Muthanna Omran
- Listed as
- architect, attorney, engineer
- Firm
- Muthanna Omran P.E.
- On San Francisco permits
- Mar 2006 to Nov 2020
65 permits since 2000 (engineer on 61 permits, architect on 2 permits, attorney on 2 permits): 59 completed, 2 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 3, 2020 | Completed final sign-off Jun 2021 | 258 Red Rock Wy | Bai Construction | less than 50% repair of front existing wood decks (2)Details
less than 50% repair of front existing wood decks (2) | $20,000 |
| Oct 12, 2018 | Expired or cancelled cancelled Jan 2026 | 2351 Jackson St | revision to permit #201710060660. alternate foundation details.Details
revision to permit #201710060660. alternate foundation details. | ||
| Jun 18, 2018 | Completed final sign-off Jul 2018 | 2360 Filbert St | Bai Construction | revision to app#201408083384. new foundation detail. n/a for maherDetails
revision to app#201408083384. new foundation detail. n/a for maher | |
| Oct 30, 2017 | Completed final sign-off Jan 2020 | 1730 Vallejo St | Bai Construction | mandatory soft story retrofit comply with sfebc , seismic retrofit per 2016 cebc appendix a-4.Details
mandatory soft story retrofit comply with sfebc , seismic retrofit per 2016 cebc appendix a-4. | $70,000 |
| Oct 30, 2017 | Completed final sign-off Sep 2020 | 1441 Montgomery St | Bai Construction | mandatory soft story retrofit comply with sfebc , seismic retrofit per 2016 cebc appendix a-4.Details
mandatory soft story retrofit comply with sfebc , seismic retrofit per 2016 cebc appendix a-4. | $90,000 |
| Oct 6, 2017 | Completed final sign-off May 2019 | 2351 Jackson St | Saarman Construction,Ltd. | soft story retrofit per 2016 sfbc and 2016 cebc appendix a4Details
soft story retrofit per 2016 sfbc and 2016 cebc appendix a4 | $15,000 |
| Oct 6, 2017 | Completed final sign-off Apr 2018 | 395 Euclid Av | Bai Construction | comply with nov 2017788965, repair rear yard retaining wallDetails
comply with nov 2017788965, repair rear yard retaining wall | $45,000 |
| Sep 15, 2017 | Completed final sign-off Jul 2020 | 75 Palm Av | Bai Construction | mandatory soft story retrofit. comply with sfbc 4b seismic retrofit per cebc app a4Details
mandatory soft story retrofit. comply with sfbc 4b seismic retrofit per cebc app a4 | $60,000 |
| Sep 15, 2017 | Completed final sign-off Oct 2020 | 556 Waller St | Bai Construction | madatory soft story retrofit. comply with sfbc 4b seismic retrofit per cebc app a4Details
madatory soft story retrofit. comply with sfbc 4b seismic retrofit per cebc app a4 | $70,000 |
| Sep 15, 2017 | Completed final sign-off Jul 2020 | 1575 Filbert St | Bai Construction | mandatory soft story retrofit. comply with sfbc 4b seismic retrofit per cebc app a4Details
mandatory soft story retrofit. comply with sfbc 4b seismic retrofit per cebc app a4 | $70,000 |
| Sep 14, 2017 | Completed final sign-off Mar 2020 | 505 14th Av | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 | $70,000 | |
| Jul 20, 2017 | Completed final sign-off Dec 2017 | 1987 California St | Bai Construction | (soft story upgrade) revision to pa #201503130798 - change location of shear walls. n/a maher ordinanceDetails
(soft story upgrade) revision to pa #201503130798 - change location of shear walls. n/a maher ordinance | |
| Jun 28, 2017 | Completed final sign-off May 2019 | 601 Potrero Av | Bai Construction | soft story retrofit per sfebc chapter 4d. 2016 cebc appendix a-4 n/a for maherDetails
soft story retrofit per sfebc chapter 4d. 2016 cebc appendix a-4 n/a for maher | $50,000 |
| Jun 9, 2017 | Completed final sign-off Oct 2020 | 628 Capp St | Creatively Built Inc | soft story retrofit of g.f. according to 2016 iebc appx a4Details
soft story retrofit of g.f. according to 2016 iebc appx a4 | $70,000 |
| Jun 9, 2017 | Completed final sign-off Oct 2020 | 626 Capp St | Creatively Built Inc | soft story retrofit of g.f. according to 2016 iebc appx a4Details
soft story retrofit of g.f. according to 2016 iebc appx a4 | $70,000 |
| May 16, 2017 | Completed final sign-off May 2019 | 425 39th Av | Bai Construction | mandatory soft storyDetails
mandatory soft story | $65,000 |
