Jin Qing Construction Corp.
- Based in
- Burlingame
- On San Francisco permits
- Sep 2017 to Aug 2026
- Last 24 months
- 13 permits filed
55 permits since 2000: 48 completed, 5 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 20, 2026 | In progress issued Aug 2026 | 2435 28th Av | 2nd flr: kitchen and bathroom remodel like for like, no tub conversion. restore front facade to stucco finish (approx 500 sq ft.), replace 5 windows with new vinyl windows (same size, location and operation) in kind., front of property, street facing windows. bathroom 40 sq ft. kitchen 120 sq ft.Details
2nd flr: kitchen and bathroom remodel like for like, no tub conversion. restore front facade to stucco finish (approx 500 sq ft.), replace 5 windows with new vinyl windows (same size, location and operation) in kind., front of property, street facing windows. bathroom 40 sq ft. kitchen 120 sq ft. | $66,000 |
| Apr 15, 2026 | In progress issued Apr 2026 | 217 Gold Mine Dr | revision to pa # 202512222369: custom stair w/ glass railing and glass guard rail.Details
revision to pa # 202512222369: custom stair w/ glass railing and glass guard rail. | $1,000 |
| Apr 2, 2026 | Completed final sign-off Apr 2026 | 2440 Balboa St | as-built floor plans to pa 202507019912: unit 2440 reconfiguration kitchen & wall partition. unit 2442 reconfigurate kitchen & wall partition. no plumbing fixture changeDetails
as-built floor plans to pa 202507019912: unit 2440 reconfiguration kitchen & wall partition. unit 2442 reconfigurate kitchen & wall partition. no plumbing fixture change | $2,000 |
| Dec 22, 2025 | In progress issued Dec 2025 | 217 Gold Mine Dr | revision to pa # 2024-0912-0592. convert existing office and gym to new bedroom. new hydronic radiant floor at living room. revise exterior window sizes & types on all building elevations. add a new planter balcony at level 2.Details
revision to pa # 2024-0912-0592. convert existing office and gym to new bedroom. new hydronic radiant floor at living room. revise exterior window sizes & types on all building elevations. add a new planter balcony at level 2. | $2,000 |
| Oct 3, 2025 | Completed final sign-off Jul 2026 | 96 Huntington Dr | to comply with nov 202026771: reconfigure interior layout and rear horizontal extension extension . replace siding to match existing, add windows and skylight per plan, to remove finishes and drywall to perform frame aned electrical and plumbing.Details
to comply with nov 202026771: reconfigure interior layout and rear horizontal extension extension . replace siding to match existing, add windows and skylight per plan, to remove finishes and drywall to perform frame aned electrical and plumbing. | $250,000 |
| Jul 17, 2025 | Completed final sign-off May 2026 | 2440 Balboa St | replace all windows at existing location. window material to be vinyl u-factor less than 0.30Details
replace all windows at existing location. window material to be vinyl u-factor less than 0.30 | $20,000 |
| Jul 2, 2025 | In progress issued Jul 2025 | 217 Gold Mine Dr | revision to pa # 2024-0912-0592. interior post removalDetails
revision to pa # 2024-0912-0592. interior post removal | |
| Jul 1, 2025 | Completed final sign-off Apr 2026 | 2440 Balboa St | interior remodel - unit 2440: remodel bathroom and bedroom. relocated kitchen. add one bathroom and bedroom. unit 2442: remodel bathroom and bedroom. relocate kitchen, add one bathroom and bedroom. replace interior finishes w/type "x" gtp at both unitsDetails
interior remodel - unit 2440: remodel bathroom and bedroom. relocated kitchen. add one bathroom and bedroom. unit 2442: remodel bathroom and bedroom. relocate kitchen, add one bathroom and bedroom. replace interior finishes w/type "x" gtp at both units | $95,000 |
