Block 7208, lot 005A
2975 24th Ave
- City’s use
- Single Family Residential
- Built
- 1936
- Stories
- 2
- Units
- 1
- Rooms
- 5 bedrooms, 5 bathrooms
- Building
- 3,060 sq ft
- Lot
- 4,399 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 11, 2020 | Never finaled issued Jun 2020, no final | 2975 24th Av | street spaceDetails
street space | ||
| Feb 11, 2020 | Completed final sign-off Oct 2021 | 2975 24th Av | Jin Qing Construction Corp. | revision to pa #201910164677. voluntary strengthening existing ceiling joist in kitchen area.Details
revision to pa #201910164677. voluntary strengthening existing ceiling joist in kitchen area. | $3,000 |
| Feb 7, 2020 | Completed final sign-off Oct 2021 | 2975 24th Av | Jin Qing Construction Corp. | replace windows in kind at rear and both sides of building. no change at front. all windows to be aluminum clad wood.Details
replace windows in kind at rear and both sides of building. no change at front. all windows to be aluminum clad wood. | $6,000 |
| Oct 16, 2019 | Completed final sign-off Oct 2021 | 2975 24th Av | Jin Qing Construction Corp. | comply with complaint 201986861 - increased pa 2019-0718-6334 valuation to total $300k; remove all plaster interior finishes & replace gyb bd; remove & replace insulationDetails
comply with complaint 201986861 - increased pa 2019-0718-6334 valuation to total $300k; remove all plaster interior finishes & replace gyb bd; remove & replace insulation | $225,000 |
| Jul 18, 2019 | Completed final sign-off Oct 2021 | 2975 24th Av | Jin Qing Construction Corp. | 1. convert 1/2 bath to full bath at g/f. remodel kitchen, bath & addd 1 bath. 2/f remdoel 2 bath. add 2 sklylights. re-stucco exteriorDetails
1. convert 1/2 bath to full bath at g/f. remodel kitchen, bath & addd 1 bath. 2/f remdoel 2 bath. add 2 sklylights. re-stucco exterior | $75,000 |
| Mar 17, 2006 | Completed final sign-off Dec 2006 | 2975 24th Av | Kuality Constructions | remove kitchen, replace (e) kitchen window & patio door with like kind. repair deck less than 50% of the deck element to be replaced). outside kitchen. kitchen is located at rear of house.Details
remove kitchen, replace (e) kitchen window & patio door with like kind. repair deck less than 50% of the deck element to be replaced). outside kitchen. kitchen is located at rear of house. | $15,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.