Back to kitchen remodel contractors
Sean M O'reilly
- Based in
- San Francisco
- On San Francisco permits
- Feb 2008 to Aug 2026
- Last 24 months
- 10 permits filed
56 permits since 2000: 52 completed, 4 in progress.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
Kitchen remodel permits
47 kitchen remodel permits: 45 completed, 2 in progress. Typically 0 days from filing to permit and 75 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 15, 2026 | Completed | 1445 Greenwich St | unit 207: bathroom and kitchen remodel like for like, new cabinets, counter tops, tiles, plumbing and electical updates as needed. | $30,000 |
| May 15, 2026 | In progress | 923 Eddy St | unit 102: bathroom and kitchen remodel like for like, new cabinets, counter tops, tiles, plumbing and electical updates as needed. | $30,000 |
| May 15, 2026 | In progress | 923 Eddy St | unit 304: bathroom and kitchen remodel like for like, new cabinets, counter tops, tiles, plumbing and electical updates as needed. | $30,000 |
| Jan 7, 2026 | Completed | 923 Eddy St | apt.#103: remodel kitchen- new cabinets and countertops. bathroom remodel-new tile and fixtures, no structural changes in unit. | $30,000 |
| Feb 5, 2025 | Completed | 923 Eddy St | unit# 204: remodel kitchen and bathroom in kind. new cabinets, countertops, tile fixtures - no structural changes. - electrical and plumbing to be pulled separately by subcontractors. no removall of walls | $35,000 |
| Oct 28, 2024 | Completed | 923 Eddy St | unit# 206: remodel kitchen and bathroom in kind. new cabinets, countertops, tile fixtures - no structural changes. electrical and plumbing to be pulled separately by subcontractors. no removall of walls | $30,000 |
| Jun 7, 2023 | Completed | 923 Eddy St | apt# 302: remodel one kitchen new cabinets countertops tile remodel one bathroom new shower tile fixtures no structural changes . electrician and plumber to obtain seperate permits. | $30,000 |
| Apr 24, 2023 | Completed | 629 Arguello Bl | apt#306: remodel one kitchen and one bathroom - replace kitchen cabinets and countertops. replace bathroom fixtures and tile - no structural changes. | $35,000 |
| Mar 29, 2023 | Completed | 1445 Greenwich St | unit 301: kitchen remodel- replace cabinets ad countertops. remodel 2 bathrooms- replace fixtures- new tile, plumber and electrician to obtain separate permits. no structural changes. | $30,000 |
| Jan 10, 2023 | Completed | 775 Post St | unit #102: remodel kitchen and one bathroom. replace cabinets and countertops - no structural changes. remodel bathroom, add shower, and washer/dryer to unit. plumber and electrician to obtain separate permits. | $40,000 |
| Aug 19, 2022 | Completed | 775 Post St | unit #511: remodel kitchen. replace cabinets and countertops. no structural changes. electrician and plumber to obtain separate permits. | $20,000 |
| Jul 11, 2022 | Completed | 1445 Greenwich St | apt 106: remodel 1 kitchen, rpelace cabinets and countertops. remodel bathroom: new fixtures . no structural changes. electrical and plumbing permits sep by others. | $20,000 |
| May 17, 2022 | Completed | 775 Post St | unit 301: remodel one kitchen. replace cabinets and countertops. no structural changes. electrician and plumber to obtain seperate permits | $20,000 |
| Apr 26, 2022 | Completed | 775 Post St | unit 104: remodel (1) kitchen, replace cabinets, countertops, no structural changes. plumber and electrician to obtain seperate permits. | $20,000 |
| Apr 15, 2022 | Completed | 775 Post St | ste 505: remodel one kitchen, replace cabinets, counter tops, no structural changes. electrican and plumber to obtain sep permit. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0(k)3. | $20,000 |
