Back to bathroom remodel contractors
Sean M O'reilly
- Based in
- San Francisco
- On San Francisco permits
- Feb 2008 to Aug 2026
- Last 24 months
- 10 permits filed
56 permits since 2000: 54 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
34 bathroom remodel permits: 34 completed. Typically 0 days from filing to permit and 84 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 15, 2026 | Completed final sign-off Sep 2026 | 1445 Greenwich St | unit 207: bathroom and kitchen remodel like for like, new cabinets, counter tops, tiles, plumbing and electical updates as needed.Details
unit 207: bathroom and kitchen remodel like for like, new cabinets, counter tops, tiles, plumbing and electical updates as needed. | $30,000 |
| May 15, 2026 | Completed final sign-off Oct 2026 | 923 Eddy St | unit 102: bathroom and kitchen remodel like for like, new cabinets, counter tops, tiles, plumbing and electical updates as needed.Details
unit 102: bathroom and kitchen remodel like for like, new cabinets, counter tops, tiles, plumbing and electical updates as needed. | $30,000 |
| May 15, 2026 | Completed final sign-off Oct 2026 | 923 Eddy St | unit 304: bathroom and kitchen remodel like for like, new cabinets, counter tops, tiles, plumbing and electical updates as needed.Details
unit 304: bathroom and kitchen remodel like for like, new cabinets, counter tops, tiles, plumbing and electical updates as needed. | $30,000 |
| Jan 7, 2026 | Completed final sign-off Apr 2026 | 923 Eddy St | apt.#103: remodel kitchen- new cabinets and countertops. bathroom remodel-new tile and fixtures, no structural changes in unit.Details
apt.#103: remodel kitchen- new cabinets and countertops. bathroom remodel-new tile and fixtures, no structural changes in unit. | $30,000 |
| Feb 5, 2025 | Completed final sign-off May 2025 | 923 Eddy St | unit# 204: remodel kitchen and bathroom in kind. new cabinets, countertops, tile fixtures - no structural changes. - electrical and plumbing to be pulled separately by subcontractors. no removall of wallsDetails
unit# 204: remodel kitchen and bathroom in kind. new cabinets, countertops, tile fixtures - no structural changes. - electrical and plumbing to be pulled separately by subcontractors. no removall of walls | $35,000 |
| Oct 28, 2024 | Completed final sign-off Feb 2025 | 923 Eddy St | unit# 206: remodel kitchen and bathroom in kind. new cabinets, countertops, tile fixtures - no structural changes. electrical and plumbing to be pulled separately by subcontractors. no removall of wallsDetails
unit# 206: remodel kitchen and bathroom in kind. new cabinets, countertops, tile fixtures - no structural changes. electrical and plumbing to be pulled separately by subcontractors. no removall of walls | $30,000 |
| Jun 7, 2023 | Completed final sign-off Oct 2023 | 923 Eddy St | apt# 302: remodel one kitchen new cabinets countertops tile remodel one bathroom new shower tile fixtures no structural changes . electrician and plumber to obtain seperate permits.Details
apt# 302: remodel one kitchen new cabinets countertops tile remodel one bathroom new shower tile fixtures no structural changes . electrician and plumber to obtain seperate permits. | $30,000 |
| Apr 24, 2023 | Completed final sign-off Aug 2023 | 629 Arguello Bl | apt#306: remodel one kitchen and one bathroom - replace kitchen cabinets and countertops. replace bathroom fixtures and tile - no structural changes.Details
apt#306: remodel one kitchen and one bathroom - replace kitchen cabinets and countertops. replace bathroom fixtures and tile - no structural changes. | $35,000 |
| Mar 29, 2023 | Completed final sign-off Jun 2023 | 1445 Greenwich St | unit 301: kitchen remodel- replace cabinets ad countertops. remodel 2 bathrooms- replace fixtures- new tile, plumber and electrician to obtain separate permits. no structural changes.Details
