Back to kitchen remodel contractors
The Sustainable Cbo Inc Dba Oliver Macki
- Based in
- San Francisco
- On San Francisco permits
- Dec 2013 to Feb 2026
- Last 24 months
- 9 permits filed
62 permits since 2000: 55 completed, 5 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
22 kitchen remodel permits: 22 completed. Typically 0 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 15, 2025 | Completed final sign-off Aug 2026 | 1259 15th Av | level 2 - remodel kitchen, add powder room. level 3 - add bathroom, remodel bathroom. structrual work, new windows, doors. rear door modification under permit 202506027679 (shared plan)Details
level 2 - remodel kitchen, add powder room. level 3 - add bathroom, remodel bathroom. structrual work, new windows, doors. rear door modification under permit 202506027679 (shared plan) | $300,000 |
| Mar 28, 2025 | Completed final sign-off Jun 2025 | 171 Valmar Tr | remodel kitchen in kind. remove cabinets and appliances. remove rock from ceiling and walls in the kitchen. upgrade electrical in the house. install insulation in the kitchen. install 5/8" type x rock in the kitchen. install new cabinets and appliances in the kitchen.Details
remodel kitchen in kind. remove cabinets and appliances. remove rock from ceiling and walls in the kitchen. upgrade electrical in the house. install insulation in the kitchen. install 5/8" type x rock in the kitchen. install new cabinets and appliances in the kitchen. | $45,000 |
| Oct 23, 2023 | Completed final sign-off Jul 2024 | 423 16th Av | 2nd fl: remove wall between kitchen and dining and powder room. 3rd fl: incorporate wc into e bath add bathroomDetails
2nd fl: remove wall between kitchen and dining and powder room. 3rd fl: incorporate wc into e bath add bathroom | $130,000 |
| May 9, 2023 | Completed final sign-off Oct 2023 | 2286 15th St | remodel unit 2286a: remodel kitchen and bathroom in kind. replace (7) windows at the rear of the unit. new electrical and plumbing per code. install insulation in the exterior walls and ceiling. windows not visible from street. same size, same location, max ufactor 0.3. interior work repair in kind.Details
remodel unit 2286a: remodel kitchen and bathroom in kind. replace (7) windows at the rear of the unit. new electrical and plumbing per code. install insulation in the exterior walls and ceiling. windows not visible from street. same size, same location, max ufactor 0.3. interior work repair in kind. | $70,000 |
| Dec 22, 2022 | Completed final sign-off Oct 2023 | 293 Magellan Av | remodel 1 kitchen. replace 3 windows and 1 french door at rear of the house. u=0.3 max. dryrot repair. remove and replace approx. 100 sq ft of stucco at building rear. all work not visible from street. no alteration of wall and door.Details
remodel 1 kitchen. replace 3 windows and 1 french door at rear of the house. u=0.3 max. dryrot repair. remove and replace approx. 100 sq ft of stucco at building rear. all work not visible from street. no alteration of wall and door. | $60,000 |
| Dec 22, 2022 | Completed final sign-off Mar 2023 | 921 Crescent Av | remodel 1 kitchen and 1 bathroom. no alteration of wall, door or window.Details
remodel 1 kitchen and 1 bathroom. no alteration of wall, door or window. | $60,000 |
| Jan 4, 2022 | Completed final sign-off Aug 2023 | 624 Gates St | remove wall between kitchen and living room. remodel kitchen.Details
remove wall between kitchen and living room. remodel kitchen. | $40,000 |
| Nov 3, 2021 | Completed final sign-off Nov 2022 | 1021 Portola Dr | kitchen and bath remodel at 2nd fl. remove structural wall between kitchen and dining rm. install new beam where wall is removed. replace windows in kind in kitchen and bath, not visible from street. remodel bath on lower level. replace 2 windows in kind in family roomDetails
kitchen and bath remodel at 2nd fl. remove structural wall between kitchen and dining rm. install new beam where wall is removed. replace windows in kind in kitchen and bath, not visible from street. remodel bath on lower level. replace 2 windows in kind in family room | $150,000 |
| Dec 20, 2019 | Completed final sign-off Feb 2020 | 4631 18th St | remodel kitchen and add powder room in 4631 & 4633 18th stDetails
remodel kitchen and add powder room in 4631 & 4633 18th st | $80,000 |
| Mar 13, 2018 | Completed final sign-off Sep 2018 | 541 Gates St | remove bearing wall between kitchen & living, kitchen remodel, bathroom remodel.Details
remove bearing wall between kitchen & living, kitchen remodel, bathroom remodel. | $15,000 |
| Jan 24, 2017 | Completed final sign-off Jan 2018 | 449 Gates St | remodel of existing house - add a new bath, relocate kitchen, new water heater.Details
remodel of existing house - add a new bath, relocate kitchen, new water heater. | $60,000 |
| Jan 24, 2017 | Completed final sign-off Jun 2017 | 423 Waller St | #3:remodel kitchen & bathroom. remove kitchen cabinets, remove bath tub, toilet & sink. remove sheetrock from walls & ceiling of kitchen & bathroom. new electrical & plumbing per code. install insulation in walls & ceiling of kitchen & bathroom.install 5/8" type x rock on the walls & ceiling.installDetails
