Back to kitchen remodel contractors
Jin Qing Construction Corp.
- Based in
- Burlingame
- On San Francisco permits
- Sep 2017 to Aug 2026
- Last 24 months
- 13 permits filed
55 permits since 2000: 48 completed, 5 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
27 kitchen remodel permits: 25 completed, 2 in progress. Typically 4 days from filing to permit and 275 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 20, 2026 | In progress issued Aug 2026 | 2435 28th Av | 2nd flr: kitchen and bathroom remodel like for like, no tub conversion. restore front facade to stucco finish (approx 500 sq ft.), replace 5 windows with new vinyl windows (same size, location and operation) in kind., front of property, street facing windows. bathroom 40 sq ft. kitchen 120 sq ft.Details
2nd flr: kitchen and bathroom remodel like for like, no tub conversion. restore front facade to stucco finish (approx 500 sq ft.), replace 5 windows with new vinyl windows (same size, location and operation) in kind., front of property, street facing windows. bathroom 40 sq ft. kitchen 120 sq ft. | $66,000 |
| Apr 2, 2026 | Completed final sign-off Apr 2026 | 2440 Balboa St | as-built floor plans to pa 202507019912: unit 2440 reconfiguration kitchen & wall partition. unit 2442 reconfigurate kitchen & wall partition. no plumbing fixture changeDetails
as-built floor plans to pa 202507019912: unit 2440 reconfiguration kitchen & wall partition. unit 2442 reconfigurate kitchen & wall partition. no plumbing fixture change | $2,000 |
| Jul 1, 2025 | Completed final sign-off Apr 2026 | 2440 Balboa St | interior remodel - unit 2440: remodel bathroom and bedroom. relocated kitchen. add one bathroom and bedroom. unit 2442: remodel bathroom and bedroom. relocate kitchen, add one bathroom and bedroom. replace interior finishes w/type "x" gtp at both unitsDetails
interior remodel - unit 2440: remodel bathroom and bedroom. relocated kitchen. add one bathroom and bedroom. unit 2442: remodel bathroom and bedroom. relocate kitchen, add one bathroom and bedroom. replace interior finishes w/type "x" gtp at both units | $95,000 |
| Nov 12, 2024 | Completed final sign-off Feb 2025 | 2155 46th Av | revision to 202408269448: 1/f relocate wet bar & laundry approved from original. 2/f reconfigure kitchen layout & delect rear stairs. no plumbing fixture changeDetails
revision to 202408269448: 1/f relocate wet bar & laundry approved from original. 2/f reconfigure kitchen layout & delect rear stairs. no plumbing fixture change | |
| Sep 12, 2024 | In progress issued May 2025 | 217 Gold Mine Dr | (n) partial lightwell infill additions at first & second floors. interior remodel entire (e) house. lowering of (e) dining and (e) kitchen floor areas. add (n) exterior windows, doors, & skylights. add (n) exterior staircase.Details
(n) partial lightwell infill additions at first & second floors. interior remodel entire (e) house. lowering of (e) dining and (e) kitchen floor areas. add (n) exterior windows, doors, & skylights. add (n) exterior staircase. | $300,000 |
| Jul 8, 2024 | Completed final sign-off Feb 2025 | 2155 46th Av | 2nd floor: remodel kitchen & bathroom. replace (e) plaster wall finishes w/ 5/8" type "x" gtp.bd. (n) electrical wiring.Details
2nd floor: remodel kitchen & bathroom. replace (e) plaster wall finishes w/ 5/8" type "x" gtp.bd. (n) electrical wiring. | $50,000 |
| Aug 23, 2023 | Completed final sign-off Aug 2024 | 425 Country Club Dr | 1/f: remodel family room and bathroom relocated laundry. add (2) bedrooms and bath. removed fire place at rear. 2/f: reconfigure interior layout. remodel kitchen, dining, living room and bedrooms. add (5) skylights. no work at front facade.Details
1/f: remodel family room and bathroom relocated laundry. add (2) bedrooms and bath. removed fire place at rear. 2/f: reconfigure interior layout. remodel kitchen, dining, living room and bedrooms. add (5) skylights. no work at front facade. | $350,000 |
| May 13, 2022 | Completed final sign-off Oct 2022 | 2247 29th Av | revision to no-plan permit 202201196257. 2/f: relocate interior stairs, kitchen, bath, dining and bedroom. add office, bathroom and 3 skylights. 1/f: remodel bathroom, bedrooms, relocate family room, washer and dryer. add bedroom, bathroom, rear deck. replace windows @ read & side.Details
