Patrick Coakley Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2007 to Jul 2024
- Last 24 months
- 0 permits filed
86 permits since 2000: 79 completed, 7 never finaled.
Of the 7 never-finaled permits, 4 are 5 to 10 years old, 3 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 4 completed. Typically 106 days from filing to permit and 249 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 13, 2021 | Completed final sign-off Jul 2024 | 2275 40th Av | horizontal extension to rear of (e) ground floor and 2nd floor. includs interior remodeling to both (e) floors. build a (n) deck at rear of 2nd floor. excavate 14 cu.yds.Details
horizontal extension to rear of (e) ground floor and 2nd floor. includs interior remodeling to both (e) floors. build a (n) deck at rear of 2nd floor. excavate 14 cu.yds. | $365,000 |
| Apr 9, 2021 | Completed final sign-off Jan 2022 | 1363 Hudson Av | basement: convert e bsmnt area into an ent. rm; add a new full bathrm, move laundry rm & move util rm to bsmnt; connect bsmnt w/new stairs to 1/f. 1/f: remove e bearing wall to open the liv rm/din rm/kitc areas; remodel the kitchen; convert e bathrm into a powder rm; extend e deck over e garage roofDetails
basement: convert e bsmnt area into an ent. rm; add a new full bathrm, move laundry rm & move util rm to bsmnt; connect bsmnt w/new stairs to 1/f. 1/f: remove e bearing wall to open the liv rm/din rm/kitc areas; remodel the kitchen; convert e bathrm into a powder rm; extend e deck over e garage roof | $165,000 |
| Sep 7, 2011 | Completed final sign-off Jun 2012 | 2 Ashbury Tr | revise approved building permit app# 2011-0615-8173 replace existing foundation new 3rd floor deck of existing roof. delete special inspection #18 "bolts installed in existing concrete."Details
revise approved building permit app# 2011-0615-8173 replace existing foundation new 3rd floor deck of existing roof. delete special inspection #18 "bolts installed in existing concrete." | $30,000 |
| Nov 5, 2010 | Completed final sign-off Aug 2011 | 58 El Sereno Ct | demo (e) window at living room, install new sliding glass door. construct new wood deck at 2nd floor.Details
demo (e) window at living room, install new sliding glass door. construct new wood deck at 2nd floor. | $10,000 |