Block 4037, lot 001
1301 18th St
- City’s use
- Multi-Family Residential
- Built
- 1955
- Stories
- 3
- Units
- 9
- Rooms
- 9 bathrooms
- Building
- 8,660 sq ft
- Lot
- 3,249 sq ft
- Zoning
- NC2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
14 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 30, 2026 | In progress issued Jun 2026 | 1301 18th St | Safe Assurance Fire Protection | install an ansul fire suppression for a 4' ventless hood. nfpa 17a. ref #202601224365Details
install an ansul fire suppression for a 4' ventless hood. nfpa 17a. ref #202601224365 | $4,000 |
| Jan 22, 2026 | In progress issued Jun 2026 | 1301 18th St | W Galdamez Construction | revision to pa #2025-0210-0064: relocate and modify deli equipment.Details
revision to pa #2025-0210-0064: relocate and modify deli equipment. | |
| Oct 31, 2025 | In progress issued Nov 2025 | 1301 18th St | W Galdamez Construction | revision to pa#: 202502100064. new deli within existing grocery store modify layout of equipment and sinks at back room - remove floor draw. add new equipmentDetails
revision to pa#: 202502100064. new deli within existing grocery store modify layout of equipment and sinks at back room - remove floor draw. add new equipment | |
| Feb 10, 2025 | Completed final sign-off Aug 2026 | 1301 18th St | W Galdamez Construction | new deli within grocery storeDetails
new deli within grocery store | $10,000 |
| Oct 31, 2023 | Completed final sign-off Sep 2025 | 1301 18th St | Macken Construction | repair store front widow and bulkhead. no structural work. damaged due to vandilism. repair in kind materials.Details
repair store front widow and bulkhead. no structural work. damaged due to vandilism. repair in kind materials. | $3,000 |
| Jul 13, 2021 | Never finaled filed Jul 2021, never issued | 1301 18th St | new mechanical penthouse & laundry cabinet at existing roof.Details
new mechanical penthouse & laundry cabinet at existing roof. | $20,000 | |
| Mar 2, 2018 | Completed final sign-off Jul 2018 | 1305 18th St | Ampex Engineering & Co | #8: remodel bathroom and kitchen in kind.Details
#8: remodel bathroom and kitchen in kind. | $15,000 |
| May 12, 2017 | Completed final sign-off Jul 2017 | 1305 18th St | D N Construction | apt 1: bathroom: replace tub, toiklet, vainty, tiles in-kind; kitchen: replace cabinets, countertops, tiles, in-kind. no change on walls.Details
apt 1: bathroom: replace tub, toiklet, vainty, tiles in-kind; kitchen: replace cabinets, countertops, tiles, in-kind. no change on walls. | $17,000 |
| Dec 21, 2016 | Never finaled issued Dec 2016, no final | 1301 18th St | street spaceDetails
street space | ||
| Sep 12, 2016 | Completed final sign-off Sep 2016 | 1301 18th St | Ramirez Roofing Corporation | reroofing.Details
reroofing. | $22,300 |
| Sep 21, 2015 | Completed final sign-off Oct 2016 | 1301 18th St | revision to pa 2014-0429-4495 to assign cost on the residential units above. no soft story work on upper 2 levels. soft story to 1st floor per pa 2015-0921-7547Details
revision to pa 2014-0429-4495 to assign cost on the residential units above. no soft story work on upper 2 levels. soft story to 1st floor per pa 2015-0921-7547 | $10,000 | |
| Sep 21, 2015 | Completed final sign-off Oct 2016 | 1301 18th St | revision to pa#201404294495 soft story drawings modified to reflect existing field conditions.Details
revision to pa#201404294495 soft story drawings modified to reflect existing field conditions. | ||
| Apr 29, 2014 | Completed final sign-off Oct 2016 | 1301 18th St | soft story retrofit by inserting 12 steel strong walls in extg walls, drill/ epoxy into extg foundation and connect the top plate to extg 2nd floor framing. no alteration to architectural and aesthetics as all walls will be restored to extg finishes. engineering criteria used a4Details
soft story retrofit by inserting 12 steel strong walls in extg walls, drill/ epoxy into extg foundation and connect the top plate to extg 2nd floor framing. no alteration to architectural and aesthetics as all walls will be restored to extg finishes. engineering criteria used a4 | $37,000 | |
| Feb 7, 2001 | Completed final sign-off May 2001 | 1305 18th St | Maap Corp Dba Save Energy Co | replace 40 windows size for size white vinyl visible from the streetDetails
replace 40 windows size for size white vinyl visible from the street | $25,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- W Galdamez Construction (3), Ampex Engineering & Co, D N Construction, Maap Corp Dba Save Energy Co, Macken Construction, Ramirez Roofing Corporation, Safe Assurance Fire Protection
- Architects
- Suheil Shatara (3)
- Engineers
- Fareed Himmati, Muthanna Omran, Suheil Shatara
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.