Back to bathroom remodel contractors
Patrick Coakley Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2007 to Jul 2024
- Last 24 months
- 0 permits filed
86 permits since 2000: 79 completed, 2 in progress, 5 never finaled.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
Bathroom remodel permits
35 bathroom remodel permits: 34 completed, 1 in progress. Typically 2 days from filing to permit and 153 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 1, 2024 | Completed | 126 Dorchester Wy | convert undeveloped ground floor storage into habitable space. build new bedroom, bathroom, gym, laundry, powder rm, & storage. remodel rear open area into family room. replace extg int. stairs with nw stairs. install nw furnace & tankless w.h. build nw foundation slab & wall framing as required. | $248,000 |
| Jan 24, 2024 | Completed | 1977 16th Av | non-structural interior renovation of (e) bathroom and master closet on 2nd fl. no exterior work to be performed. in kind remodel | $12,000 |
| Jul 25, 2023 | Completed | 528 Noriega St | remodel 2 bathrooms and replace in kind. replace vanity, toilet, tub, shower, tiles. | $65,500 |
| Nov 28, 2022 | Completed | 8 Whitney St | remodel kitchen and bathroom inkind. | $49,200 |
| Nov 22, 2022 | Completed | 2182 31st Av | one kitchen and one bathroom remodel, remove cabinets, etc and replace in kind | $42,500 |
| Dec 7, 2021 | Completed | 454 Waller St | revise pa 202101062181 - revise location of bathroom #2 at 1st fl & structural framing revision. per customer, building not sprinklered. | |
| Nov 1, 2021 | Completed | 1966 36th Av | add a new adu on g/f. build a horizontal addition to the rear of the g/f for the adu. - eliminate the existing interior stairs and remodel the existing bathroom and add a new laundry room at 2/f. eg-02 applied. | $85,000 |
| Oct 12, 2021 | Completed | 11 Miramar Av | remodel one kitchen and one bathroom replace all in kind. no structural. | $40,300 |
| Oct 12, 2021 | Completed | 1465 Waller St | remodel one kitchen and one bathroom replace all in kind. no structural. | $39,500 |
| Jun 17, 2021 | Completed | 20 Burnside Av | replacing new toilet & vanity as well as new tile. 1/2 bath remodel. | $1,930 |
| Jun 8, 2021 | Completed | 578 26th Av | unit 12: remodel and replace 1 kitchen and 1 bath in kind. | $46,200 |
| Jun 2, 2021 | Completed | 641 Chenery St | 2nd fl remodel e kitchhen area and replace cabinets, reduce e living rm and create new bedroom. remodel e bath. build new bath. 1st fl no new work. | $45,000 |
| Apr 21, 2021 | Completed | 16 Whitney St | remodel a kitchen, remodel a bathroom at 2nd floor. like for like no walls to be move. | $49,500 |
| Mar 5, 2021 | Completed | 6124 Fulton St | remodel bathroom & kitchen in units 6124 & 6126. remodel of 230 sf of existing livable spce in the ground floor w/a bathroom. remodel in-kind. no layout change | $87,780 |
| Dec 9, 2020 | Completed | 1457 10th Av | basmnt-reduce (e) garage to 1-car space; add (n) bedrm w/ closet to (n) condition spc. relocate bath & ldry. move utlty area. replace furnace & wh. repair (e) ext stair at rear. grndflr-remove some int walls. remodel (e) powdr rm, kitch. replace 3 windows at rear. 2ndflr-convert mast bed to 2 bedrm | $280,000 |
| Nov 30, 2020 | Completed | 528 Noriega St | remodel (e) master bedroom suite; englard and remodel master bathroom; build new master walk-in closet. | $35,000 |
| Nov 30, 2020 | Completed | 154 Park St | convert (e) one bedroom one bathroom ground floor unit into a two bedroom two bath dwelling unit. convert (e) living room into a master bedroom. convert (e) dining room into master bathroom. convert (e) bathroom into a bedroom. convert (e) bedroom into open living/dining/kitchen area | $85,000 |
| Nov 5, 2019 | Completed | 440 Urbano Dr | lower level improvements: legalize (e) media room, reduce (e) garage/laundry area into (n) conditioned area and convert into (n) bedroom and family room, add new bathroom and new powder room, relocate laundry, add new windows & door at new bedroom, family room and laundry room | $45,000 |
