 | Completed final sign-off May 2026 | 550 Battery St | unit 1404: remodel (e) kitchen and bathroom. no removal of structrual walls. install washer and dryer.Details
unit 1404: remodel (e) kitchen and bathroom. no removal of structrual walls. install washer and dryer. | $60,000 |
| Mar 19, 2026 | Completed final sign-off May 2026 | 550 Battery St | unit 2209; rehabitlitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
unit 2209; rehabitlitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 |
| Mar 10, 2026 | Completed final sign-off May 2026 | 155 Jackson St | unit #1504: one bathroom one kitchen remodel in kind like for like.Details
unit #1504: one bathroom one kitchen remodel in kind like for like. | $60,000 |
| Mar 10, 2026 | Completed final sign-off Apr 2026 | 405 Davis Ct | unit #605: one bathroom one kitchen remodel in kind like for like.Details
unit #605: one bathroom one kitchen remodel in kind like for like. | $60,000 |
| Mar 5, 2026 | Completed final sign-off Apr 2026 | 440 Davis Ct | unit 812: one kitchen and bathroom remodel in kind.Details
unit 812: one kitchen and bathroom remodel in kind. | $60,000 |
| Mar 5, 2026 | Completed final sign-off Apr 2026 | 155 Jackson St | unit 1805: one kitchen and bathroom remodel like for like.Details
unit 1805: one kitchen and bathroom remodel like for like. | $60,000 |
| Feb 17, 2026 | Completed final sign-off May 2026 | 440 Davis Ct | unit #1406: one kitchen, one bathroom. remodel in kind like for like.Details
unit #1406: one kitchen, one bathroom. remodel in kind like for like. | $60,000 |
| Feb 17, 2026 | In progress issued Feb 2026 | 155 Jackson St | unit #304: one kitchen, one bathroom. remodel in kind like for like.Details
unit #304: one kitchen, one bathroom. remodel in kind like for like. | $60,000 |
| Feb 17, 2026 | Completed final sign-off Apr 2026 | 405 Davis Ct | unit #702: one kitchen, one bathroom. remodel in kind like for like.Details
unit #702: one kitchen, one bathroom. remodel in kind like for like. | $60,000 |
| Feb 12, 2026 | Completed final sign-off Apr 2026 | 550 Battery St | unit#1312: one kitchen, one bathroom,remodel in kind like for likeDetails
unit#1312: one kitchen, one bathroom,remodel in kind like for like | $60,000 |
| Feb 10, 2026 | Completed final sign-off Apr 2026 | 440 Davis Ct | unit#: 2114: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryers.Details
unit#: 2114: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryers. | $60,000 |
| Feb 5, 2026 | Completed final sign-off Apr 2026 | 440 Davis Ct | unit #42 - rehabilitate existing 1st floor kitchen and 2nd floor bathroom, relocate washer and elec dryer from 1st to 2nd floor of unit. no removal of structural walls.Details
unit #42 - rehabilitate existing 1st floor kitchen and 2nd floor bathroom, relocate washer and elec dryer from 1st to 2nd floor of unit. no removal of structural walls. | $60,000 |
| Feb 5, 2026 | Completed final sign-off Mar 2026 | 440 Davis Ct | unit: 401. one bathroom, one kitchen remodel in kind. like for likeDetails
unit: 401. one bathroom, one kitchen remodel in kind. like for like | $60,000 |
| Feb 5, 2026 | Completed final sign-off Apr 2026 | 440 Davis Ct | unit#: 403; rehabitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
unit#: 403; rehabitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 |
| Feb 3, 2026 | Completed final sign-off Apr 2026 | 550 Battery St | unit #1120/ rahabilitate: (1) kitchen, (1) bathroom remodel no removal of structural walls. install washer and dryer.Details
unit #1120/ rahabilitate: (1) kitchen, (1) bathroom remodel no removal of structural walls. install washer and dryer. | $60,000 |
