Block 0520, lot 010
1748 Filbert St
- City’s use
- Multi-Family Residential
- Built
- 1908
- Stories
- 3
- Units
- 4
- Rooms
- 5 bathrooms
- Building
- 5,640 sq ft
- Lot
- 4,125 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 22, 2026 | Completed final sign-off Oct 2026 | 1748 Filbert St | to obtain final inspection for work approved under pa# 2018 1119 6233. all work is complete.Details
to obtain final inspection for work approved under pa# 2018 1119 6233. all work is complete. | ||
| Oct 16, 2026 | Completed final sign-off Oct 2026 | 1750 Filbert St | to obtain final inspection for work approved under pa# 2018 1009 2683. all work is complete.Details
to obtain final inspection for work approved under pa# 2018 1009 2683. all work is complete. | ||
| Feb 20, 2020 | Completed final sign-off Apr 2020 | 1748 Filbert St | All Star Fire Protection Llc | as built per app#201910235377 and ref. adu app#201810092683Details
as built per app#201910235377 and ref. adu app#201810092683 | |
| Oct 23, 2019 | Completed final sign-off Mar 2020 | 1748 Filbert St | All Star Fire Protection Llc | new residential fire sprinkler system to adu additionDetails
new residential fire sprinkler system to adu addition | $7,500 |
| Dec 19, 2018 | Never finaled issued Dec 2018, no final | 1748 Filbert St | street space only | ||
| Nov 19, 2018 | Never finaled issued Nov 2018, no final | 1748 Filbert St | S F Bay Construction Inc | foundation repair | $15,000 |
| Oct 9, 2018 | Expired or cancelled expired Oct 2026 | 1750 Filbert St | S F Bay Construction Inc | rear building adu per ordiance 162-16. infill (e) 1st fl or (e) 2 unit flat. unit 1 bed and 1 bath, structural work. new electrical, plumbing and mechanical. 812 sf of unit and 168 sf mech,circulation and storageDetails
rear building adu per ordiance 162-16. infill (e) 1st fl or (e) 2 unit flat. unit 1 bed and 1 bath, structural work. new electrical, plumbing and mechanical. 812 sf of unit and 168 sf mech,circulation and storage | $120,000 |
| May 25, 2017 | Completed final sign-off Aug 2017 | 1748 Filbert St | Mc Elligott Construction Inc | replace some existing posts and treads of back stairs, less than 50%Details
replace some existing posts and treads of back stairs, less than 50% | $8,500 |
| Nov 10, 2009 | Completed final sign-off Mar 2010 | 1748 Filbert St | Patrick Coakley Construction | partial remodel of 2 kitchens and 2 bathrooms. dry rot, on exterior stairs less than 50%. no move or add walls. kitchen min 50% watt be he. bath h.e. lights or o.s. (manual on).Details
partial remodel of 2 kitchens and 2 bathrooms. dry rot, on exterior stairs less than 50%. no move or add walls. kitchen min 50% watt be he. bath h.e. lights or o.s. (manual on). | $31,500 |
| Oct 30, 2009 | Completed final sign-off Mar 2010 | 1750 Filbert St | Tony Ng Plumbing Co | install 5 sprinkler heads in ground floor hallway and connect to city main water line.Details
install 5 sprinkler heads in ground floor hallway and connect to city main water line. | $1,500 |
| Sep 29, 2009 | Completed final sign-off Mar 2010 | 1750 Filbert St | revision to appl #200612119560 - delete hardwritten note " provide fire sprinklers...separated permit" on a-1, provide a one hour rated construction & fire sprinklers for hallway on east side of ground floor as shown on a-2 of approved plan per dbi determination.Details
revision to appl #200612119560 - delete hardwritten note " provide fire sprinklers...separated permit" on a-1, provide a one hour rated construction & fire sprinklers for hallway on east side of ground floor as shown on a-2 of approved plan per dbi determination. | ||
| Sep 24, 2009 | Completed final sign-off Mar 2010 | 1750 Filbert St | Patrick Coakley Construction | modify a portion of the roof into roof deck. total 245 sq. ft. add spriral stair from 3rd. floor to roof w/ enclosure. (revision to approved building permit application #2006/1211/9560.Details
modify a portion of the roof into roof deck. total 245 sq. ft. add spriral stair from 3rd. floor to roof w/ enclosure. (revision to approved building permit application #2006/1211/9560. | $10,000 |
| Dec 11, 2006 | Completed final sign-off Mar 2010 | 1750 Filbert St | front bldg (to erect 3 story single family dwelling)Details
front bldg (to erect 3 story single family dwelling) | $410,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- All Star Fire Protection Llc (2), Patrick Coakley Construction (2), S F Bay Construction Inc (2), Mc Elligott Construction Inc, Tony Ng Plumbing Co
- Architects
- Gabriel Y. Ng (2), Jeremiah Schaub
- Engineers
- William Wong
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.