Patrick Coakley Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2007 to Jul 2024
- Last 24 months
- 0 permits filed
86 permits since 2000: 79 completed, 7 never finaled.
Of the 7 never-finaled permits, 4 are 5 to 10 years old, 3 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
14 stairs permits: 13 completed, 1 never finaled. Typically 14 days from filing to permit and 230 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 1, 2024 | Completed final sign-off May 2025 | 126 Dorchester Wy | convert undeveloped ground floor storage into habitable space. build new bedroom, bathroom, gym, laundry, powder rm, & storage. remodel rear open area into family room. replace extg int. stairs with nw stairs. install nw furnace & tankless w.h. build nw foundation slab & wall framing as required.Details
convert undeveloped ground floor storage into habitable space. build new bedroom, bathroom, gym, laundry, powder rm, & storage. remodel rear open area into family room. replace extg int. stairs with nw stairs. install nw furnace & tankless w.h. build nw foundation slab & wall framing as required. | $248,000 |
| Nov 1, 2021 | Completed final sign-off Nov 2023 | 1966 36th Av | add a new adu on g/f. build a horizontal addition to the rear of the g/f for the adu. - eliminate the existing interior stairs and remodel the existing bathroom and add a new laundry room at 2/f. eg-02 applied.Details
add a new adu on g/f. build a horizontal addition to the rear of the g/f for the adu. - eliminate the existing interior stairs and remodel the existing bathroom and add a new laundry room at 2/f. eg-02 applied. | $85,000 |
| Apr 9, 2021 | Completed final sign-off Jan 2022 | 1363 Hudson Av | basement: convert e bsmnt area into an ent. rm; add a new full bathrm, move laundry rm & move util rm to bsmnt; connect bsmnt w/new stairs to 1/f. 1/f: remove e bearing wall to open the liv rm/din rm/kitc areas; remodel the kitchen; convert e bathrm into a powder rm; extend e deck over e garage roofDetails
basement: convert e bsmnt area into an ent. rm; add a new full bathrm, move laundry rm & move util rm to bsmnt; connect bsmnt w/new stairs to 1/f. 1/f: remove e bearing wall to open the liv rm/din rm/kitc areas; remodel the kitchen; convert e bathrm into a powder rm; extend e deck over e garage roof | $165,000 |
| Dec 9, 2020 | Completed final sign-off Sep 2021 | 1457 10th Av | basmnt-reduce (e) garage to 1-car space; add (n) bedrm w/ closet to (n) condition spc. relocate bath & ldry. move utlty area. replace furnace & wh. repair (e) ext stair at rear. grndflr-remove some int walls. remodel (e) powdr rm, kitch. replace 3 windows at rear. 2ndflr-convert mast bed to 2 bedrmDetails
basmnt-reduce (e) garage to 1-car space; add (n) bedrm w/ closet to (n) condition spc. relocate bath & ldry. move utlty area. replace furnace & wh. repair (e) ext stair at rear. grndflr-remove some int walls. remodel (e) powdr rm, kitch. replace 3 windows at rear. 2ndflr-convert mast bed to 2 bedrm | $280,000 |
| Oct 22, 2019 | Completed final sign-off Feb 2021 | 12 Whitney St | unit #12 remodel:replace (e) foundations & new slab to convert (e) unconditioned space into habitable @ 1st fl& convert (e) 2nd fl unit withnew stair;add 2 bedrooms & 2 bathrooms & laundry hook ups @ 1st fl; widen & 1 hr rate (e) passage.(n) fau & tankless water hetaer; 2nd fl - remodel kitchen.Details
unit #12 remodel:replace (e) foundations & new slab to convert (e) unconditioned space into habitable @ 1st fl& convert (e) 2nd fl unit withnew stair;add 2 bedrooms & 2 bathrooms & laundry hook ups @ 1st fl; widen & 1 hr rate (e) passage.(n) fau & tankless water hetaer; 2nd fl - remodel kitchen. | $500,000 |