| Feb 3, 2026 | Completed final sign-off Apr 2026 | 550 Battery St | unit #820/ rahabilitate: (1) kitchen, (1) bathroom remodel no removal of structural walls. install washer and dryer.Details
unit #820/ rahabilitate: (1) kitchen, (1) bathroom remodel no removal of structural walls. install washer and dryer. | $60,000 |
| Jan 29, 2026 | Completed final sign-off Apr 2026 | 550 Battery St | unit #1901: (1) kitchen, (1) bathroom remodel in kind, like for like.Details
unit #1901: (1) kitchen, (1) bathroom remodel in kind, like for like. | $60,000 |
| Jan 29, 2026 | Completed final sign-off Mar 2026 | 440 Davis Ct | unit#1221: one kitchen, one bathroom remodel in kind, like for likeDetails
unit#1221: one kitchen, one bathroom remodel in kind, like for like | $60,000 |
| Jan 29, 2026 | Completed final sign-off Apr 2026 | 550 Battery St | unit #907: (1) kitchen, (1) bathroom remodel in kind, like for like.Details
unit #907: (1) kitchen, (1) bathroom remodel in kind, like for like. | $60,000 |
| Jan 29, 2026 | Completed final sign-off Apr 2026 | 405 Davis Ct | unit #2302: (1) kitchen, (1) bathroom remodel in kind, like for like.Details
unit #2302: (1) kitchen, (1) bathroom remodel in kind, like for like. | $60,000 |
| Jan 26, 2026 | Completed final sign-off Apr 2026 | 155 Jackson St | unit #1802 - one kitchen, one bathroom remodel in kind, like for like.Details
unit #1802 - one kitchen, one bathroom remodel in kind, like for like. | $60,000 |
| Jan 26, 2026 | Completed final sign-off Apr 2026 | 405 Davis Ct | unit #1007 - one kitchen, one bathroom remodel in kind, like for like.Details
unit #1007 - one kitchen, one bathroom remodel in kind, like for like. | $60,000 |
| Jan 26, 2026 | Completed final sign-off Apr 2026 | 550 Battery St | unit#1415: one kitchen, one bathroom remodel in kind, like for likeDetails
unit#1415: one kitchen, one bathroom remodel in kind, like for like | $60,000 |
| Jan 26, 2026 | Completed final sign-off Mar 2026 | 440 Davis Ct | unit #1508 - one kitchen, one bathroom remodel in kind, like for like.Details
unit #1508 - one kitchen, one bathroom remodel in kind, like for like. | $60,000 |
| Jan 13, 2026 | Completed final sign-off Apr 2026 | 440 Davis Ct | unit #1913: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer & dryerDetails
unit #1913: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer & dryer | $60,000 |
| Jan 13, 2026 | Completed final sign-off Apr 2026 | 440 Davis Ct | unit #619: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer & dryerDetails
unit #619: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer & dryer | $60,000 |
| Jan 8, 2026 | Completed final sign-off Apr 2026 | 550 Battery St | unit#: 316; rehabiliate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
unit#: 316; rehabiliate existing kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 |
| Jan 8, 2026 | Completed final sign-off Apr 2026 | 550 Battery St | unit#: 1902; rehabiliate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
unit#: 1902; rehabiliate existing kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 |
| Jan 8, 2026 | Completed final sign-off Mar 2026 | 550 Battery St | unit#: 419; rehabiliate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
unit#: 419; rehabiliate existing kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 |
| Jan 6, 2026 | Completed final sign-off Mar 2026 | 550 Battery St | unit #35: rehabilitate (e) kitchen and bathroom. relocate washer and dryerDetails
unit #35: rehabilitate (e) kitchen and bathroom. relocate washer and dryer | $60,000 |
| Jan 6, 2026 | Completed final sign-off Feb 2026 | 155 Jackson St | unit 503: rehabilitate existing kitchen and bath. no removal of structural walls. install washer and dryer.Details
