Back to kitchen remodel contractors
D N Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2011 to Jun 2026
- Last 24 months
- 8 permits filed
78 permits since 2000: 74 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
24 kitchen remodel permits: 24 completed. Typically 0 days from filing to permit and 119 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 2, 2026 | Completed final sign-off May 2026 | 572 Waller St | kitchen replace countertops only in kind, bathroom remodel, replace toilet, shower vanity, tub to shower, guest bathroom: replace toilet.Details
kitchen replace countertops only in kind, bathroom remodel, replace toilet, shower vanity, tub to shower, guest bathroom: replace toilet. | $35,000 |
| Sep 26, 2025 | Completed final sign-off Feb 2026 | 120 Alpine Tr | replace 3 windows in kind not visible from street. remodel kitchen in kind at unit #120.Details
replace 3 windows in kind not visible from street. remodel kitchen in kind at unit #120. | $650 |
| Jun 17, 2024 | Completed final sign-off Dec 2024 | 191 Robinhood Dr | interior remodel to (e) 2-story single family dwelling. remodel (e) 2nd floor bathroom. enlarge opening between kitchen and dining room. new skylight to replace e) per area of work on planDetails
interior remodel to (e) 2-story single family dwelling. remodel (e) 2nd floor bathroom. enlarge opening between kitchen and dining room. new skylight to replace e) per area of work on plan | $15,000 |
| Mar 26, 2024 | Completed final sign-off Jan 2025 | 256 Collingwood St | one kitchen: replace cabinets, counters, tiles, etc. in kind. one bathroom remodel: replace tub, vanity, toilet, tiles, etc. in kind. upper right unit.Details
one kitchen: replace cabinets, counters, tiles, etc. in kind. one bathroom remodel: replace tub, vanity, toilet, tiles, etc. in kind. upper right unit. | $55,000 |
| Jul 5, 2022 | Completed final sign-off Nov 2022 | 254 Collingwood St | kitchen and replace cabinets, counters, tile, etc. in kind. bathroom: replace tub, vanity, toilet, tiles, etc. in kind bottom left unit.Details
kitchen and replace cabinets, counters, tile, etc. in kind. bathroom: replace tub, vanity, toilet, tiles, etc. in kind bottom left unit. | $55,000 |
| Mar 28, 2022 | Completed final sign-off Apr 2023 | 3133 16th St | unit #10. kitchen: replace all cabinets, appliances, couter tops & tiles in-kind. bathroom: replace shower, vanity, toilet, tiles in kind.Details
unit #10. kitchen: replace all cabinets, appliances, couter tops & tiles in-kind. bathroom: replace shower, vanity, toilet, tiles in kind. | $40,000 |
| Nov 18, 2021 | Completed final sign-off Oct 2022 | 4136 21st St | rev to pa# 202109138336: renovate and reconfigure kitchen layout, remodel and recongigure baths at 1st & 3rd fl. add second bath at 3rd fl. replace rear deck doors at 2nd floor, new door at 1st fl. rearDetails
rev to pa# 202109138336: renovate and reconfigure kitchen layout, remodel and recongigure baths at 1st & 3rd fl. add second bath at 3rd fl. replace rear deck doors at 2nd floor, new door at 1st fl. rear | $80,000 |
| Sep 27, 2021 | Completed final sign-off Dec 2021 | 2927 Anza St | replace kitchen cabinets & counter tops in kind. lights per cebc 150.0 (k)Details
replace kitchen cabinets & counter tops in kind. lights per cebc 150.0 (k) | $6,000 |
| Sep 13, 2021 | Completed final sign-off Oct 2022 | 4136 21st St | interior remodel of 1 kitchen, 1 closet, 2 bathrooms. no alteration of wall, window and door. exterior: remove tiles and membrane from existing rear deck and replace. not visble from street.Details
interior remodel of 1 kitchen, 1 closet, 2 bathrooms. no alteration of wall, window and door. exterior: remove tiles and membrane from existing rear deck and replace. not visble from street. | $15,000 |
| Jul 19, 2021 | Completed final sign-off Oct 2021 | 4027 Irving St | kitchen: replace all cabinets, countertops, tiles, appliances in kind. bathroom: replace tub, vanity, toilet, tiles in kind.Details
kitchen: replace all cabinets, countertops, tiles, appliances in kind. bathroom: replace tub, vanity, toilet, tiles in kind. | $35,000 |
| Jul 19, 2021 | Completed final sign-off Mar 2022 | 3133 16th St | #8: kitchen:replace all cabinets, countertops, tile, appliances in kind. bathroom: replace shower, vanity, toilets, tiles in kind.Details
#8: kitchen:replace all cabinets, countertops, tile, appliances in kind. bathroom: replace shower, vanity, toilets, tiles in kind. | $35,000 |
| Jan 21, 2021 | Completed final sign-off Mar 2021 | 254 Collingwood St | bathroom: replcace tub, toilet, vanity in kind, new tiles. kitchen: replace kitchen cab, new sink in kind, new tiles.paing. building has no fire alarm.Details