| Apr 12, 2017 | Completed final sign-off Aug 2017 | 2597 Pine St | Sft Construction Corp | revision to app#201511062008, additional foundation detailDetails
revision to app#201511062008, additional foundation detail | $1,000 |
| Mar 22, 2017 | Completed final sign-off Mar 2018 | 1280 38th Av | Bai Construction | mandatory soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4Details
mandatory soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 | $58,000 |
| Feb 3, 2017 | Completed final sign-off Jan 2019 | 201 Moraga St | Bai Construction | soft story retrofit per sfbc per sfbc chapter 34b engineeering criteria: 2012 iebc appendix a-4Details
soft story retrofit per sfbc per sfbc chapter 34b engineeering criteria: 2012 iebc appendix a-4 | $60,000 |
| Dec 16, 2016 | Completed final sign-off Dec 2018 | 3088 21st St | Sft Construction Corp | soft story retrofit of ground floor by upgrading some (e) walls to shear walls, install 1 new footing and ssws. residential portion.Details
soft story retrofit of ground floor by upgrading some (e) walls to shear walls, install 1 new footing and ssws. residential portion. | $50,000 |
| Dec 9, 2016 | Completed final sign-off Jan 2020 | 2240 Bay St | Bai Construction | mandatory soft story retrofit based on 2012 iebc appx a4 and sfbc chapet 34b maher naDetails
mandatory soft story retrofit based on 2012 iebc appx a4 and sfbc chapet 34b maher na | $60,000 |
| Dec 2, 2016 | Completed final sign-off Feb 2018 | 279 03rd Av | Bai Construction | soft story retrofit (ground floor) based on 2013 sfbc & iebc 2012 appendix a4,Details
soft story retrofit (ground floor) based on 2013 sfbc & iebc 2012 appendix a4, | $50,000 |
| Oct 25, 2016 | Completed final sign-off Mar 2018 | 3235 Gough St | Bai Construction | mandatory soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4.Details
mandatory soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. | $100,000 |
| Sep 27, 2016 | Completed final sign-off Feb 2018 | 1825 Pine St | Bai Construction | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 | $60,000 |
| Aug 25, 2016 | Never finaled issued Sep 2016, no final | 3236 Scott St | Barrera & Associates Construction Inc | revision to pa #201604185058 - relocate bathroom on 2nd floor. n/a maher ordinanceDetails
revision to pa #201604185058 - relocate bathroom on 2nd floor. n/a maher ordinance | |
| Aug 25, 2016 | Never finaled issued Sep 2016, no final | 3236 Scott St | Barrera & Associates Construction Inc | revision to pa #201604185056 - infill lightwels in ground floor & change location of ground floors shear wall. n/a maher ordinanceDetails
revision to pa #201604185056 - infill lightwels in ground floor & change location of ground floors shear wall. n/a maher ordinance | $5,000 |
| Apr 19, 2016 | Completed final sign-off Sep 2019 | 2370 Filbert St | Bai Construction | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $75,000 |
| Mar 30, 2016 | Completed final sign-off Oct 2016 | 3590 Sacramento St | Bai Construction | soft story retrofit. comply sfbc 34b mandatory seismic retrofit iebc a4Details
soft story retrofit. comply sfbc 34b mandatory seismic retrofit iebc a4 | $40,000 |
| Mar 8, 2016 | Completed final sign-off Jan 2017 | 2035 15th St | Bai Construction | soft story retrofit of garage floor: upgrade some of the extg walls to shear walls, some foundation is being proposed collectors in 2nd floor framing is also being proposed. n/a for maher. 2012 iebc appendix a-4Details
soft story retrofit of garage floor: upgrade some of the extg walls to shear walls, some foundation is being proposed collectors in 2nd floor framing is also being proposed. n/a for maher. 2012 iebc appendix a-4 | $40,000 |
| Feb 26, 2016 | Completed final sign-off Nov 2017 | 2856 23rd St | Bai Construction | soft storey in basement floor strengthen (e) brick foundation upgrade (e) walls to shear walls, install collectors in 1st floor framing, 2012 iebc appendix a-4Details
soft storey in basement floor strengthen (e) brick foundation upgrade (e) walls to shear walls, install collectors in 1st floor framing, 2012 iebc appendix a-4 | $60,000 |
| Dec 31, 2015 | Completed final sign-off Jul 2020 | 1451 Larkin St | Bai Construction | soft story retrofit per sfbc chapter 34b by sheathing sub-floor cripple walls, adding plywood where needed, 2012 iebc appendix a-4; maher n/aDetails
