Block 5739, lot 007
4136 Folsom St
- City’s use
- Single Family Residential
- Built
- 1947
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 1,254 sq ft
- Lot
- 1,750 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
4 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 3, 2025 | Completed final sign-off Sep 2025 | 4136 Folsom St | Vazquez Roofing | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,000 |
| Mar 27, 2017 | Completed final sign-off Nov 2017 | 4136 Folsom St | The Sustainable Cbo Inc Dba Oliver Macki | master suite creation- add bathroom & closet to bedroom @ garage level.Details
master suite creation- add bathroom & closet to bedroom @ garage level. | $40,000 |
| Dec 10, 2015 | Completed final sign-off Jan 2016 | 4136 Folsom St | Bay Metro Corporation | in-kind stucco repair and metal gate repair at front facade due to damagae from auto accidentDetails
in-kind stucco repair and metal gate repair at front facade due to damagae from auto accident | $5,000 |
| Feb 24, 2012 | Completed final sign-off Jul 2012 | 4136 Folsom St | finish storage space at ground floor into bedroom. install drywall and install a windowDetails
finish storage space at ground floor into bedroom. install drywall and install a window | $10,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bay Metro Corporation, The Sustainable Cbo Inc Dba Oliver Macki, Vazquez Roofing
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.