| Jun 26, 2025 | Completed final sign-off Jul 2026 | 585 Junipero Serra Bl | construct 2 bedrooms, 2 bathrooms, media room & install wetbar. all work at g/f.Details
construct 2 bedrooms, 2 bathrooms, media room & install wetbar. all work at g/f. | $145,000 |
| Jun 13, 2025 | Completed final sign-off Sep 2026 | 217 Gold Mine Dr | shoring permit. deffered submittal to permit pa #202409120592Details
shoring permit. deffered submittal to permit pa #202409120592 | |
| May 13, 2025 | Expired or cancelled cancelled Oct 2025 | 96 Huntington Dr | to comply w/ nov. renew pa# 201809251380 for final inspectionDetails
to comply w/ nov. renew pa# 201809251380 for final inspection | |
| Nov 26, 2024 | Completed final sign-off Aug 2025 | 51 Rosewood Dr | add (1) full bathroom, wet bar & replaced windows at rear of (e) family room at lower level per plan.Details
add (1) full bathroom, wet bar & replaced windows at rear of (e) family room at lower level per plan. | $29,000 |
| Nov 12, 2024 | Completed final sign-off Feb 2025 | 2155 46th Av | revision to 202408269448: 1/f relocate wet bar & laundry approved from original. 2/f reconfigure kitchen layout & delect rear stairs. no plumbing fixture changeDetails
revision to 202408269448: 1/f relocate wet bar & laundry approved from original. 2/f reconfigure kitchen layout & delect rear stairs. no plumbing fixture change | |
| Sep 12, 2024 | In progress issued May 2025 | 217 Gold Mine Dr | (n) partial lightwell infill additions at first & second floors. interior remodel entire (e) house. lowering of (e) dining and (e) kitchen floor areas. add (n) exterior windows, doors, & skylights. add (n) exterior staircase.Details
(n) partial lightwell infill additions at first & second floors. interior remodel entire (e) house. lowering of (e) dining and (e) kitchen floor areas. add (n) exterior windows, doors, & skylights. add (n) exterior staircase. | $300,000 |
| Sep 10, 2024 | Completed final sign-off Nov 2024 | 425 Country Club Dr | install gazebo canopy at rear yard per planDetails
install gazebo canopy at rear yard per plan | $800 |
| Aug 26, 2024 | Completed final sign-off Feb 2025 | 2155 46th Av | revision to pa# 202407085985. 1/f: remodel family room. add bedroom, bathroom & powder room & wetbar. relocated laundry. 2/f: add pop-out & deck at rear. reconfig interior layout per plan. add bathroom & (3) skylights. add roof deck at pop-out area. replace stucco at front.Details
revision to pa# 202407085985. 1/f: remodel family room. add bedroom, bathroom & powder room & wetbar. relocated laundry. 2/f: add pop-out & deck at rear. reconfig interior layout per plan. add bathroom & (3) skylights. add roof deck at pop-out area. replace stucco at front. | $190,000 |
| Jul 8, 2024 | Completed final sign-off Feb 2025 | 2155 46th Av | 2nd floor: remodel kitchen & bathroom. replace (e) plaster wall finishes w/ 5/8" type "x" gtp.bd. (n) electrical wiring.Details
2nd floor: remodel kitchen & bathroom. replace (e) plaster wall finishes w/ 5/8" type "x" gtp.bd. (n) electrical wiring. | $50,000 |
| Nov 7, 2023 | Completed final sign-off Aug 2024 | 425 Country Club Dr | replace stucco in-kind for entire house. repair/replace dry rotted wood as needed per field 1500 sq ft approx.Details
replace stucco in-kind for entire house. repair/replace dry rotted wood as needed per field 1500 sq ft approx. | $20,000 |
| Oct 16, 2023 | Completed final sign-off Aug 2024 | 425 Country Club Dr | replace (2) window in-kind at front with aluminum clad wood windows. replace in (e) openings u factor < 0.30Details
replace (2) window in-kind at front with aluminum clad wood windows. replace in (e) openings u factor < 0.30 | $3,800 |
