Back to bathroom remodel contractors
The Sustainable Cbo Inc Dba Oliver Macki
- Based in
- San Francisco
- On San Francisco permits
- Dec 2013 to Feb 2026
- Last 24 months
- 9 permits filed
62 permits since 2000: 55 completed, 5 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 18 completed, 1 in progress. Typically 7 days from filing to permit and 238 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 15, 2025 | Completed final sign-off Aug 2026 | 1259 15th Av | level 2 - remodel kitchen, add powder room. level 3 - add bathroom, remodel bathroom. structrual work, new windows, doors. rear door modification under permit 202506027679 (shared plan)Details
level 2 - remodel kitchen, add powder room. level 3 - add bathroom, remodel bathroom. structrual work, new windows, doors. rear door modification under permit 202506027679 (shared plan) | $300,000 |
| Oct 23, 2023 | Completed final sign-off Jul 2024 | 423 16th Av | 2nd fl: remove wall between kitchen and dining and powder room. 3rd fl: incorporate wc into e bath add bathroomDetails
2nd fl: remove wall between kitchen and dining and powder room. 3rd fl: incorporate wc into e bath add bathroom | $130,000 |
| May 9, 2023 | Completed final sign-off Oct 2023 | 2286 15th St | remodel unit 2286a: remodel kitchen and bathroom in kind. replace (7) windows at the rear of the unit. new electrical and plumbing per code. install insulation in the exterior walls and ceiling. windows not visible from street. same size, same location, max ufactor 0.3. interior work repair in kind.Details
remodel unit 2286a: remodel kitchen and bathroom in kind. replace (7) windows at the rear of the unit. new electrical and plumbing per code. install insulation in the exterior walls and ceiling. windows not visible from street. same size, same location, max ufactor 0.3. interior work repair in kind. | $70,000 |
| Dec 22, 2022 | Completed final sign-off Mar 2023 | 921 Crescent Av | remodel 1 kitchen and 1 bathroom. no alteration of wall, door or window.Details
remodel 1 kitchen and 1 bathroom. no alteration of wall, door or window. | $60,000 |
| Dec 22, 2022 | Completed final sign-off May 2023 | 4721 Lincoln Wy | remodel existing bathroom. no change to wallsDetails
remodel existing bathroom. no change to walls | $11,300 |
| Oct 11, 2022 | In progress issued Mar 2025 | 801 Crescent Av | 2 story horizontal addition with connection to the main house. addition to include laundry and storage at l1, bedroom and bath @ l2 and roof deck above. reference pa# 2022-1012-4161 for demo of (e) detached garageDetails
2 story horizontal addition with connection to the main house. addition to include laundry and storage at l1, bedroom and bath @ l2 and roof deck above. reference pa# 2022-1012-4161 for demo of (e) detached garage | $200,000 |
| Nov 3, 2021 | Completed final sign-off Nov 2022 | 1021 Portola Dr | kitchen and bath remodel at 2nd fl. remove structural wall between kitchen and dining rm. install new beam where wall is removed. replace windows in kind in kitchen and bath, not visible from street. remodel bath on lower level. replace 2 windows in kind in family roomDetails
kitchen and bath remodel at 2nd fl. remove structural wall between kitchen and dining rm. install new beam where wall is removed. replace windows in kind in kitchen and bath, not visible from street. remodel bath on lower level. replace 2 windows in kind in family room | $150,000 |
| Mar 13, 2018 | Completed final sign-off Sep 2018 | 541 Gates St | remove bearing wall between kitchen & living, kitchen remodel, bathroom remodel.Details
remove bearing wall between kitchen & living, kitchen remodel, bathroom remodel. | $15,000 |
| Nov 1, 2017 | Completed final sign-off Dec 2021 | 482 Gates St | adu per ordinance no# 162-16. 1 bedroom & 1 bath.Details
adu per ordinance no# 162-16. 1 bedroom & 1 bath. | $50,000 |