| Sep 24, 2021 | Completed | 775 Post St | #604: remodel one kitchen: replace cabinets, countertops. no structural changes. new electrical/plumbing upgrades. electgrician and plumber to obtain seperate permit. lights per cenc 150.0 (k) | $10,000 |
| Dec 23, 2020 | Completed | 49 Broderick St | unit #16: remodel kitchen & bathroom. no structural changes. new electrical & plumbing to be obtained by electrician & plumber. | $45,000 |
| Oct 16, 2019 | Completed | 775 Post St | unit 208. remodel kitchen as is, no structural changes. partial remodel of bathroom -new shower valve, wall tile, vanity, toilet | $35,000 |
| Jun 28, 2018 | Completed | 775 Post St | unit 310. non-structural interior remodel. relocate kitchen, remodel (e) bathroom, provide (add) (n) bathroom, provide (add) add (n) bedroom | $45,000 |
| Jan 8, 2018 | Completed | 775 Post St | unit#205 remodel kitchen & bathroom. new electrical. new drywall throughout in same location. n/a for maher. | $30,000 |
| Jan 8, 2018 | Completed | 775 Post St | unit#305 remodel kitchen. upgrade electrical. in same location. n/a for maher. | $20,000 |
| Jan 8, 2018 | Completed | 775 Post St | unit#101 remodel kitchen. upgrade electrical. in same location. n/a for maher. | $20,000 |
| Mar 31, 2017 | Completed | 2201 California St | apt #1: revision to 201703151567 - replace support beam in kitchen | $3,000 |
| Mar 15, 2017 | Completed | 2201 California St | unit #1 - kitchen & bathroom remodel, new electrical/plumbing. all in-kind remodel. | $30,000 |
| Jul 22, 2016 | Completed | 775 Post St | #501 interior remodel - relocate kitchen. remodel (e) bath. provide new bedroom and bathroom. maher na add new bathroom | $50,000 |
| Apr 11, 2016 | Completed | 1007 Haight St | kitchen & bathroom remodel at unit #7. no new wall & no existing wall relocation. no structural work. lighting shall comply with cec 150.0(k)3 & 5 resp. all new sheetrock shall be min. 5/8" type x. plumber & electrican to obtain their respective permits. | $30,000 |
| Apr 11, 2016 | Completed | 775 Post St | work in unit #203: replace 50% of kitchen cabinet, bathroom vanity, install exhaust fan, new countertop, sink. no new wall & no existing wall relocation. no structural work. lighting shall comply with cec 150.0(k)3 & 5. new electrical & upgrade plumbing. new sheetrock shall be min. 5/8" type x. | $20,000 |
| Feb 2, 2016 | Completed | 929 Pine St | remodel kitchen , new cabinets counters, replace bathroom vaity new electrical, electrician to obtain permit, plumber to obtain plumbing permit. work in unit # 202 | $25,000 |
| Dec 18, 2015 | Completed | 977 Pine St | unit#307. remodel kitchenette, bathroom, relocate electrical panel from closet. electrician & plumber to obtain separate permits. no structural changes to unit. n/a for maher. | $20,000 |
| Jun 29, 2015 | Completed | 775 Post St | unit 309: remodel kitchen - new cabinets, countertops, no structural changes. new electrical & plumbing upgrades. plumber & electrician to obtain separate permits. new toilet, vanity, bathroom fan, no walls to be moved or added. compliance with maher ordinance no 155-13 not required. | $25,000 |
| Mar 2, 2015 | Completed | 1007 Haight St | unit #4: remodel kitchen and bathroom. remove non structural partition wall separating bathroom. new electrical and plumbing plumber and electrician to obtain permits. | $25,000 |
| Oct 25, 2013 | Completed | 775 Post St | to comply with complaint #199817036, apt# 609 replace portion of kitchen cabinets countertops, sink ,hood ,appliances, tile in bathroom,vanity, lights outlets switches, throughout upgrade electrical & plumbing seperate permits to be obtained ,no structural chages . | $12,000 |