#3:remodel kitchen & bathroom. remove kitchen cabinets, remove bath tub, toilet & sink. remove sheetrock from walls & ceiling of kitchen & bathroom. new electrical & plumbing per code. install insulation in walls & ceiling of kitchen & bathroom.install 5/8" type x rock on the walls & ceiling.install | $39,000 |
| Jun 30, 2016 | Completed final sign-off Sep 2016 | 1835 Golden Gate Av | remodel kitchen remove lath & plaster,remove partial non bearing wall plumbing & electrical per code,insulate exterior wall & ceiling, install 5/8" sheetrock, & install cabinets & appliances.Details
remodel kitchen remove lath & plaster,remove partial non bearing wall plumbing & electrical per code,insulate exterior wall & ceiling, install 5/8" sheetrock, & install cabinets & appliances. | $24,000 |
| May 3, 2016 | Completed final sign-off Jul 2016 | 1315 Diamond St | remodel kitchen, remove cabinets & appliances,remove lath & plaster from walls & ceiling,elec & plmbg per code.insulate exterior wall & ceiling new 5/8"sheetrock on the walls & ceiling,install cabinets & appliances.Details
remodel kitchen, remove cabinets & appliances,remove lath & plaster from walls & ceiling,elec & plmbg per code.insulate exterior wall & ceiling new 5/8"sheetrock on the walls & ceiling,install cabinets & appliances. | $25,000 |
| Jan 13, 2016 | Completed final sign-off Mar 2016 | 801 Crescent Av | remodel kitchen. remove sheetrock from walls and ceiling and all cabinets and appliances. new electrical and plumbing per code. insulate walls and ceiling, 5/8" sheetrock on walls and ceiling. replae one garden window. not visible from the street.Details
remodel kitchen. remove sheetrock from walls and ceiling and all cabinets and appliances. new electrical and plumbing per code. insulate walls and ceiling, 5/8" sheetrock on walls and ceiling. replae one garden window. not visible from the street. | $25,000 |
| Jul 27, 2015 | Completed final sign-off Mar 2016 | 60 Douglass St | new master bath remodel existing kitchen and bath add laundry to top level open up wall between kitchen and dining roomDetails
new master bath remodel existing kitchen and bath add laundry to top level open up wall between kitchen and dining room | $150,000 |
| Mar 27, 2015 | Completed final sign-off Jan 2016 | 159 Castenada Av | kitchen/bath remodel on level 2 and add a bedroom and bath on level 1.Details
kitchen/bath remodel on level 2 and add a bedroom and bath on level 1. | $150,000 |
| Jan 14, 2015 | Completed final sign-off Apr 2015 | 2626 22nd Av | kitchen remodel; to comply with cec150.0(k)3. remove lath & plaster. new electrical & plumbing insulate exterior walls & ceilings. install 5/8" sheetrock on walls & ceiling. install cabinets & appliances.Details
kitchen remodel; to comply with cec150.0(k)3. remove lath & plaster. new electrical & plumbing insulate exterior walls & ceilings. install 5/8" sheetrock on walls & ceiling. install cabinets & appliances. | $25,000 |
| May 5, 2014 | Completed final sign-off Jul 2015 | 901 Jarboe Av | remodel of extg kitchen and bathroom of units 3 and 4 of extg 4 unit bldg. minor interior remodeling.Details
remodel of extg kitchen and bathroom of units 3 and 4 of extg 4 unit bldg. minor interior remodeling. | $50,000 |
| Apr 28, 2014 | Completed final sign-off Sep 2014 | 2999 California St | unit 604: remodel kitchen demo cabinets & sheetrock from the walls & ceiling. new electricial & plumbing to meet code, new 5/8" sheetrock on the ceiling & walls. install new cabinets & appliances. install new counter top. no structural work, no wall modification.Details
unit 604: remodel kitchen demo cabinets & sheetrock from the walls & ceiling. new electricial & plumbing to meet code, new 5/8" sheetrock on the ceiling & walls. install new cabinets & appliances. install new counter top. no structural work, no wall modification. | $25,500 |
| Mar 28, 2014 | Completed final sign-off Aug 2014 | 865 Portola Dr | revision to pa #201403130662; remove (plus or minus) 5 walls between kitchen & nook area @2nd floor. original kitchen remodelling work under pa #201403130662.Details
revision to pa #201403130662; remove (plus or minus) 5 walls between kitchen & nook area @2nd floor. original kitchen remodelling work under pa #201403130662. | $5,000 |
| Mar 13, 2014 | Completed final sign-off Aug 2014 | 865 Portola Dr | remodel kitchen , remove cabinets & appliances, remove sheetrock from walls and ceiling, new electric & plumbing per code insulate exterior wall & ceiling, new 5/8" sheetrock, install new cabinets & new appliances, all (n) lights shall comply with cec150(k)Details
remodel kitchen , remove cabinets & appliances, remove sheetrock from walls and ceiling, new electric & plumbing per code insulate exterior wall & ceiling, new 5/8" sheetrock, install new cabinets & new appliances, all (n) lights shall comply with cec150(k) | $25,000 |