| Aug 23, 2023 | Completed final sign-off Aug 2024 | 425 Country Club Dr | 1/f: remodel family room and bathroom relocated laundry. add (2) bedrooms and bath. removed fire place at rear. 2/f: reconfigure interior layout. remodel kitchen, dining, living room and bedrooms. add (5) skylights. no work at front facade.Details
1/f: remodel family room and bathroom relocated laundry. add (2) bedrooms and bath. removed fire place at rear. 2/f: reconfigure interior layout. remodel kitchen, dining, living room and bedrooms. add (5) skylights. no work at front facade. | $350,000 |
| Jul 6, 2023 | Completed final sign-off Jan 2024 | 1315 Monterey Bl | recommencement and completion of work approved under permit application no. 201709209130. 25% of work remaining.Details
recommencement and completion of work approved under permit application no. 201709209130. 25% of work remaining. | |
| Mar 21, 2023 | Completed final sign-off Jan 2024 | 1315 Monterey Bl | revision to permit 202106293464. replace all new windows on all 4 sides. 1/f: reconfigure bathrooms and laundry per layout. add new dog shower. 3/f: reconfigure 2 bathrooms and laundry per layout.Details
revision to permit 202106293464. replace all new windows on all 4 sides. 1/f: reconfigure bathrooms and laundry per layout. add new dog shower. 3/f: reconfigure 2 bathrooms and laundry per layout. | |
| Dec 15, 2022 | Completed final sign-off Aug 2023 | 2739 Balboa St | build deck & stair at rear yard. convert (e) basement into habitable space: 1 family rm, 2 bedrooms, 2 bathrooms.Details
build deck & stair at rear yard. convert (e) basement into habitable space: 1 family rm, 2 bedrooms, 2 bathrooms. | $30,000 |
| Jul 28, 2022 | Completed final sign-off Oct 2022 | 2247 29th Av | as built floor plans to approved pa# 202205134250Details
as built floor plans to approved pa# 202205134250 | |
| Jun 22, 2022 | Completed final sign-off Oct 2022 | 2247 29th Av | re-stucco in-kind at front & side. 450sf.Details
re-stucco in-kind at front & side. 450sf. | $6,500 |
| May 13, 2022 | Completed final sign-off Oct 2022 | 2247 29th Av | revision to no-plan permit 202201196257. 2/f: relocate interior stairs, kitchen, bath, dining and bedroom. add office, bathroom and 3 skylights. 1/f: remodel bathroom, bedrooms, relocate family room, washer and dryer. add bedroom, bathroom, rear deck. replace windows @ read & side.Details
revision to no-plan permit 202201196257. 2/f: relocate interior stairs, kitchen, bath, dining and bedroom. add office, bathroom and 3 skylights. 1/f: remodel bathroom, bedrooms, relocate family room, washer and dryer. add bedroom, bathroom, rear deck. replace windows @ read & side. | $180,000 |
| Feb 4, 2022 | Completed final sign-off Jan 2023 | 1200 Eucalyptus Dr | add new bathroom and media room at existing garage fl.Details
add new bathroom and media room at existing garage fl. | $10,000 |
| Jan 19, 2022 | Completed final sign-off Oct 2022 | 2247 29th Av | remodel kitchen and bathroom at 2nd floor, replace (e) plaster wall finishes at family room, dining and bedrooms in kind w/ 5/8 gyp bd. (n) electrical wiriing. no wall layout changes.Details
remodel kitchen and bathroom at 2nd floor, replace (e) plaster wall finishes at family room, dining and bedrooms in kind w/ 5/8 gyp bd. (n) electrical wiriing. no wall layout changes. | $50,000 |
| Jan 19, 2022 | Completed final sign-off Apr 2023 | 615 21st Av | infill lightwell, 1/f relocate bath, family room, add powder room & wet bar and office; 2/f relocate bedroom, bath, kitchen, dining & living room, add (1) full bath & (4) skylights, study room.Details
infill lightwell, 1/f relocate bath, family room, add powder room & wet bar and office; 2/f relocate bedroom, bath, kitchen, dining & living room, add (1) full bath & (4) skylights, study room. | $300,000 |
