Block 0304, lot 014
775 Post St
29 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 10, 2023 | Completed | 775 Post St | Sean M O'reilly | unit #102: remodel kitchen and one bathroom. replace cabinets and countertops - no structural changes. remodel bathroom, add shower, and washer/dryer to unit. plumber and electrician to obtain separate permits. | $40,000 |
| Aug 19, 2022 | Completed | 775 Post St | Sean M O'reilly | unit #511: remodel kitchen. replace cabinets and countertops. no structural changes. electrician and plumber to obtain separate permits. | $20,000 |
| May 17, 2022 | Completed | 775 Post St | Sean M O'reilly | unit 301: remodel one kitchen. replace cabinets and countertops. no structural changes. electrician and plumber to obtain seperate permits | $20,000 |
| Apr 26, 2022 | Completed | 775 Post St | Sean M O'reilly | unit 104: remodel (1) kitchen, replace cabinets, countertops, no structural changes. plumber and electrician to obtain seperate permits. | $20,000 |
| Apr 15, 2022 | Completed | 775 Post St | Sean M O'reilly | ste 505: remodel one kitchen, replace cabinets, counter tops, no structural changes. electrican and plumber to obtain sep permit. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0(k)3. | $20,000 |
| Sep 24, 2021 | Completed | 775 Post St | Sean M O'reilly | #604: remodel one kitchen: replace cabinets, countertops. no structural changes. new electrical/plumbing upgrades. electgrician and plumber to obtain seperate permit. lights per cenc 150.0 (k) | $10,000 |
| Dec 13, 2019 | Never finaled | 775 Post St | street space | ||
| Oct 16, 2019 | Completed | 775 Post St | Sean M O'reilly | unit 208. remodel kitchen as is, no structural changes. partial remodel of bathroom -new shower valve, wall tile, vanity, toilet | $35,000 |
| Oct 2, 2019 | Completed | 775 Post St | Reed Electric Company Inc Dba Century El | replace (e) fire alarm system to comply with 2016 codes. install low frequency sounders in all sleeping areas to comply with sffc 1103.7.6.1 | $25,000 |
| May 1, 2019 | Never finaled | 775 Post St | street space | ||
| Jan 30, 2019 | Never finaled | 775 Post St | street space only | ||
| Jul 18, 2018 | Never finaled | 775 Post St | street space | ||
| Jun 28, 2018 | Completed | 775 Post St | Sean M O'reilly | unit 310. non-structural interior remodel. relocate kitchen, remodel (e) bathroom, provide (add) (n) bathroom, provide (add) add (n) bedroom | $45,000 |
| Jan 26, 2018 | Completed | 775 Post St | Sean M O'reilly | #205: revision to #201801088092, administrative permit to have additional valuation of $60,000. | $60,000 |
| Jan 8, 2018 | Completed | 775 Post St | Sean M O'reilly | unit#205 remodel kitchen & bathroom. new electrical. new drywall throughout in same location. n/a for maher. | $30,000 |
| Jan 8, 2018 | Completed | 775 Post St | Sean M O'reilly | unit#305 remodel kitchen. upgrade electrical. in same location. n/a for maher. | $20,000 |
| Jan 8, 2018 | Completed | 775 Post St | Sean M O'reilly | unit#101 remodel kitchen. upgrade electrical. in same location. n/a for maher. | $20,000 |
| Jul 22, 2016 | Completed | 775 Post St | Sean M O'reilly | #501 interior remodel - relocate kitchen. remodel (e) bath. provide new bedroom and bathroom. maher na add new bathroom | $50,000 |
| Apr 11, 2016 | Completed | 775 Post St | Sean M O'reilly | work in unit #203: replace 50% of kitchen cabinet, bathroom vanity, install exhaust fan, new countertop, sink. no new wall & no existing wall relocation. no structural work. lighting shall comply with cec 150.0(k)3 & 5. new electrical & upgrade plumbing. new sheetrock shall be min. 5/8" type x. | $20,000 |
| Jun 29, 2015 | Completed | 775 Post St | Sean M O'reilly | unit 309: remodel kitchen - new cabinets, countertops, no structural changes. new electrical & plumbing upgrades. plumber & electrician to obtain separate permits. new toilet, vanity, bathroom fan, no walls to be moved or added. compliance with maher ordinance no 155-13 not required. | $25,000 |
| Mar 6, 2015 | Never finaled | 775 Post St | street space and mta | ||
| Aug 19, 2014 | Completed | 775 Post St | Precision Design & Drafting Inc | wireless site facility , remove all towerstream wi-fi antennas & associated equipment. to comply with planning noe #12330 and building nov 201387906. | $500 |
| Oct 25, 2013 | Completed | 775 Post St | Sean M O'reilly | to comply with complaint #199817036, apt# 609 replace portion of kitchen cabinets countertops, sink ,hood ,appliances, tile in bathroom,vanity, lights outlets switches, throughout upgrade electrical & plumbing seperate permits to be obtained ,no structural chages . | $12,000 |
| Dec 22, 2009 | Never finaled | 775 Post St | street space | ||
| Nov 23, 2009 | Never finaled | 775 Post St | street space and mta parking | ||
| Oct 20, 2009 | Never finaled | 775 Post St | street space & mta | ||
| Aug 28, 2009 | Never finaled | 775 Post St | street space permit | ||
| Aug 24, 2009 | Never finaled | 775 Post St | street space & mta. | ||
| Mar 26, 2004 | Never finaled | 775 Post St | sidewalk and street space permit |