Block 1040, lot 014
75 Palm Ave
- City’s use
- Multi-Family Residential
- Built
- 1915
- Stories
- 2
- Units
- 5
- Rooms
- 6 bathrooms
- Building
- 4,958 sq ft
- Lot
- 4,795 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 6, 2021 | Completed final sign-off Jun 2022 | 75 Palm Av | Commercial Fire Protection Inc | install low frequency sounders to meet 75db at the pillow per sffc section 1103.7.6.1 and replace the existing fire alarm control panel.Details
install low frequency sounders to meet 75db at the pillow per sffc section 1103.7.6.1 and replace the existing fire alarm control panel. | $17,580 |
| May 22, 2020 | Never finaled issued May 2020, no final | 75 Palm Av | street spaceDetails
street space | ||
| Mar 2, 2020 | Never finaled issued Mar 2020, no final | 75 Palm Av | street spaceDetails
street space | ||
| Feb 20, 2020 | Never finaled issued Feb 2020, no final | 75 Palm Av | street spaceDetails
street space | ||
| Sep 15, 2017 | Completed final sign-off Jul 2020 | 75 Palm Av | Bai Construction | mandatory soft story retrofit. comply with sfbc 4b seismic retrofit per cebc app a4Details
mandatory soft story retrofit. comply with sfbc 4b seismic retrofit per cebc app a4 | $60,000 |
| Jul 17, 2017 | Completed final sign-off Jul 2017 | 75 Palm Av | Sequoia Construction Services Inc | repair parapet wall membrane, drain and pipe flasahngs, all metal counter flashing and vents, repair/replace roofing and clean pump house new parapet coping metal. same stucco work at parapet and awall base. in the same locationDetails
repair parapet wall membrane, drain and pipe flasahngs, all metal counter flashing and vents, repair/replace roofing and clean pump house new parapet coping metal. same stucco work at parapet and awall base. in the same location | $26,815 |
| Apr 26, 2016 | Completed final sign-off Jul 2016 | 75 Palm Av | Make Ready Maintenance Inc | unit 3: kitchen and bathr remodel, add 1 bath; no exterior workDetails
unit 3: kitchen and bathr remodel, add 1 bath; no exterior work | $27,000 |
| Mar 3, 2011 | Never finaled issued Mar 2011, no final | 75 Palm Av | street space permitDetails
street space permit | ||
| Dec 1, 2010 | Completed final sign-off May 2011 | 75 Palm Av | Teevan Company | dryrot repair of wood framing on the north and south walls of existing structure. replace e stucco in kind at repair areasDetails
dryrot repair of wood framing on the north and south walls of existing structure. replace e stucco in kind at repair areas | $60,000 |
| Nov 9, 2010 | Never finaled issued Nov 2010, no final | 75 Palm Av | street spaceDetails
street space | ||
| Sep 2, 2010 | Never finaled issued Sep 2010, no final | 75 Palm Av | street space for scaffoldDetails
street space for scaffold | ||
| Dec 24, 2009 | Never finaled issued Dec 2009, no final | 75 Palm Av | street space and sidewalk permits (ref pw20091224931)Details
street space and sidewalk permits (ref pw20091224931) |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bai Construction, Commercial Fire Protection Inc, Make Ready Maintenance Inc, Sequoia Construction Services Inc, Teevan Company
- Architects
- Terryl Lofrano
- Engineers
- Muthanna Omran
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.