soft story retrofit per sfbc chapter 34b by sheathing sub-floor cripple walls, adding plywood where needed, 2012 iebc appendix a-4; maher n/a | $15,000 |
| Nov 6, 2015 | Completed final sign-off Dec 2016 | 1556 Filbert St | Bai Construction | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4, upgrading some g/f walls to shear walls and add smf in ground floor.Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4, upgrading some g/f walls to shear walls and add smf in ground floor. | $70,000 |
| Nov 6, 2015 | Completed final sign-off Jan 2018 | 1520 California St | Mulhall Construction Inc. | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4, adding shear walls to ground floor. n/a ordinance #155-13Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4, adding shear walls to ground floor. n/a ordinance #155-13 | $70,000 |
| Nov 6, 2015 | Completed final sign-off Aug 2017 | 2597 Pine St | Sft Construction Corp | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4, upgrading (e) g/f walls to shear walls.Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4, upgrading (e) g/f walls to shear walls. | $60,000 |
| Sep 9, 2015 | Completed final sign-off Sep 2017 | 169 Buena Vista Tr | Sft Construction Corp | soft story retrofit including upgrading some of ground floor walls to shear walls and strengthening the foundation and the framing above.2012 iebc appendix a-4Details
soft story retrofit including upgrading some of ground floor walls to shear walls and strengthening the foundation and the framing above.2012 iebc appendix a-4 | $70,000 |
| Aug 18, 2015 | Completed final sign-off Oct 2015 | 402 Broadway | Bai Construction | #68 & #69- fire damage repair, replace floor sheathing and floor joists to comply with nov #201562741Details
#68 & #69- fire damage repair, replace floor sheathing and floor joists to comply with nov #201562741 | $9,000 |
| Jul 21, 2015 | Completed final sign-off Feb 2016 | 1435 Washington St | Bai Construction | soft story retrofit by adding new foundation and upgrading some of garage's walls to shearwalls. 2012 iebc appendix a-4Details
soft story retrofit by adding new foundation and upgrading some of garage's walls to shearwalls. 2012 iebc appendix a-4 | $60,000 |
| Jun 26, 2015 | Completed final sign-off Jun 2016 | 242 Red Rock Wy | Bai Construction | doing construction in common areas:soft story retrofit of common areas by adding smf and upgrading extg walls to shear walls. 2012 iebc appendix a-4Details
doing construction in common areas:soft story retrofit of common areas by adding smf and upgrading extg walls to shear walls. 2012 iebc appendix a-4 | $30,000 |
| Jun 26, 2015 | Completed final sign-off Jun 2016 | 258 Red Rock Wy | Bai Construction | doing construction in common areas:soft story retrofit of common areas by adding smf and upgrading extg walls to shear walls. 2012 iebc appendix a-4Details
doing construction in common areas:soft story retrofit of common areas by adding smf and upgrading extg walls to shear walls. 2012 iebc appendix a-4 | $30,000 |
| Jun 26, 2015 | Completed final sign-off Jun 2016 | 5 Red Rock Wy | Bai Construction | doing construction in common areas:soft story retrofit of common areas by adding smf and upgrading extg walls to shear walls. 2012 iebc appendix a-4Details
doing construction in common areas:soft story retrofit of common areas by adding smf and upgrading extg walls to shear walls. 2012 iebc appendix a-4 | $20,000 |
| Jun 5, 2015 | Completed final sign-off Jul 2017 | 5122 Diamond Heights Bl | Bai Construction | soft story retrofit of garage floor per sfbc chapter 34b, 2012 iebc appendix a-4Details
soft story retrofit of garage floor per sfbc chapter 34b, 2012 iebc appendix a-4 | $45,000 |
| Jun 2, 2015 | Completed final sign-off Feb 2017 | 5094 Diamond Heights Bl | Bai Construction | soft story retrofit by adding 6 new smf and upgrading garage walls to shear wallsDetails
soft story retrofit by adding 6 new smf and upgrading garage walls to shear walls | $110,000 |
| Jun 2, 2015 | Completed final sign-off May 2017 | 5110 Diamond Heights Bl | soft story retrofit by adding 6 new smf and upgrading garage walls to shear walls. per 2012 iebc appendix a-4.Details