revision to no-plan permit 202201196257. 2/f: relocate interior stairs, kitchen, bath, dining and bedroom. add office, bathroom and 3 skylights. 1/f: remodel bathroom, bedrooms, relocate family room, washer and dryer. add bedroom, bathroom, rear deck. replace windows @ read & side. | $180,000 |
| Jan 19, 2022 | Completed final sign-off Apr 2023 | 615 21st Av | infill lightwell, 1/f relocate bath, family room, add powder room & wet bar and office; 2/f relocate bedroom, bath, kitchen, dining & living room, add (1) full bath & (4) skylights, study room.Details
infill lightwell, 1/f relocate bath, family room, add powder room & wet bar and office; 2/f relocate bedroom, bath, kitchen, dining & living room, add (1) full bath & (4) skylights, study room. | $300,000 |
| Jan 19, 2022 | Completed final sign-off Oct 2022 | 2247 29th Av | remodel kitchen and bathroom at 2nd floor, replace (e) plaster wall finishes at family room, dining and bedrooms in kind w/ 5/8 gyp bd. (n) electrical wiriing. no wall layout changes.Details
remodel kitchen and bathroom at 2nd floor, replace (e) plaster wall finishes at family room, dining and bedrooms in kind w/ 5/8 gyp bd. (n) electrical wiriing. no wall layout changes. | $50,000 |
| Dec 14, 2021 | Completed final sign-off Jan 2023 | 1200 Eucalyptus Dr | remodel bathroom and kitchen at 2nd floor: replace (e) wall plaster with 5/8" type "x" sheetrock and add insulation at bathroom & kitchen. (n) electrical wiring. (n) plumbing. no alteration of wall, window or door.Details
remodel bathroom and kitchen at 2nd floor: replace (e) wall plaster with 5/8" type "x" sheetrock and add insulation at bathroom & kitchen. (n) electrical wiring. (n) plumbing. no alteration of wall, window or door. | $100,000 |
| Aug 25, 2021 | Completed final sign-off Jun 2022 | 72 Meadowbrook Dr | additional work pa 2021-0525-0978 & comply with complaint 202180274. 1st fl - remodel bedroom, add 1 bedroom, bath, wet bar & media room 2nd fl - relocated kitchen interior stairs. remodel bedroom & bath. add study, bath. (4) skylights & infill patioDetails
additional work pa 2021-0525-0978 & comply with complaint 202180274. 1st fl - remodel bedroom, add 1 bedroom, bath, wet bar & media room 2nd fl - relocated kitchen interior stairs. remodel bedroom & bath. add study, bath. (4) skylights & infill patio | $120,000 |
| Jun 29, 2021 | Completed final sign-off Jan 2024 | 1315 Monterey Bl | revision to 201709209130. reconfigure interior stairs. replace all front windows in-kind with wood windows. basement: add 1 full bath & new deck. 1st fl: remodel half bath, add 1 full bath. 2nd fl: remodel kitchen & bath. 3rd fl: remodel bath & add 1 full bath.Details
revision to 201709209130. reconfigure interior stairs. replace all front windows in-kind with wood windows. basement: add 1 full bath & new deck. 1st fl: remodel half bath, add 1 full bath. 2nd fl: remodel kitchen & bath. 3rd fl: remodel bath & add 1 full bath. | |
| May 25, 2021 | Completed final sign-off Jun 2022 | 72 Meadowbrook Dr | remodel bathroom 7 kitchen on 2/f. replace (e) plaster wall finishes at dining room with 5/8in type x. family room & bedroom sheetroock too. new electrrical wiring.Details
remodel bathroom 7 kitchen on 2/f. replace (e) plaster wall finishes at dining room with 5/8in type x. family room & bedroom sheetroock too. new electrrical wiring. | $45,000 |
| Mar 22, 2021 | Completed final sign-off Aug 2023 | 321 Vernon St | 1st fl: convert media room to bedroom. add 1 bath. remodel stair. add rear deck. 2nd fl: bath & kitchen remodel. relocate fire place. add rear deck to yard. relocate skylight.Details
1st fl: convert media room to bedroom. add 1 bath. remodel stair. add rear deck. 2nd fl: bath & kitchen remodel. relocate fire place. add rear deck to yard. relocate skylight. | $60,000 |
| Jan 29, 2021 | Completed final sign-off Dec 2022 | 2927 Balboa St | (1) to change tiles in the bathroom. (2) to change (countertop only) in the kitchenDetails
(1) to change tiles in the bathroom. (2) to change (countertop only) in the kitchen | $20,000 |
| Sep 25, 2020 | Completed final sign-off Apr 2021 | 1742 28th Av | 1/f: convert family room to bedroom, add 1 bedroom, 1 full bathroom, wet bar & media room. 2/f: reconfigure kitchen & bathroom (amend to 202003046194), add 1 full bathroom & 4 skylights. infill patio & relocated interior stairs.Details