bathroom: replcace tub, toilet, vanity in kind, new tiles. kitchen: replace kitchen cab, new sink in kind, new tiles.paing. building has no fire alarm. | $50,000 |
| Mar 11, 2020 | Completed final sign-off Jul 2020 | 174 22nd Av | unit 5 - kitchen & bath remodel. new cabinet, counter in kind. new tub, toilet, vanityDetails
unit 5 - kitchen & bath remodel. new cabinet, counter in kind. new tub, toilet, vanity | $30,000 |
| Jan 31, 2020 | Completed final sign-off May 2020 | 110 Broderick St | replace kitchen cabinets and counter in kind. replace vanity toilet, tub/shower in kind. paint & tile work. bathroom 6x8 kitchen 10x10.Details
replace kitchen cabinets and counter in kind. replace vanity toilet, tub/shower in kind. paint & tile work. bathroom 6x8 kitchen 10x10. | $30,000 |
| Nov 12, 2019 | Completed final sign-off Mar 2020 | 3266 20th St | remodel kitchen & bathroo. new sheetrock, cabints, vanity, tub & toilets in-kind. no alt of walls or window or doors.Details
remodel kitchen & bathroo. new sheetrock, cabints, vanity, tub & toilets in-kind. no alt of walls or window or doors. | $30,000 |
| Mar 25, 2019 | Completed final sign-off Jun 2019 | 260 King St | unit #1611: kitchen - new counters/stone tops only. bath - replace vanity, toilet, tub in kind, new tilesDetails
unit #1611: kitchen - new counters/stone tops only. bath - replace vanity, toilet, tub in kind, new tiles | $9,000 |
| Nov 9, 2018 | Completed final sign-off Mar 2019 | 690 Alvarado St | bath + kitchen replace tub, vanity, toilet + tiles in kind. kithcen: replace cabinets, sink, appliances + tiles in kind bath 5x8, kithcen 8.5 x 8.5Details
bath + kitchen replace tub, vanity, toilet + tiles in kind. kithcen: replace cabinets, sink, appliances + tiles in kind bath 5x8, kithcen 8.5 x 8.5 | $25,000 |
| Oct 23, 2018 | Completed final sign-off Jul 2019 | 930 Hayes St | units b & c: replace (2) kitchens & (2) bathrooms in-kind, new sheetrockDetails
units b & c: replace (2) kitchens & (2) bathrooms in-kind, new sheetrock | $90,000 |
| Jul 2, 2018 | Completed final sign-off Sep 2018 | 44 Varennes St | replace vanity and toilet in kind, replace wub with shower pan, kitchen new cabinets, replace storve and sink in kind sheet rock repairDetails
replace vanity and toilet in kind, replace wub with shower pan, kitchen new cabinets, replace storve and sink in kind sheet rock repair | $22,000 |
| May 12, 2017 | Completed final sign-off Jul 2017 | 1305 18th St | apt 1: bathroom: replace tub, toiklet, vainty, tiles in-kind; kitchen: replace cabinets, countertops, tiles, in-kind. no change on walls.Details
apt 1: bathroom: replace tub, toiklet, vainty, tiles in-kind; kitchen: replace cabinets, countertops, tiles, in-kind. no change on walls. | $17,000 |
| Dec 22, 2015 | Completed final sign-off Mar 2016 | 690 Alvarado St | bath & kitchen: replace tub, sink, toilet, tiles in kind. replace kitchen cabinets, sink, appliances, tiles in kind.Details
bath & kitchen: replace tub, sink, toilet, tiles in kind. replace kitchen cabinets, sink, appliances, tiles in kind. | $17,500 |
| Dec 16, 2014 | Completed final sign-off Feb 2015 | 142 Vienna St | install new kitchen cabinets in kitchen, remove sheetrock from walls in one bedrm half bath,toilet & sink, due to water damage, install insulation,new sheetrock toilet, vanity (1/2 bath downstairs).Details
install new kitchen cabinets in kitchen, remove sheetrock from walls in one bedrm half bath,toilet & sink, due to water damage, install insulation,new sheetrock toilet, vanity (1/2 bath downstairs). | $7,000 |
| Nov 25, 2014 | Completed final sign-off Jul 2015 | 1801 Vicente St | stow cottage: interior remodel of an existing grade level kitchen including demolition and installation of new casework.minor plumbing and electrical work, existing lighting shall remain.Details
stow cottage: interior remodel of an existing grade level kitchen including demolition and installation of new casework.minor plumbing and electrical work, existing lighting shall remain. | $25,000 |
| Nov 25, 2014 | Completed final sign-off Apr 2015 | 1801 Vicente St | dimond cottage: interior remodel of an existing grade level kitchen including demolition and installation of new casework. no change to existing lighting. minor plumbing and electrical workDetails
dimond cottage: interior remodel of an existing grade level kitchen including demolition and installation of new casework. no change to existing lighting. minor plumbing and electrical work | $25,000 |