Back to kitchen remodel contractors
Freemodel Inc.
- Based in
- Burlingame
- On San Francisco permits
- Jul 2021 to Sep 2026
- Last 24 months
- 8 permits filed
43 permits since 2000: 40 completed, 2 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
21 kitchen remodel permits: 20 completed, 1 in progress. Typically 0 days from filing to permit and 134 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 9, 2026 | In progress issued Sep 2026 | 1805 Fillmore St | unit# 301: kitchen remodel in kind. new cabinets and plumbing fixtures. two full bathroom remodel in kind with bathtub.Details
unit# 301: kitchen remodel in kind. new cabinets and plumbing fixtures. two full bathroom remodel in kind with bathtub. | $60,000 |
| Oct 3, 2025 | Completed final sign-off Jan 2026 | 69 Lisbon St | full bathroom remodel in kind with bathtub. full kitchen remodel with layout changes. addition of half bath in new location on 2nd floor.Details
full bathroom remodel in kind with bathtub. full kitchen remodel with layout changes. addition of half bath in new location on 2nd floor. | $60,000 |
| Mar 13, 2025 | Completed final sign-off Jun 2025 | 50 Walter St | unit a: remodel kitchen in kind. replace vanity in bath onlyDetails
unit a: remodel kitchen in kind. replace vanity in bath only | $40,000 |
| Jul 11, 2024 | Completed final sign-off Sep 2024 | 2350 27th Av | remodel kitchen and (2) baths. replace toilet and naity only (no tile/tub/shower) no structuralDetails
remodel kitchen and (2) baths. replace toilet and naity only (no tile/tub/shower) no structural | $44,000 |
| May 13, 2024 | Completed final sign-off Oct 2024 | 60 Hiliritas Av | 1st fl full bath remodel, lower portion of existing framing to match same level as rest of the floor, add wet bar. (ref:2nd fl remodel layout, bath remodel under 202403117552). (ref:3rd fl remodel layout, kitchen and bath remodel under 202403117552), 4th fl relocate washerDetails
1st fl full bath remodel, lower portion of existing framing to match same level as rest of the floor, add wet bar. (ref:2nd fl remodel layout, bath remodel under 202403117552). (ref:3rd fl remodel layout, kitchen and bath remodel under 202403117552), 4th fl relocate washer | $50,000 |
| Apr 30, 2024 | Completed final sign-off Sep 2024 | 3300 Baker St | update all wiring from knob and tube to romex wire (electrical): update all breakers to afci/ gfci 9electrical): replacing drywall in open area's from updating electrical (building) replacing kitchen countertop w/sink (building/plumbing)Details
update all wiring from knob and tube to romex wire (electrical): update all breakers to afci/ gfci 9electrical): replacing drywall in open area's from updating electrical (building) replacing kitchen countertop w/sink (building/plumbing) | $8,000 |
| Apr 26, 2024 | Completed final sign-off Jul 2024 | 159 Faith St | kitchen and bathroom remodel in kind, plumbing fixtures to be installed in (e) location. kit= replace 3 cabs + (n) countertops only. bath = new vanity, toilet + tile floor only. roof repair of dryrot substrate only (reroofing permit to be pulled by roofing contractor).Details
kitchen and bathroom remodel in kind, plumbing fixtures to be installed in (e) location. kit= replace 3 cabs + (n) countertops only. bath = new vanity, toilet + tile floor only. roof repair of dryrot substrate only (reroofing permit to be pulled by roofing contractor). | $8,000 |
| Mar 26, 2024 | Completed final sign-off Jan 2025 | 256 Collingwood St | one kitchen: replace cabinets, counters, tiles, etc. in kind. one bathroom remodel: replace tub, vanity, toilet, tiles, etc. in kind. upper right unit.Details
one kitchen: replace cabinets, counters, tiles, etc. in kind. one bathroom remodel: replace tub, vanity, toilet, tiles, etc. in kind. upper right unit. | $55,000 |
| Mar 11, 2024 | Completed final sign-off Oct 2024 | 60 Hiliritas Av | remodel kitchen and 4 bathrooms. no structural, 2 of the bathrooms are fixtures and floor tile 0nly.Details
remodel kitchen and 4 bathrooms. no structural, 2 of the bathrooms are fixtures and floor tile 0nly. | $65,000 |
| Jan 31, 2024 | Completed final sign-off Jun 2024 | 2990 25th St | replaceing (e) kitchen cabinets, no layout changes, like for like replace vanity, same size, same location, upgrade faucets hallway bathroom primary bathroom: replace vainty same size, upgrade faucets, tile the batahtub, keeping original bathtub, no plumbing or elec changes. no wall alteration.Details