unit 301: kitchen remodel- replace cabinets ad countertops. remodel 2 bathrooms- replace fixtures- new tile, plumber and electrician to obtain separate permits. no structural changes. | $30,000 |
| Jan 10, 2023 | Completed final sign-off Apr 2023 | 775 Post St | unit #102: remodel kitchen and one bathroom. replace cabinets and countertops - no structural changes. remodel bathroom, add shower, and washer/dryer to unit. plumber and electrician to obtain separate permits.Details
unit #102: remodel kitchen and one bathroom. replace cabinets and countertops - no structural changes. remodel bathroom, add shower, and washer/dryer to unit. plumber and electrician to obtain separate permits. | $40,000 |
| Jul 11, 2022 | Completed final sign-off Nov 2022 | 1445 Greenwich St | apt 106: remodel 1 kitchen, rpelace cabinets and countertops. remodel bathroom: new fixtures . no structural changes. electrical and plumbing permits sep by others.Details
apt 106: remodel 1 kitchen, rpelace cabinets and countertops. remodel bathroom: new fixtures . no structural changes. electrical and plumbing permits sep by others. | $20,000 |
| Dec 23, 2020 | Completed final sign-off Mar 2021 | 49 Broderick St | unit #16: remodel kitchen & bathroom. no structural changes. new electrical & plumbing to be obtained by electrician & plumber.Details
unit #16: remodel kitchen & bathroom. no structural changes. new electrical & plumbing to be obtained by electrician & plumber. | $45,000 |
| Oct 16, 2019 | Completed final sign-off Dec 2019 | 775 Post St | unit 208. remodel kitchen as is, no structural changes. partial remodel of bathroom -new shower valve, wall tile, vanity, toiletDetails
unit 208. remodel kitchen as is, no structural changes. partial remodel of bathroom -new shower valve, wall tile, vanity, toilet | $35,000 |
| Jun 28, 2018 | Completed final sign-off Dec 2018 | 775 Post St | unit 310. non-structural interior remodel. relocate kitchen, remodel (e) bathroom, provide (add) (n) bathroom, provide (add) add (n) bedroomDetails
unit 310. non-structural interior remodel. relocate kitchen, remodel (e) bathroom, provide (add) (n) bathroom, provide (add) add (n) bedroom | $45,000 |
| Jan 8, 2018 | Completed final sign-off Apr 2019 | 775 Post St | unit#205 remodel kitchen & bathroom. new electrical. new drywall throughout in same location. n/a for maher.Details
unit#205 remodel kitchen & bathroom. new electrical. new drywall throughout in same location. n/a for maher. | $30,000 |
| Mar 15, 2017 | Completed final sign-off Jun 2017 | 2201 California St | unit #1 - kitchen & bathroom remodel, new electrical/plumbing. all in-kind remodel.Details
unit #1 - kitchen & bathroom remodel, new electrical/plumbing. all in-kind remodel. | $30,000 |
| Jul 22, 2016 | Completed final sign-off Nov 2016 | 775 Post St | #501 interior remodel - relocate kitchen. remodel (e) bath. provide new bedroom and bathroom. maher na add new bathroomDetails
#501 interior remodel - relocate kitchen. remodel (e) bath. provide new bedroom and bathroom. maher na add new bathroom | $50,000 |
| Apr 11, 2016 | Completed final sign-off May 2016 | 775 Post St | work in unit #203: replace 50% of kitchen cabinet, bathroom vanity, install exhaust fan, new countertop, sink. no new wall & no existing wall relocation. no structural work. lighting shall comply with cec 150.0(k)3 & 5. new electrical & upgrade plumbing. new sheetrock shall be min. 5/8" type x.Details
work in unit #203: replace 50% of kitchen cabinet, bathroom vanity, install exhaust fan, new countertop, sink. no new wall & no existing wall relocation. no structural work. lighting shall comply with cec 150.0(k)3 & 5. new electrical & upgrade plumbing. new sheetrock shall be min. 5/8" type x. | $20,000 |