1/f: convert family room to bedroom, add 1 bedroom, 1 full bathroom, wet bar & media room. 2/f: reconfigure kitchen & bathroom (amend to 202003046194), add 1 full bathroom & 4 skylights. infill patio & relocated interior stairs. | $120,000 |
| Mar 4, 2020 | Completed final sign-off Apr 2021 | 1742 28th Av | remodel kitchen & bathroom at 2nd fl. replace (e) plaster wall finishes at family room, dining room & bedrooms, (n) electrical wiringDetails
remodel kitchen & bathroom at 2nd fl. replace (e) plaster wall finishes at family room, dining room & bedrooms, (n) electrical wiring | $50,000 |
| Feb 11, 2020 | Completed final sign-off Oct 2021 | 2975 24th Av | revision to pa #201910164677. voluntary strengthening existing ceiling joist in kitchen area.Details
revision to pa #201910164677. voluntary strengthening existing ceiling joist in kitchen area. | $3,000 |
| Jul 18, 2019 | Completed final sign-off Oct 2021 | 2975 24th Av | 1. convert 1/2 bath to full bath at g/f. remodel kitchen, bath & addd 1 bath. 2/f remdoel 2 bath. add 2 sklylights. re-stucco exteriorDetails
1. convert 1/2 bath to full bath at g/f. remodel kitchen, bath & addd 1 bath. 2/f remdoel 2 bath. add 2 sklylights. re-stucco exterior | $75,000 |
| Jun 4, 2019 | Completed final sign-off Dec 2019 | 2162 43rd Av | divide (e) family room to bedroom. construct 2 full bathrooms @ gr fl; relocate (e) kitchen, bath room; add 1 new bath room & convert (e) kitchen space to dining room @ 2nd fl; re-built (e) interior staircase from 2nd fl down to ground floor; re-built (e) retaining wall at rear of bldgDetails
divide (e) family room to bedroom. construct 2 full bathrooms @ gr fl; relocate (e) kitchen, bath room; add 1 new bath room & convert (e) kitchen space to dining room @ 2nd fl; re-built (e) interior staircase from 2nd fl down to ground floor; re-built (e) retaining wall at rear of bldg | $160,000 |
| Apr 30, 2019 | Completed final sign-off Nov 2019 | 2162 43rd Av | remodel (1) kitchen, replace sink, cabinets, and floor tile. no change to existing floor plan.Details
remodel (1) kitchen, replace sink, cabinets, and floor tile. no change to existing floor plan. | $15,000 |
| Mar 22, 2019 | Completed final sign-off Apr 2019 | 4440 California St | revision to pa# 201901311810. no kitchen and bathroom remodel only replace bathroom tub and kitchen counter top in unit #2.Details
revision to pa# 201901311810. no kitchen and bathroom remodel only replace bathroom tub and kitchen counter top in unit #2. | |
| Jan 31, 2019 | Completed final sign-off Apr 2019 | 4440 California St | unit # 2: remodel kitchen and bathroom, replace cabinets sink, toilet, tub, vanity at e location.Details
unit # 2: remodel kitchen and bathroom, replace cabinets sink, toilet, tub, vanity at e location. | $19,650 |
| May 29, 2018 | Completed final sign-off Jan 2019 | 2038 20th Av | to comply w/complaint #201863931, 2nd fl: reconfig kitchen & bathrm layout, add 2 bathrms & 4 skylights. replace (5) windows at front w/alum clad wood. 1st fl: add family rm, 2 bedrms, 2 full bath, relocate washer & dryer per plan. re-stucco in-kind at front & rear. ref to pa201802272371.Details
to comply w/complaint #201863931, 2nd fl: reconfig kitchen & bathrm layout, add 2 bathrms & 4 skylights. replace (5) windows at front w/alum clad wood. 1st fl: add family rm, 2 bedrms, 2 full bath, relocate washer & dryer per plan. re-stucco in-kind at front & rear. ref to pa201802272371. | $110,000 |
| Feb 27, 2018 | Completed final sign-off Jan 2019 | 2038 20th Av | remodel kitchen. replace cabinets, sink & floor tile.Details
remodel kitchen. replace cabinets, sink & floor tile. | $13,000 |
| Oct 17, 2017 | Completed final sign-off Aug 2018 | 3060 26th Av | 2/f-remodel (e) kitchen, convert 1 (e) bath to 2 bathrooms, upgrade partial ceiling framing, re-built (e) interior staircase down to g/f. g/f-construct 2 bedrooms, family room, laundry room, 2 full bathrooms & 1/2 bathroom. new deck at rear (approx. 22'x8'), remove/replace partial foundationDetails
2/f-remodel (e) kitchen, convert 1 (e) bath to 2 bathrooms, upgrade partial ceiling framing, re-built (e) interior staircase down to g/f. g/f-construct 2 bedrooms, family room, laundry room, 2 full bathrooms & 1/2 bathroom. new deck at rear (approx. 22'x8'), remove/replace partial foundation | $125,000 |