unit 503: rehabilitate existing kitchen and bath. no removal of structural walls. install washer and dryer. | $60,000 |
| Dec 18, 2025 | Completed final sign-off Mar 2026 | 405 Davis Ct | unit #602: one kitchen, one bathroom. remodel in kind like for like.Details
unit #602: one kitchen, one bathroom. remodel in kind like for like. | $20,000 |
| Dec 18, 2025 | Completed final sign-off Mar 2026 | 405 Davis Ct | unit #1102: one kitchen, one bathroom remodel in kind like for like.Details
unit #1102: one kitchen, one bathroom remodel in kind like for like. | $60,000 |
| Dec 18, 2025 | Completed final sign-off Mar 2026 | 405 Davis Ct | unit #1301: (1) kitchen, (1) bathroom remodel in kind, like for like.Details
unit #1301: (1) kitchen, (1) bathroom remodel in kind, like for like. | $20,000 |
| Dec 18, 2025 | Completed final sign-off Mar 2026 | 155 Jackson St | unit #702: one kitchen, one bathroom. remodel in kind like for like.Details
unit #702: one kitchen, one bathroom. remodel in kind like for like. | $20,000 |
| Dec 16, 2025 | Completed final sign-off Feb 2026 | 550 Battery St | unit#: 611; rehabiliate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
unit#: 611; rehabiliate existing kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 |
| Dec 11, 2025 | Completed final sign-off Feb 2026 | 550 Battery St | unit 1007; one kitchen, one bathroom remodel in kind like for like. no removal of wallsDetails
unit 1007; one kitchen, one bathroom remodel in kind like for like. no removal of walls | $60,000 |
| Dec 11, 2025 | Completed final sign-off Mar 2026 | 405 Davis Ct | unit 1002; one kitchen, one bathroom remodel in kind like for like.Details
unit 1002; one kitchen, one bathroom remodel in kind like for like. | $60,000 |
| Dec 11, 2025 | Completed final sign-off Mar 2026 | 440 Davis Ct | unit 322; one kitchen, one bathroom remodel in kind like for like.Details
unit 322; one kitchen, one bathroom remodel in kind like for like. | $60,000 |
| Dec 10, 2025 | Completed final sign-off Feb 2026 | 405 Davis Ct | unit#604: rehabilitate existing kitchen and bathroom. no removal or structural wallsDetails
unit#604: rehabilitate existing kitchen and bathroom. no removal or structural walls | $60,000 |
| Dec 10, 2025 | Completed final sign-off Jan 2026 | 440 Davis Ct | unit 2005- remodel (e) kitchen and bathroom . no removal of sturctural walls.Details
unit 2005- remodel (e) kitchen and bathroom . no removal of sturctural walls. | $60,000 |
| Dec 10, 2025 | Completed final sign-off Jan 2026 | 550 Battery St | unit 2016- remodel (e) kitchen and bathroom . no removal of sturctural walls.Details
unit 2016- remodel (e) kitchen and bathroom . no removal of sturctural walls. | $60,000 |
| Dec 4, 2025 | Completed final sign-off Jan 2026 | 440 Davis Ct | unit 1806: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit 1806: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Dec 4, 2025 | Completed final sign-off Feb 2026 | 405 Davis Ct | unit #802: swap plumbing, electrical & finishes like for like. one kitchen and one bath remodel like for like.Details
unit #802: swap plumbing, electrical & finishes like for like. one kitchen and one bath remodel like for like. | $800 |
| Dec 4, 2025 | Completed final sign-off Jan 2026 | 440 Davis Ct | unit 2221: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit 2221: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Dec 2, 2025 | Completed final sign-off Jan 2026 | 440 Davis Ct | unit#: 614. rehabilitate existing kitchen and bathroom. no removal of structrual walls.Details
unit#: 614. rehabilitate existing kitchen and bathroom. no removal of structrual walls. | $60,000 |