| Feb 6, 2013 | Completed | 415 Buchanan St | #b-1 -remodel one kitchen,one bathroom, new elect,plbg, demo lathe & plaster in kitchen, bath, hallway, new drywall shall be 5/8" type x gypsum board,new gas valve kitchen & bathroom cabinets, sinks, countertops (no dish washer or disposer) no structural changes, separate plbg,elec permit. | $20,000 |
| Jan 22, 2013 | Completed | 979 Sutter St | #101- remove drywall kitchen & living room, replace kitchen cabinets, appliances to comply nov #201030629 | $2,000 |
| Nov 30, 2012 | Completed | 101 Point Lobos Av | work in unit 103: remodel kitchen - new cabinets, counters, appliances, add dishwasher, micorwave - no strucutral changes. electrical & plumbing permits to be obtained. new electrical, shower valve, anglestops throughout, gas valve. | $15,000 |
| Sep 19, 2012 | Completed | 101 Point Lobos Av | work for apts # 207 & 308- remodel kitchen new cabinets, counters. appliances ,add dishwasher,microwave.change anglestop in kitcen & bathroom replace &reroute gas valve for stove, new shower valve in ap#308, new faucets in bathroom, new electrical throughout . | $24,000 |
| Aug 24, 2012 | Completed | 101 Point Lobos Av | remodel kitchen apartment #208 - new cabinets, counter tops, appliances, add dishwasher - no structural changes. change gas valve, change angle stops throughout, new electrical - separate plumbing & electrical permits. no changes on walls. | $15,000 |
| Aug 24, 2012 | Completed | 101 Point Lobos Av | remodel kitchen apartment #205 - new cabinets, counter tops, appliances, add dishwasher - no structural changes. change gas valve, change angle stops throughout, new electrical - separate plumbing & electrical permits. no changes on walls. | $15,000 |
| Jul 17, 2012 | Completed | 101 Point Lobos Av | unit #304. remodel kitchen - new cabinets/appiances, add dishwasher, new electrical. | $12,000 |
| May 24, 2012 | Completed | 101 Point Lobos Av | units# 202, 203, 206: replace cabinets, countertops, appliances in kitchen, add dishwashers, repair tile in bathroom, replace some vanities, no structural changes in units, seperate plumbing & electrical permits. | $30,000 |
| May 24, 2012 | Completed | 101 Point Lobos Av | units# 101, 104, 106: #101- install compact kitchen unit, #104, 106- replace cabinets, countertops, appliances in kitchen, add dishwashers, repair tile in bathroom, replace vanities, no structural changes, seperate plumbing & electrical permits. | $30,000 |
| May 9, 2012 | Completed | 101 Point Lobos Av | #403, 404, 406- replace kitchen cabinets, countertops, appliances, replace bathroom vanities, repair tile, no structural changes. | $24,000 |
| Jul 5, 2011 | Completed | 1200 Gough St | replace (e) dishwasher, cooktop, microwave, light fixtures, outlets, switches, bathroom & kitchen sinks, faucets, disposal, countertops. no structural changes, no walls opened, no cabinets. | $10,000 |
| Dec 7, 2010 | Completed | 1200 Gough St | replace (e) kitchen countertops, sink, disposer, cooktop, wall oven, microwave, toilet, vanity top, switches, outlets, light fixtures. no structural changes. | $10,000 |
| Dec 8, 2009 | Completed | 1200 Gough St | unit #8a-kitchen: repl sink, faucet, dishwasher, electric cook top, electric wall oven, gfci switches, outlets, light fixtures. bathrms: repl sink, faucets, vanity lights, switches. repl switches/outlets throughout. h.e. lights per t-24. also garbage disposal in kitchen at unit #8a only, no structur | $5,000 |
| Apr 2, 2009 | Completed | 1200 Gough St | unit 4-d - remodel existing kitchen & bathroom. no structural work. | $12,000 |
| Feb 12, 2008 | Completed | 1200 Gough St | replace kitchen countertops, bathroom vanity top/medicine cabinets. | $1,000 |