| Jun 7, 2019 | Completed final sign-off Nov 2019 | 825 Silliman St | remodel bottom of stairs; change direction of turn. convert e bedrm into family/e family rm into bedrm2. convert playrm into office/study. replace e kitchen cabinets, appliances & plumbing fixtures. convert e bath & closet into master bath & master closet. remodel bathrm. add wall closet @bedrm2.Details
remodel bottom of stairs; change direction of turn. convert e bedrm into family/e family rm into bedrm2. convert playrm into office/study. replace e kitchen cabinets, appliances & plumbing fixtures. convert e bath & closet into master bath & master closet. remodel bathrm. add wall closet @bedrm2. | $58,000 |
| Sep 25, 2015 | Completed final sign-off Sep 2016 | 245 Pixley St | revise pa 201404304546: add new roof hatch and roof deck redwood picket handrail, new interior stair to roof hatch that leads to new roof deck and other structural revision.Details
revise pa 201404304546: add new roof hatch and roof deck redwood picket handrail, new interior stair to roof hatch that leads to new roof deck and other structural revision. | $40,000 |
| Apr 20, 2015 | Never finaled issued Apr 2015, no final | 44 Avila St | remove and replace front exterior brick stairs in kind due to dryrot. water proof the new members and install new brick to match existing.Details
remove and replace front exterior brick stairs in kind due to dryrot. water proof the new members and install new brick to match existing. | $9,900 |
| Nov 21, 2014 | Completed final sign-off Apr 2016 | 2270 29th Av | add full bathroom, bedroom and home office at 1st floor. remodel stair 1st to 2nd floor. replace gyp bd. upgrade mech, electrical plumbing on seperate permit. all work interior. not visible from street.Details
add full bathroom, bedroom and home office at 1st floor. remodel stair 1st to 2nd floor. replace gyp bd. upgrade mech, electrical plumbing on seperate permit. all work interior. not visible from street. | $75,000 |
| Nov 7, 2014 | Completed final sign-off Nov 2014 | 350 Douglass St | replace front stairs in kind and repair front stair landing framing.Details
replace front stairs in kind and repair front stair landing framing. | $6,500 |
| Jul 15, 2013 | Completed final sign-off Oct 2015 | 44 Avila St | add 3rd stories (mas. bed room, family rm) renovate kitchen, add stair to grade level, family rm bath at grade level. entire building to be sprinklered nffa13r.Details
add 3rd stories (mas. bed room, family rm) renovate kitchen, add stair to grade level, family rm bath at grade level. entire building to be sprinklered nffa13r. | $200,000 |
| Nov 10, 2009 | Completed final sign-off Mar 2010 | 1748 Filbert St | partial remodel of 2 kitchens and 2 bathrooms. dry rot, on exterior stairs less than 50%. no move or add walls. kitchen min 50% watt be he. bath h.e. lights or o.s. (manual on).Details
partial remodel of 2 kitchens and 2 bathrooms. dry rot, on exterior stairs less than 50%. no move or add walls. kitchen min 50% watt be he. bath h.e. lights or o.s. (manual on). | $31,500 |
| Sep 24, 2009 | Completed final sign-off Mar 2010 | 1750 Filbert St | modify a portion of the roof into roof deck. total 245 sq. ft. add spriral stair from 3rd. floor to roof w/ enclosure. (revision to approved building permit application #2006/1211/9560.Details
modify a portion of the roof into roof deck. total 245 sq. ft. add spriral stair from 3rd. floor to roof w/ enclosure. (revision to approved building permit application #2006/1211/9560. | $10,000 |
| Nov 14, 2008 | Completed final sign-off Jan 2009 | 58 El Sereno Ct | repair some dry rot on exterior stairs wall, also remove & replace some siding in the front of the house.Details
repair some dry rot on exterior stairs wall, also remove & replace some siding in the front of the house. | $3,000 |