| Oct 22, 2019 | Completed | 12 Whitney St | unit #12 remodel:replace (e) foundations & new slab to convert (e) unconditioned space into habitable @ 1st fl& convert (e) 2nd fl unit withnew stair;add 2 bedrooms & 2 bathrooms & laundry hook ups @ 1st fl; widen & 1 hr rate (e) passage.(n) fau & tankless water hetaer; 2nd fl - remodel kitchen. | $500,000 |
| Aug 22, 2019 | Completed | 825 Silliman St | relocate new bathroom. reduce garage/storage into habitable space. create new office/study. replace furnace and water heater. replace two rear bedrooms windows at 2nd fl. | $30,000 |
| Jul 10, 2019 | Completed | 641 08th Av | demo (e) kitchen, remodel kitchen, demo 1 bathroom, remodel 1 bathroom. kitchen 110 sq ft, bathroom 65 sq ft | $42,000 |
| Jun 7, 2019 | Completed | 825 Silliman St | remodel bottom of stairs; change direction of turn. convert e bedrm into family/e family rm into bedrm2. convert playrm into office/study. replace e kitchen cabinets, appliances & plumbing fixtures. convert e bath & closet into master bath & master closet. remodel bathrm. add wall closet @bedrm2. | $58,000 |
| Apr 30, 2019 | In progress | 2270 29th Av | construct (n) 3rd fl level above (e) 2-story bldg. build extension to rear of (3) ground fl & 2nd fl levels. convert rear of ground fl into 2-bedrm/1-bath accessory dwelling unit. extend (e) 1-car garage into 2-car garage & 2-bicyle spaces. remodel (e) 2nd fl | $310,000 |
| Apr 5, 2019 | Completed | 2086 23rd Av | remodel the kitchen, remove and replace kitchen cabinets and counters. remodel 2 existing bathrooms on main level. no changes on walls. | $68,500 |
| Nov 21, 2014 | Completed | 2270 29th Av | add full bathroom, bedroom and home office at 1st floor. remodel stair 1st to 2nd floor. replace gyp bd. upgrade mech, electrical plumbing on seperate permit. all work interior. not visible from street. | $75,000 |
| Oct 28, 2014 | Completed | 124 Inverness Dr | remodel 1 kitchen, remodel 2 bathrooms, take existing lath and plaster off bedrooms and sheetrock after electrical is done. | $112,750 |
| Mar 27, 2014 | Completed | 2055 18th Av | ref pa# 201308134140. on the ground level remodel existing bathroom on the upper floor. remodel kitchen and one bathroom. no change in layout & openings. bathroom lighting shall be high efficacy or controlled by manuel on sensor. kitchen lighting min 50% wattage high efficacy. | $38,000 |
| Feb 5, 2014 | Completed | 2967 23rd Av | comply w/compliant #201449331 - addition of new family room & bathroom on lower level. | $40,000 |
| Jul 15, 2013 | Completed | 44 Avila St | add 3rd stories (mas. bed room, family rm) renovate kitchen, add stair to grade level, family rm bath at grade level. entire building to be sprinklered nffa13r. | $200,000 |
| Jun 7, 2013 | Completed | 2135 Greenwich St | interior renovation on 3 floors-add washer & dryer, utility sink. configure bathroom on 3rd floor, eliminate 2 sinks, 1 toilet. no structural work. no change to exterior envelope, no alterations to 2nd floor. no change to (e). | $125,000 |
| Jun 15, 2011 | Completed | 2 Ashbury Tr | interior remodel of existing single family dwelling. install new wood clad windows, restucco exterior. new basement storage and mech rooms with new retaining walls. foundation repaired or replaced as required. new skylights, 3 new baths, (1 at basement) | $450,000 |
| Nov 10, 2009 | Completed | 1748 Filbert St | partial remodel of 2 kitchens and 2 bathrooms. dry rot, on exterior stairs less than 50%. no move or add walls. kitchen min 50% watt be he. bath h.e. lights or o.s. (manual on). | $31,500 |
| Mar 10, 2009 | Completed | 521 Dewey Bl | remodel 2 existing bathrooms ground floor and second floor and 2 new shower pans. | $23,500 |
| Dec 3, 2007 | Completed | 858 34th Av | alteration & 3rd floor addition including 3 bedrooms, 2 bathrooms & laundry. | $100,000 |
| Apr 2, 2007 | Completed | 2435 25th Av | kitchen and bath remodel, existing, no change to partitions. replace 7 windows, not visible from the street, same size and location | $25,500 |