replaceing (e) kitchen cabinets, no layout changes, like for like replace vanity, same size, same location, upgrade faucets hallway bathroom primary bathroom: replace vainty same size, upgrade faucets, tile the batahtub, keeping original bathtub, no plumbing or elec changes. no wall alteration. | $12,000 |
| Oct 10, 2023 | Completed final sign-off Mar 2024 | 146 Peralta Av | remodel kitchen & bath, same layout, no structural, no removal of wallsDetails
remodel kitchen & bath, same layout, no structural, no removal of walls | $35,000 |
| Aug 14, 2023 | Completed final sign-off Sep 2023 | 263 16th Av | revision to pa202209162643. moving kitchen sink location. moving microwave location. converting double vanity to single. engineering revision (minor).Details
revision to pa202209162643. moving kitchen sink location. moving microwave location. converting double vanity to single. engineering revision (minor). | |
| Jul 24, 2023 | Completed final sign-off Oct 2023 | 407 Sawyer St | in-kind remodeling of 1 kitchen(s) in 2nd flDetails
in-kind remodeling of 1 kitchen(s) in 2nd fl | $11,000 |
| Jul 6, 2023 | Completed final sign-off Sep 2024 | 673 Andover St | kitchen remodel, down stairs bathroom remodel adding interior stairs, relocate bathroom and convert recreation room to master bedroom on 1st fl. new interior stairs, remodel kitchen and two bath rooms, repair rear decks-less than 50%Details
kitchen remodel, down stairs bathroom remodel adding interior stairs, relocate bathroom and convert recreation room to master bedroom on 1st fl. new interior stairs, remodel kitchen and two bath rooms, repair rear decks-less than 50% | $50,000 |
| Jun 14, 2023 | Completed final sign-off Feb 2024 | 2015 Castro St | remove & replace kitchen cabinets & appliances (3rd floor). remove & replace garage door. paint building exterior. remove & replace front entry door.Details
remove & replace kitchen cabinets & appliances (3rd floor). remove & replace garage door. paint building exterior. remove & replace front entry door. | $30,000 |
| Mar 2, 2023 | Completed final sign-off Mar 2023 | 490 33rd Av | to comply w/ complaint: 202303422: kitchen: new countertop and flooringDetails
to comply w/ complaint: 202303422: kitchen: new countertop and flooring | $5,500 |
| Feb 2, 2023 | Completed final sign-off Sep 2023 | 263 16th Av | revision to no plan pa# 202209162643. moving wall 6" and adding toilet to bathroom. expanding w.c. into bedroom closet to add bathtub + sink. powder room moving sink, replacing toilet. kitchen taking down wall between kitchen & dining. full kitchen remodel.Details
revision to no plan pa# 202209162643. moving wall 6" and adding toilet to bathroom. expanding w.c. into bedroom closet to add bathtub + sink. powder room moving sink, replacing toilet. kitchen taking down wall between kitchen & dining. full kitchen remodel. | |
| Jan 17, 2023 | Completed final sign-off Apr 2023 | 849 Noe St | unit #2: kitchen and bathroom remodel, replace electrical subpanel with circuits for new appliances replace electrical outlets, add recessed ligths ledDetails
unit #2: kitchen and bathroom remodel, replace electrical subpanel with circuits for new appliances replace electrical outlets, add recessed ligths led | $70,000 |
| Sep 16, 2022 | Completed final sign-off Sep 2023 | 263 16th Av | demo of 2/f level kitchen in full, and demo (3) bathrooms in full, no change in wall locations. repace kitchen and 3 bathrooms in kind no change in floor plans or wallsDetails
demo of 2/f level kitchen in full, and demo (3) bathrooms in full, no change in wall locations. repace kitchen and 3 bathrooms in kind no change in floor plans or walls | $15,000 |
| Jul 26, 2022 | Completed final sign-off Oct 2022 | 849 Noe St | unit #6 : in place kitchen and bathroom remodel- replace electrical subpanel with circuits for new appliances, replace elecrical outlets, add led recessed lights, repair in wall heater.Details
unit #6 : in place kitchen and bathroom remodel- replace electrical subpanel with circuits for new appliances, replace elecrical outlets, add led recessed lights, repair in wall heater. | $70,000 |
| Apr 1, 2022 | Completed final sign-off Sep 2022 | 849 Noe St | unit #1,3,4,5: in place kitchen and bathroom remodel-exhaust fan, replace electricl subpanel with circuts for new appliance replace elecrical outlets, replace buildng intercom, add recessed lights- all led with sensors.Details
unit #1,3,4,5: in place kitchen and bathroom remodel-exhaust fan, replace electricl subpanel with circuts for new appliance replace elecrical outlets, replace buildng intercom, add recessed lights- all led with sensors. | $325,000 |