| Dec 14, 2021 | Completed final sign-off Jan 2023 | 1200 Eucalyptus Dr | remodel bathroom and kitchen at 2nd floor: replace (e) wall plaster with 5/8" type "x" sheetrock and add insulation at bathroom & kitchen. (n) electrical wiring. (n) plumbing. no alteration of wall, window or door.Details
remodel bathroom and kitchen at 2nd floor: replace (e) wall plaster with 5/8" type "x" sheetrock and add insulation at bathroom & kitchen. (n) electrical wiring. (n) plumbing. no alteration of wall, window or door. | $100,000 |
| Aug 25, 2021 | Completed final sign-off Jun 2022 | 72 Meadowbrook Dr | additional work pa 2021-0525-0978 & comply with complaint 202180274. 1st fl - remodel bedroom, add 1 bedroom, bath, wet bar & media room 2nd fl - relocated kitchen interior stairs. remodel bedroom & bath. add study, bath. (4) skylights & infill patioDetails
additional work pa 2021-0525-0978 & comply with complaint 202180274. 1st fl - remodel bedroom, add 1 bedroom, bath, wet bar & media room 2nd fl - relocated kitchen interior stairs. remodel bedroom & bath. add study, bath. (4) skylights & infill patio | $120,000 |
| Jun 29, 2021 | Completed final sign-off Jan 2024 | 1315 Monterey Bl | revision to 201709209130. reconfigure interior stairs. replace all front windows in-kind with wood windows. basement: add 1 full bath & new deck. 1st fl: remodel half bath, add 1 full bath. 2nd fl: remodel kitchen & bath. 3rd fl: remodel bath & add 1 full bath.Details
revision to 201709209130. reconfigure interior stairs. replace all front windows in-kind with wood windows. basement: add 1 full bath & new deck. 1st fl: remodel half bath, add 1 full bath. 2nd fl: remodel kitchen & bath. 3rd fl: remodel bath & add 1 full bath. | |
| May 25, 2021 | Completed final sign-off Jun 2022 | 72 Meadowbrook Dr | remodel bathroom 7 kitchen on 2/f. replace (e) plaster wall finishes at dining room with 5/8in type x. family room & bedroom sheetroock too. new electrrical wiring.Details
remodel bathroom 7 kitchen on 2/f. replace (e) plaster wall finishes at dining room with 5/8in type x. family room & bedroom sheetroock too. new electrrical wiring. | $45,000 |
| Mar 22, 2021 | Completed final sign-off Aug 2023 | 321 Vernon St | 1st fl: convert media room to bedroom. add 1 bath. remodel stair. add rear deck. 2nd fl: bath & kitchen remodel. relocate fire place. add rear deck to yard. relocate skylight.Details
1st fl: convert media room to bedroom. add 1 bath. remodel stair. add rear deck. 2nd fl: bath & kitchen remodel. relocate fire place. add rear deck to yard. relocate skylight. | $60,000 |
| Jan 29, 2021 | Completed final sign-off Dec 2022 | 2927 Balboa St | (1) to change tiles in the bathroom. (2) to change (countertop only) in the kitchenDetails
(1) to change tiles in the bathroom. (2) to change (countertop only) in the kitchen | $20,000 |
| Sep 25, 2020 | Completed final sign-off Apr 2021 | 1742 28th Av | 1/f: convert family room to bedroom, add 1 bedroom, 1 full bathroom, wet bar & media room. 2/f: reconfigure kitchen & bathroom (amend to 202003046194), add 1 full bathroom & 4 skylights. infill patio & relocated interior stairs.Details
1/f: convert family room to bedroom, add 1 bedroom, 1 full bathroom, wet bar & media room. 2/f: reconfigure kitchen & bathroom (amend to 202003046194), add 1 full bathroom & 4 skylights. infill patio & relocated interior stairs. | $120,000 |
| Mar 4, 2020 | Completed final sign-off Apr 2021 | 1742 28th Av | remodel kitchen & bathroom at 2nd fl. replace (e) plaster wall finishes at family room, dining room & bedrooms, (n) electrical wiringDetails
remodel kitchen & bathroom at 2nd fl. replace (e) plaster wall finishes at family room, dining room & bedrooms, (n) electrical wiring | $50,000 |
