Back to kitchen remodel contractors
Patrick Coakley Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2007 to Jul 2024
- Last 24 months
- 0 permits filed
86 permits since 2000: 79 completed, 7 never finaled.
Of the 7 never-finaled permits, 4 are 5 to 10 years old, 3 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
21 kitchen remodel permits: 21 completed. Typically 0 days from filing to permit and 141 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 28, 2022 | Completed final sign-off Apr 2023 | 8 Whitney St | remodel kitchen and bathroom inkind.Details
remodel kitchen and bathroom inkind. | $49,200 |
| Nov 22, 2022 | Completed final sign-off Apr 2023 | 2182 31st Av | one kitchen and one bathroom remodel, remove cabinets, etc and replace in kindDetails
one kitchen and one bathroom remodel, remove cabinets, etc and replace in kind | $42,500 |
| Oct 12, 2021 | Completed final sign-off Feb 2022 | 1465 Waller St | remodel one kitchen and one bathroom replace all in kind. no structural.Details
remodel one kitchen and one bathroom replace all in kind. no structural. | $39,500 |
| Oct 12, 2021 | Completed final sign-off Mar 2022 | 11 Miramar Av | remodel one kitchen and one bathroom replace all in kind. no structural.Details
remodel one kitchen and one bathroom replace all in kind. no structural. | $40,300 |
| Jun 8, 2021 | Completed final sign-off Dec 2021 | 578 26th Av | unit 12: remodel and replace 1 kitchen and 1 bath in kind.Details
unit 12: remodel and replace 1 kitchen and 1 bath in kind. | $46,200 |
| Apr 21, 2021 | Completed final sign-off Sep 2021 | 16 Whitney St | remodel a kitchen, remodel a bathroom at 2nd floor. like for like no walls to be move.Details
remodel a kitchen, remodel a bathroom at 2nd floor. like for like no walls to be move. | $49,500 |
| Apr 9, 2021 | Completed final sign-off Jan 2022 | 1363 Hudson Av | basement: convert e bsmnt area into an ent. rm; add a new full bathrm, move laundry rm & move util rm to bsmnt; connect bsmnt w/new stairs to 1/f. 1/f: remove e bearing wall to open the liv rm/din rm/kitc areas; remodel the kitchen; convert e bathrm into a powder rm; extend e deck over e garage roofDetails
basement: convert e bsmnt area into an ent. rm; add a new full bathrm, move laundry rm & move util rm to bsmnt; connect bsmnt w/new stairs to 1/f. 1/f: remove e bearing wall to open the liv rm/din rm/kitc areas; remodel the kitchen; convert e bathrm into a powder rm; extend e deck over e garage roof | $165,000 |
| Mar 5, 2021 | Completed final sign-off Aug 2021 | 6124 Fulton St | remodel bathroom & kitchen in units 6124 & 6126. remodel of 230 sf of existing livable spce in the ground floor w/a bathroom. remodel in-kind. no layout changeDetails
remodel bathroom & kitchen in units 6124 & 6126. remodel of 230 sf of existing livable spce in the ground floor w/a bathroom. remodel in-kind. no layout change | $87,780 |
| Nov 30, 2020 | Completed final sign-off May 2021 | 154 Park St | convert (e) one bedroom one bathroom ground floor unit into a two bedroom two bath dwelling unit. convert (e) living room into a master bedroom. convert (e) dining room into master bathroom. convert (e) bathroom into a bedroom. convert (e) bedroom into open living/dining/kitchen areaDetails
convert (e) one bedroom one bathroom ground floor unit into a two bedroom two bath dwelling unit. convert (e) living room into a master bedroom. convert (e) dining room into master bathroom. convert (e) bathroom into a bedroom. convert (e) bedroom into open living/dining/kitchen area | $85,000 |
| Oct 22, 2019 | Completed final sign-off Feb 2021 | 12 Whitney St | unit #12 remodel:replace (e) foundations & new slab to convert (e) unconditioned space into habitable @ 1st fl& convert (e) 2nd fl unit withnew stair;add 2 bedrooms & 2 bathrooms & laundry hook ups @ 1st fl; widen & 1 hr rate (e) passage.(n) fau & tankless water hetaer; 2nd fl - remodel kitchen.Details
unit #12 remodel:replace (e) foundations & new slab to convert (e) unconditioned space into habitable @ 1st fl& convert (e) 2nd fl unit withnew stair;add 2 bedrooms & 2 bathrooms & laundry hook ups @ 1st fl; widen & 1 hr rate (e) passage.(n) fau & tankless water hetaer; 2nd fl - remodel kitchen. | $500,000 |
| Jul 10, 2019 | Completed final sign-off Oct 2019 | 641 08th Av | demo (e) kitchen, remodel kitchen, demo 1 bathroom, remodel 1 bathroom. kitchen 110 sq ft, bathroom 65 sq ftDetails