| Apr 11, 2016 | Completed final sign-off Jun 2016 | 1007 Haight St | kitchen & bathroom remodel at unit #7. no new wall & no existing wall relocation. no structural work. lighting shall comply with cec 150.0(k)3 & 5 resp. all new sheetrock shall be min. 5/8" type x. plumber & electrican to obtain their respective permits.Details
kitchen & bathroom remodel at unit #7. no new wall & no existing wall relocation. no structural work. lighting shall comply with cec 150.0(k)3 & 5 resp. all new sheetrock shall be min. 5/8" type x. plumber & electrican to obtain their respective permits. | $30,000 |
| Feb 2, 2016 | Completed final sign-off Apr 2016 | 929 Pine St | remodel kitchen , new cabinets counters, replace bathroom vaity new electrical, electrician to obtain permit, plumber to obtain plumbing permit. work in unit # 202Details
remodel kitchen , new cabinets counters, replace bathroom vaity new electrical, electrician to obtain permit, plumber to obtain plumbing permit. work in unit # 202 | $25,000 |
| Dec 18, 2015 | Completed final sign-off Feb 2016 | 977 Pine St | unit#307. remodel kitchenette, bathroom, relocate electrical panel from closet. electrician & plumber to obtain separate permits. no structural changes to unit. n/a for maher.Details
unit#307. remodel kitchenette, bathroom, relocate electrical panel from closet. electrician & plumber to obtain separate permits. no structural changes to unit. n/a for maher. | $20,000 |
| Jun 29, 2015 | Completed final sign-off Sep 2015 | 775 Post St | unit 309: remodel kitchen - new cabinets, countertops, no structural changes. new electrical & plumbing upgrades. plumber & electrician to obtain separate permits. new toilet, vanity, bathroom fan, no walls to be moved or added. compliance with maher ordinance no 155-13 not required.Details
unit 309: remodel kitchen - new cabinets, countertops, no structural changes. new electrical & plumbing upgrades. plumber & electrician to obtain separate permits. new toilet, vanity, bathroom fan, no walls to be moved or added. compliance with maher ordinance no 155-13 not required. | $25,000 |
| Mar 2, 2015 | Completed final sign-off Jul 2015 | 1007 Haight St | unit #4: remodel kitchen and bathroom. remove non structural partition wall separating bathroom. new electrical and plumbing plumber and electrician to obtain permits.Details
unit #4: remodel kitchen and bathroom. remove non structural partition wall separating bathroom. new electrical and plumbing plumber and electrician to obtain permits. | $25,000 |
| Oct 6, 2014 | Completed final sign-off Dec 2014 | 977 Pine St | unit 1 - remodel kitchette & bathroom - upgrade elect. - new shower valve, replace angle-stops, throughout; new tile in bathroom, new wall heater; elect. & plumbing contractors to obtain separate permits. to comply with cec150.0(k)3 & 5. no changes to doors/windowsDetails
unit 1 - remodel kitchette & bathroom - upgrade elect. - new shower valve, replace angle-stops, throughout; new tile in bathroom, new wall heater; elect. & plumbing contractors to obtain separate permits. to comply with cec150.0(k)3 & 5. no changes to doors/windows | $15,000 |
| Oct 25, 2013 | Completed final sign-off Jan 2014 | 775 Post St | to comply with complaint #199817036, apt# 609 replace portion of kitchen cabinets countertops, sink ,hood ,appliances, tile in bathroom,vanity, lights outlets switches, throughout upgrade electrical & plumbing seperate permits to be obtained ,no structural chages .Details
to comply with complaint #199817036, apt# 609 replace portion of kitchen cabinets countertops, sink ,hood ,appliances, tile in bathroom,vanity, lights outlets switches, throughout upgrade electrical & plumbing seperate permits to be obtained ,no structural chages . | $12,000 |
| Sep 17, 2013 | Completed final sign-off Oct 2013 | 977 Pine St | remodel kitcehnett & bathroom new cabinets, counters, sinks faucets, new shower valve, angle stops tile in bathroom replace light fixtures, outlets, switches, wall heaters, stove hood& appliances, in unit 303Details