soft story retrofit by adding 6 new smf and upgrading garage walls to shear walls. per 2012 iebc appendix a-4. | $110,000 | |
| Mar 23, 2015 | Completed final sign-off Sep 2016 | 395 Euclid Av | Bai Construction | soft story retrofit per sfbc chapter 34bDetails
soft story retrofit per sfbc chapter 34b | $50,000 |
| Mar 16, 2015 | Completed final sign-off Dec 2017 | 1304 18th St | Bai Construction | soft story retrofit per sfbc chapter 34b: 2012 iebc appendix a-4 @ bsmt.Details
soft story retrofit per sfbc chapter 34b: 2012 iebc appendix a-4 @ bsmt. | $50,000 |
| Mar 13, 2015 | Completed final sign-off Dec 2017 | 1987 California St | Bai Construction | soft story retrofit by adding new ssws with foundation strenghthening. 2012 iebc appenx a-4. n/a maher ordinanceDetails
soft story retrofit by adding new ssws with foundation strenghthening. 2012 iebc appenx a-4. n/a maher ordinance | $70,000 |
| Feb 24, 2015 | Completed final sign-off Mar 2016 | 1648 Filbert St | Bai Construction | soft story retrofit including upgrading (e) walls to shearwalls. install 8 (n) ssws and install 3 (n) smf w/their framing. design criteria iebc appendix a4.Details
soft story retrofit including upgrading (e) walls to shearwalls. install 8 (n) ssws and install 3 (n) smf w/their framing. design criteria iebc appendix a4. | $55,000 |
| Jan 12, 2015 | Completed final sign-off Feb 2015 | 2660 Webster St | Bai Construction | revision to pa #2014.0516.5994 - (n) 5/8" dia drill/bond ab & (n) footing.Details
revision to pa #2014.0516.5994 - (n) 5/8" dia drill/bond ab & (n) footing. | |
| Jan 12, 2015 | Completed final sign-off Nov 2015 | 1901 Webster St | Bai Construction | soft story retrofit; upgrade (e) walls to shear walls add anchor bolts, hd anchors, plywd sheating & collectors; chapter 34b-2012 iebc appendix a-4Details
soft story retrofit; upgrade (e) walls to shear walls add anchor bolts, hd anchors, plywd sheating & collectors; chapter 34b-2012 iebc appendix a-4 | $40,000 |
| Dec 23, 2014 | Completed final sign-off May 2015 | 2200 Francisco St | Bai Construction | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. upgrade after oms[ectopms (e) shear walls in the g/f. add holdowns & anchor bolts. n/a ordinance #155-13.Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. upgrade after oms[ectopms (e) shear walls in the g/f. add holdowns & anchor bolts. n/a ordinance #155-13. | $20,000 |
| Dec 16, 2014 | Expired or cancelled expired Apr 2021 | 861 Fell St | Perfect Bldr. Inc/Dba: Bldg. Solutions | soft story retrofit per sfbc chapter 34b by upgrading (e) gf walls to shearwalls & foundation strengthening with jrc jackets. 2012 iebc appendix a-4.Details
soft story retrofit per sfbc chapter 34b by upgrading (e) gf walls to shearwalls & foundation strengthening with jrc jackets. 2012 iebc appendix a-4. | $60,000 |
| Dec 1, 2014 | Completed final sign-off Mar 2015 | 1338 Stevenson St | Bai Construction | soft story retrofit by upgrading ground floor walls to shear walls. add plywood sheething, anchor bolts and hd anchors. comply with sfbc 2012 iebc appendizx a-4.Details
soft story retrofit by upgrading ground floor walls to shear walls. add plywood sheething, anchor bolts and hd anchors. comply with sfbc 2012 iebc appendizx a-4. | $40,000 |
| Sep 23, 2014 | Completed final sign-off May 2015 | 1695 Filbert St | Bai Construction | soft story retrofit (per iebc a4) by upgradeing e walls to shear wall, total 11Details
soft story retrofit (per iebc a4) by upgradeing e walls to shear wall, total 11 | $35,000 |
| Aug 20, 2014 | Completed final sign-off Dec 2014 | 7829 Geary Bl | Bai Construction | soft story retrofit by installing new steel shear walls and upgrade some extg walls to shear walls. 2012 iebc appendix a-4Details
soft story retrofit by installing new steel shear walls and upgrade some extg walls to shear walls. 2012 iebc appendix a-4 | $40,000 |
| Aug 15, 2014 | Completed final sign-off Dec 2014 | 1295 47th Av | Bai Construction | soft story retrofit by installing new garage portal upgrade extg walls to shear walls. 2012 iebcDetails
soft story retrofit by installing new garage portal upgrade extg walls to shear walls. 2012 iebc | $40,000 |