demo (e) kitchen, remodel kitchen, demo 1 bathroom, remodel 1 bathroom. kitchen 110 sq ft, bathroom 65 sq ft | $42,000 |
| Jun 7, 2019 | Completed final sign-off Nov 2019 | 825 Silliman St | remodel bottom of stairs; change direction of turn. convert e bedrm into family/e family rm into bedrm2. convert playrm into office/study. replace e kitchen cabinets, appliances & plumbing fixtures. convert e bath & closet into master bath & master closet. remodel bathrm. add wall closet @bedrm2.Details
remodel bottom of stairs; change direction of turn. convert e bedrm into family/e family rm into bedrm2. convert playrm into office/study. replace e kitchen cabinets, appliances & plumbing fixtures. convert e bath & closet into master bath & master closet. remodel bathrm. add wall closet @bedrm2. | $58,000 |
| Apr 5, 2019 | Completed final sign-off Sep 2019 | 2086 23rd Av | remodel the kitchen, remove and replace kitchen cabinets and counters. remodel 2 existing bathrooms on main level. no changes on walls.Details
remodel the kitchen, remove and replace kitchen cabinets and counters. remodel 2 existing bathrooms on main level. no changes on walls. | $68,500 |
| Oct 28, 2014 | Completed final sign-off Apr 2015 | 124 Inverness Dr | remodel 1 kitchen, remodel 2 bathrooms, take existing lath and plaster off bedrooms and sheetrock after electrical is done.Details
remodel 1 kitchen, remodel 2 bathrooms, take existing lath and plaster off bedrooms and sheetrock after electrical is done. | $112,750 |
| Jun 16, 2014 | Completed final sign-off Aug 2014 | 2844 Greenwich St | kitchen remodelDetails
kitchen remodel | $27,500 |
| Mar 27, 2014 | Completed final sign-off Jul 2014 | 2055 18th Av | ref pa# 201308134140. on the ground level remodel existing bathroom on the upper floor. remodel kitchen and one bathroom. no change in layout & openings. bathroom lighting shall be high efficacy or controlled by manuel on sensor. kitchen lighting min 50% wattage high efficacy.Details
ref pa# 201308134140. on the ground level remodel existing bathroom on the upper floor. remodel kitchen and one bathroom. no change in layout & openings. bathroom lighting shall be high efficacy or controlled by manuel on sensor. kitchen lighting min 50% wattage high efficacy. | $38,000 |
| Jul 15, 2013 | Completed final sign-off Oct 2015 | 44 Avila St | add 3rd stories (mas. bed room, family rm) renovate kitchen, add stair to grade level, family rm bath at grade level. entire building to be sprinklered nffa13r.Details
add 3rd stories (mas. bed room, family rm) renovate kitchen, add stair to grade level, family rm bath at grade level. entire building to be sprinklered nffa13r. | $200,000 |
| Nov 8, 2010 | Completed final sign-off Feb 2011 | 793 36th Av | remove and replace existing kitchen cabinets & counter tops. strip walls in kitchen area (sheathing only). no wall relocation. min 50% of kitchen light watts to be high efficacy lightsDetails
remove and replace existing kitchen cabinets & counter tops. strip walls in kitchen area (sheathing only). no wall relocation. min 50% of kitchen light watts to be high efficacy lights | $25,500 |
| May 27, 2010 | Completed final sign-off Oct 2010 | 2917 24th Av | kitchen remodel. demo extg kitchen. replace new cabinets and counters. re use extg appliance,new lighting area aprox. 12'x10'Details
kitchen remodel. demo extg kitchen. replace new cabinets and counters. re use extg appliance,new lighting area aprox. 12'x10' | $25,000 |
| Nov 10, 2009 | Completed final sign-off Mar 2010 | 1748 Filbert St | partial remodel of 2 kitchens and 2 bathrooms. dry rot, on exterior stairs less than 50%. no move or add walls. kitchen min 50% watt be he. bath h.e. lights or o.s. (manual on).Details
partial remodel of 2 kitchens and 2 bathrooms. dry rot, on exterior stairs less than 50%. no move or add walls. kitchen min 50% watt be he. bath h.e. lights or o.s. (manual on). | $31,500 |
| Apr 2, 2007 | Completed final sign-off Aug 2007 | 2435 25th Av | kitchen and bath remodel, existing, no change to partitions. replace 7 windows, not visible from the street, same size and locationDetails
kitchen and bath remodel, existing, no change to partitions. replace 7 windows, not visible from the street, same size and location | $25,500 |