| Apr 27, 2017 | Completed final sign-off May 2019 | 4127 20th St | revision to 201703272423, enlarge bathroom and master closet at 3rd floor. remove (2) walls at the third floor story for new plan configuration.Details
revision to 201703272423, enlarge bathroom and master closet at 3rd floor. remove (2) walls at the third floor story for new plan configuration. | $5,000 |
| Mar 27, 2017 | Completed final sign-off Nov 2017 | 4136 Folsom St | master suite creation- add bathroom & closet to bedroom @ garage level.Details
master suite creation- add bathroom & closet to bedroom @ garage level. | $40,000 |
| Mar 27, 2017 | Completed final sign-off May 2019 | 4127 20th St | 2 baths remodel , 1 bedroom enlarge & repalce windows not visible form the street , windows not on the property lineDetails
2 baths remodel , 1 bedroom enlarge & repalce windows not visible form the street , windows not on the property line | $100,000 |
| Jan 24, 2017 | Completed final sign-off Jan 2018 | 449 Gates St | remodel of existing house - add a new bath, relocate kitchen, new water heater.Details
remodel of existing house - add a new bath, relocate kitchen, new water heater. | $60,000 |
| Jan 24, 2017 | Completed final sign-off Jun 2017 | 423 Waller St | #3:remodel kitchen & bathroom. remove kitchen cabinets, remove bath tub, toilet & sink. remove sheetrock from walls & ceiling of kitchen & bathroom. new electrical & plumbing per code. install insulation in walls & ceiling of kitchen & bathroom.install 5/8" type x rock on the walls & ceiling.installDetails
#3:remodel kitchen & bathroom. remove kitchen cabinets, remove bath tub, toilet & sink. remove sheetrock from walls & ceiling of kitchen & bathroom. new electrical & plumbing per code. install insulation in walls & ceiling of kitchen & bathroom.install 5/8" type x rock on the walls & ceiling.install | $39,000 |
| Sep 19, 2016 | Completed final sign-off Dec 2016 | 4655 18th St | remodel bathroom - remove tub & other plbg fixtures. remove sheetrock from the walls & ceiling, new elect. & plbg per code. insulate exterior wall & ceiling. new 5/8" sheetrock on the walls & ceiling. new tiles on the flr & walls. no walls removed, added or infilled. all e layouts to remainDetails
remodel bathroom - remove tub & other plbg fixtures. remove sheetrock from the walls & ceiling, new elect. & plbg per code. insulate exterior wall & ceiling. new 5/8" sheetrock on the walls & ceiling. new tiles on the flr & walls. no walls removed, added or infilled. all e layouts to remain | $23,000 |
| Jul 27, 2015 | Completed final sign-off Mar 2016 | 60 Douglass St | new master bath remodel existing kitchen and bath add laundry to top level open up wall between kitchen and dining roomDetails
new master bath remodel existing kitchen and bath add laundry to top level open up wall between kitchen and dining room | $150,000 |
| Mar 27, 2015 | Completed final sign-off Jan 2016 | 159 Castenada Av | kitchen/bath remodel on level 2 and add a bedroom and bath on level 1.Details
kitchen/bath remodel on level 2 and add a bedroom and bath on level 1. | $150,000 |
| May 5, 2014 | Completed final sign-off Jul 2015 | 901 Jarboe Av | remodel of extg kitchen and bathroom of units 3 and 4 of extg 4 unit bldg. minor interior remodeling.Details
remodel of extg kitchen and bathroom of units 3 and 4 of extg 4 unit bldg. minor interior remodeling. | $50,000 |
| Feb 5, 2014 | Completed final sign-off Mar 2014 | 451 11th Av | remodel bathroom, remove all bathroom fixtures, remove sheetrock from the walls & ceiling. new plumbing & electrical as per code. insulate exterior wall & ceiling. install 5/8" sheetrock on the walls & ceiling. install tile on the walls & floor. area in bathroom only.Details
remodel bathroom, remove all bathroom fixtures, remove sheetrock from the walls & ceiling. new plumbing & electrical as per code. insulate exterior wall & ceiling. install 5/8" sheetrock on the walls & ceiling. install tile on the walls & floor. area in bathroom only. | $17,500 |