remodel kitcehnett & bathroom new cabinets, counters, sinks faucets, new shower valve, angle stops tile in bathroom replace light fixtures, outlets, switches, wall heaters, stove hood& appliances, in unit 303 | $10,000 |
| Feb 6, 2013 | Completed final sign-off Apr 2013 | 415 Buchanan St | #b-1 -remodel one kitchen,one bathroom, new elect,plbg, demo lathe & plaster in kitchen, bath, hallway, new drywall shall be 5/8" type x gypsum board,new gas valve kitchen & bathroom cabinets, sinks, countertops (no dish washer or disposer) no structural changes, separate plbg,elec permit.Details
#b-1 -remodel one kitchen,one bathroom, new elect,plbg, demo lathe & plaster in kitchen, bath, hallway, new drywall shall be 5/8" type x gypsum board,new gas valve kitchen & bathroom cabinets, sinks, countertops (no dish washer or disposer) no structural changes, separate plbg,elec permit. | $20,000 |
| Sep 19, 2012 | Completed final sign-off Nov 2012 | 101 Point Lobos Av | work for apts # 207 & 308- remodel kitchen new cabinets, counters. appliances ,add dishwasher,microwave.change anglestop in kitcen & bathroom replace &reroute gas valve for stove, new shower valve in ap#308, new faucets in bathroom, new electrical throughout .Details
work for apts # 207 & 308- remodel kitchen new cabinets, counters. appliances ,add dishwasher,microwave.change anglestop in kitcen & bathroom replace &reroute gas valve for stove, new shower valve in ap#308, new faucets in bathroom, new electrical throughout . | $24,000 |
| May 24, 2012 | Completed final sign-off Aug 2012 | 101 Point Lobos Av | units# 202, 203, 206: replace cabinets, countertops, appliances in kitchen, add dishwashers, repair tile in bathroom, replace some vanities, no structural changes in units, seperate plumbing & electrical permits.Details
units# 202, 203, 206: replace cabinets, countertops, appliances in kitchen, add dishwashers, repair tile in bathroom, replace some vanities, no structural changes in units, seperate plumbing & electrical permits. | $30,000 |
| May 24, 2012 | Completed final sign-off Sep 2012 | 101 Point Lobos Av | units# 101, 104, 106: #101- install compact kitchen unit, #104, 106- replace cabinets, countertops, appliances in kitchen, add dishwashers, repair tile in bathroom, replace vanities, no structural changes, seperate plumbing & electrical permits.Details
units# 101, 104, 106: #101- install compact kitchen unit, #104, 106- replace cabinets, countertops, appliances in kitchen, add dishwashers, repair tile in bathroom, replace vanities, no structural changes, seperate plumbing & electrical permits. | $30,000 |
| May 9, 2012 | Completed final sign-off Jun 2012 | 101 Point Lobos Av | #403, 404, 406- replace kitchen cabinets, countertops, appliances, replace bathroom vanities, repair tile, no structural changes.Details
#403, 404, 406- replace kitchen cabinets, countertops, appliances, replace bathroom vanities, repair tile, no structural changes. | $24,000 |
| Jul 5, 2011 | Completed final sign-off Aug 2011 | 1200 Gough St | replace (e) dishwasher, cooktop, microwave, light fixtures, outlets, switches, bathroom & kitchen sinks, faucets, disposal, countertops. no structural changes, no walls opened, no cabinets.Details
replace (e) dishwasher, cooktop, microwave, light fixtures, outlets, switches, bathroom & kitchen sinks, faucets, disposal, countertops. no structural changes, no walls opened, no cabinets. | $10,000 |
| Apr 2, 2009 | Completed final sign-off Jun 2009 | 1200 Gough St | unit 4-d - remodel existing kitchen & bathroom. no structural work.Details
unit 4-d - remodel existing kitchen & bathroom. no structural work. | $12,000 |
| Feb 12, 2008 | Completed final sign-off Mar 2008 | 1200 Gough St | replace kitchen countertops, bathroom vanity top/medicine cabinets.Details
replace kitchen countertops, bathroom vanity top/medicine cabinets. | $1,000 |