| Feb 11, 2020 | Completed final sign-off Oct 2021 | 2975 24th Av | revision to pa #201910164677. voluntary strengthening existing ceiling joist in kitchen area.Details
revision to pa #201910164677. voluntary strengthening existing ceiling joist in kitchen area. | $3,000 |
| Feb 7, 2020 | Completed final sign-off Oct 2021 | 2975 24th Av | replace windows in kind at rear and both sides of building. no change at front. all windows to be aluminum clad wood.Details
replace windows in kind at rear and both sides of building. no change at front. all windows to be aluminum clad wood. | $6,000 |
| Dec 20, 2019 | Completed final sign-off Jan 2020 | 2162 43rd Av | front yard setback, remove concrete replace with landscaping and permeable surface comply with 2019015760 engDetails
front yard setback, remove concrete replace with landscaping and permeable surface comply with 2019015760 eng | $500 |
| Oct 16, 2019 | Completed final sign-off Oct 2021 | 2975 24th Av | comply with complaint 201986861 - increased pa 2019-0718-6334 valuation to total $300k; remove all plaster interior finishes & replace gyb bd; remove & replace insulationDetails
comply with complaint 201986861 - increased pa 2019-0718-6334 valuation to total $300k; remove all plaster interior finishes & replace gyb bd; remove & replace insulation | $225,000 |
| Oct 1, 2019 | Completed final sign-off Nov 2019 | 2162 43rd Av | revision to 201906042366, revise lateral reinforcement on 2nd flr and 1st flr. provide as build structural plan (struct plan change only, no change to bld envelope and facade change)Details
revision to 201906042366, revise lateral reinforcement on 2nd flr and 1st flr. provide as build structural plan (struct plan change only, no change to bld envelope and facade change) | |
| Aug 29, 2019 | Completed final sign-off Nov 2019 | 2162 43rd Av | comply with complaint # 201959504. revision under app#201906042366. 1)revise bath room at ground floor. 2)revise bath room at 2nd floor. 3)remove/replace stucco at front (100 sq ft)Details
comply with complaint # 201959504. revision under app#201906042366. 1)revise bath room at ground floor. 2)revise bath room at 2nd floor. 3)remove/replace stucco at front (100 sq ft) | $8,000 |
| Jul 18, 2019 | Completed final sign-off Oct 2021 | 2975 24th Av | 1. convert 1/2 bath to full bath at g/f. remodel kitchen, bath & addd 1 bath. 2/f remdoel 2 bath. add 2 sklylights. re-stucco exteriorDetails
1. convert 1/2 bath to full bath at g/f. remodel kitchen, bath & addd 1 bath. 2/f remdoel 2 bath. add 2 sklylights. re-stucco exterior | $75,000 |
| Jun 4, 2019 | Completed final sign-off Dec 2019 | 2162 43rd Av | divide (e) family room to bedroom. construct 2 full bathrooms @ gr fl; relocate (e) kitchen, bath room; add 1 new bath room & convert (e) kitchen space to dining room @ 2nd fl; re-built (e) interior staircase from 2nd fl down to ground floor; re-built (e) retaining wall at rear of bldgDetails
divide (e) family room to bedroom. construct 2 full bathrooms @ gr fl; relocate (e) kitchen, bath room; add 1 new bath room & convert (e) kitchen space to dining room @ 2nd fl; re-built (e) interior staircase from 2nd fl down to ground floor; re-built (e) retaining wall at rear of bldg | $160,000 |
| Apr 30, 2019 | Completed final sign-off Nov 2019 | 2162 43rd Av | remodel (1) kitchen, replace sink, cabinets, and floor tile. no change to existing floor plan.Details
remodel (1) kitchen, replace sink, cabinets, and floor tile. no change to existing floor plan. | $15,000 |
| Mar 22, 2019 | Completed final sign-off Apr 2019 | 4440 California St | revision to pa# 201901311810. no kitchen and bathroom remodel only replace bathroom tub and kitchen counter top in unit #2.Details
revision to pa# 201901311810. no kitchen and bathroom remodel only replace bathroom tub and kitchen counter top in unit #2. | |