| Aug 11, 2014 | Completed final sign-off Oct 2014 | 160 Lansdale Av | Bai Construction | repair at rear deck by contructing 5 new 16" piers 15' deep, (n) grade beams, columns & floor beam. existing decking & joists and railing to remain.Details
repair at rear deck by contructing 5 new 16" piers 15' deep, (n) grade beams, columns & floor beam. existing decking & joists and railing to remain. | $40,000 |
| Aug 8, 2014 | Completed final sign-off May 2019 | 1045 Leavenworth St | Bai Construction | soft story retrofit per sfbc chapter 34b - upgrade extg walls to shear walls. 2012 i e b c appendix a-4. n/a for the maher ordinanace #155-13Details
soft story retrofit per sfbc chapter 34b - upgrade extg walls to shear walls. 2012 i e b c appendix a-4. n/a for the maher ordinanace #155-13 | $50,000 |
| Aug 8, 2014 | Completed final sign-off Jul 2018 | 2360 Filbert St | Bai Construction | soft story retrofit per csfbc chapter 34b - upgrade extg walls to shear walls. 2012 i e b c appendix a-4. n/a for the maher ordinanace #155-13Details
soft story retrofit per csfbc chapter 34b - upgrade extg walls to shear walls. 2012 i e b c appendix a-4. n/a for the maher ordinanace #155-13 | $50,000 |
| Jun 25, 2014 | Completed final sign-off Oct 2014 | 545 Burnett Av | Bai Construction | soft story retrofit. installing 10 sheel strong walls in the basement and garage floor. asce 41.06Details
soft story retrofit. installing 10 sheel strong walls in the basement and garage floor. asce 41.06 | $40,000 |
| May 30, 2014 | Expired or cancelled expired Dec 2016 | 1040 Mason St | Bai Construction | soft story retrofit to include upgrade gf walls to sheer walls and add collectors in the short direction of 2nd floor diaphragm. compliance with ordinance no. 155-13 not required.Details
soft story retrofit to include upgrade gf walls to sheer walls and add collectors in the short direction of 2nd floor diaphragm. compliance with ordinance no. 155-13 not required. | $45,000 |
| Apr 29, 2014 | Completed final sign-off Oct 2016 | 1301 18th St | soft story retrofit by inserting 12 steel strong walls in extg walls, drill/ epoxy into extg foundation and connect the top plate to extg 2nd floor framing. no alteration to architectural and aesthetics as all walls will be restored to extg finishes. engineering criteria used a4Details
soft story retrofit by inserting 12 steel strong walls in extg walls, drill/ epoxy into extg foundation and connect the top plate to extg 2nd floor framing. no alteration to architectural and aesthetics as all walls will be restored to extg finishes. engineering criteria used a4 | $37,000 | |
| Apr 11, 2014 | Completed final sign-off Jan 2015 | 320 Pennsylvania Av | soft story retrofit of the ground floor. using garage portals of steel strong wall, 2 per frame to a total of 4 frames. engineering per sfbc 34b/a4.Details
soft story retrofit of the ground floor. using garage portals of steel strong wall, 2 per frame to a total of 4 frames. engineering per sfbc 34b/a4. | $30,000 | |
| Apr 11, 2014 | Expired or cancelled cancelled Feb 2025 | 1525 Sutter St | soft story retrofit of ground floor with 14 new steel strong walls forming 7 portal frames. as engineering per sfbc 34b / a4Details
soft story retrofit of ground floor with 14 new steel strong walls forming 7 portal frames. as engineering per sfbc 34b / a4 | $50,000 | |
| Mar 28, 2006 | Completed final sign-off Oct 2007 | 750 Columbus Av | Ccr Builders Inc.**See Note*** | install new microcell panel antenna enclosed within new pedestal, built to match existing, install of associated equipment, cabling and cable trays. complaint #200557747.Details
install new microcell panel antenna enclosed within new pedestal, built to match existing, install of associated equipment, cabling and cable trays. complaint #200557747. | $25,000 |
| Mar 27, 2006 | Completed final sign-off Sep 2007 | 590 Bosworth St | Ccr Builders Inc.**See Note*** | install a new microcellular panel antenna mounted on corner of (e) roof access. install associated equipment, cabling and cable trays.Details
install a new microcellular panel antenna mounted on corner of (e) roof access. install associated equipment, cabling and cable trays. | $25,000 |