| Jan 31, 2019 | Completed final sign-off Apr 2019 | 4440 California St | unit # 2: remodel kitchen and bathroom, replace cabinets sink, toilet, tub, vanity at e location.Details
unit # 2: remodel kitchen and bathroom, replace cabinets sink, toilet, tub, vanity at e location. | $19,650 |
| Jun 7, 2018 | Completed final sign-off Aug 2018 | 3060 26th Av | revision to pa 2017-1017-1410 - revise interior staircase & add half bathroom at 2nd fl; relocate 1 full bath room & delete 1 half bath room at ground floor. switch bedroom & family roomDetails
revision to pa 2017-1017-1410 - revise interior staircase & add half bathroom at 2nd fl; relocate 1 full bath room & delete 1 half bath room at ground floor. switch bedroom & family room | |
| May 29, 2018 | Completed final sign-off Jan 2019 | 2038 20th Av | to comply w/complaint #201863931, 2nd fl: reconfig kitchen & bathrm layout, add 2 bathrms & 4 skylights. replace (5) windows at front w/alum clad wood. 1st fl: add family rm, 2 bedrms, 2 full bath, relocate washer & dryer per plan. re-stucco in-kind at front & rear. ref to pa201802272371.Details
to comply w/complaint #201863931, 2nd fl: reconfig kitchen & bathrm layout, add 2 bathrms & 4 skylights. replace (5) windows at front w/alum clad wood. 1st fl: add family rm, 2 bedrms, 2 full bath, relocate washer & dryer per plan. re-stucco in-kind at front & rear. ref to pa201802272371. | $110,000 |
| Mar 22, 2018 | Completed final sign-off Jun 2019 | 1322 29th Av | 1st fl: add 2 bedrooms, 2 full baths, wet bar, media room and laundry. 2nd fl: reconfigure existing layout, remodel ktichen, bath, add study rm and master bath per planDetails
1st fl: add 2 bedrooms, 2 full baths, wet bar, media room and laundry. 2nd fl: reconfigure existing layout, remodel ktichen, bath, add study rm and master bath per plan | $115,000 |
| Feb 27, 2018 | Completed final sign-off Jan 2019 | 2038 20th Av | remodel kitchen. replace cabinets, sink & floor tile.Details
remodel kitchen. replace cabinets, sink & floor tile. | $13,000 |
| Oct 23, 2017 | Completed final sign-off Aug 2018 | 3060 26th Av | replace total 12 windows 4 front windows in-kind with wood windows re-stucco front and side approx 400 sfDetails
replace total 12 windows 4 front windows in-kind with wood windows re-stucco front and side approx 400 sf | $25,000 |
| Oct 17, 2017 | Completed final sign-off Aug 2018 | 3060 26th Av | 2/f-remodel (e) kitchen, convert 1 (e) bath to 2 bathrooms, upgrade partial ceiling framing, re-built (e) interior staircase down to g/f. g/f-construct 2 bedrooms, family room, laundry room, 2 full bathrooms & 1/2 bathroom. new deck at rear (approx. 22'x8'), remove/replace partial foundationDetails
2/f-remodel (e) kitchen, convert 1 (e) bath to 2 bathrooms, upgrade partial ceiling framing, re-built (e) interior staircase down to g/f. g/f-construct 2 bedrooms, family room, laundry room, 2 full bathrooms & 1/2 bathroom. new deck at rear (approx. 22'x8'), remove/replace partial foundation | $125,000 |
| Sep 20, 2017 | Expired or cancelled expired Feb 2023 | 1315 Monterey Bl | 1st fl - add powder rm & convert office to media. add patio deck at 1st fl and cantilevered blacony at 3rd fl; remove (e) 3rd fl window bay at rear, add roof deck above. replace front facade picture window, door and garage door. excavate at 1st fl to extend new interior stair. interior reno to incluDetails
1st fl - add powder rm & convert office to media. add patio deck at 1st fl and cantilevered blacony at 3rd fl; remove (e) 3rd fl window bay at rear, add roof deck above. replace front facade picture window, door and garage door. excavate at 1st fl to extend new interior stair. interior reno to inclu | $350,000 |