Back to bathroom remodel contractors
Freemodel Inc.
- Based in
- Burlingame
- On San Francisco permits
- Jul 2021 to Sep 2026
- Last 24 months
- 8 permits filed
43 permits since 2000: 40 completed, 2 in progress, 1 never finaled.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
Bathroom remodel permits
25 bathroom remodel permits: 23 completed, 2 in progress. Typically 0 days from filing to permit and 117 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 9, 2026 | In progress | 1805 Fillmore St | unit# 301: kitchen remodel in kind. new cabinets and plumbing fixtures. two full bathroom remodel in kind with bathtub. | $60,000 |
| Aug 24, 2026 | In progress | 1333 Jones St | 11/f unit:#1105 full interior remodel of existing primary bathroom and partial remodel of existing guest bathroom within an existing residential condominium unit | $78,000 |
| Jan 9, 2026 | Completed | 291 Capistrano Av | ground floor remodel to include new full bath, laundry, and storage room, 450 sq ft | $60,000 |
| Oct 3, 2025 | Completed | 69 Lisbon St | full bathroom remodel in kind with bathtub. full kitchen remodel with layout changes. addition of half bath in new location on 2nd floor. | $60,000 |
| Mar 13, 2025 | Completed | 50 Walter St | unit a: remodel kitchen in kind. replace vanity in bath only | $40,000 |
| Oct 10, 2024 | Completed | 1907 Leavenworth St | unit 9: bath remodel limited to replacing bathtub/showr to stand walk in shower.add 1 electrical outlet at toilet | $2,000 |
| Jul 11, 2024 | Completed | 2350 27th Av | remodel kitchen and (2) baths. replace toilet and naity only (no tile/tub/shower) no structural | $44,000 |
| Jun 10, 2024 | Completed | 290 Cambridge St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $18,000 |
| May 13, 2024 | Completed | 60 Hiliritas Av | 1st fl full bath remodel, lower portion of existing framing to match same level as rest of the floor, add wet bar. (ref:2nd fl remodel layout, bath remodel under 202403117552). (ref:3rd fl remodel layout, kitchen and bath remodel under 202403117552), 4th fl relocate washer | $50,000 |
| Apr 26, 2024 | Completed | 159 Faith St | kitchen and bathroom remodel in kind, plumbing fixtures to be installed in (e) location. kit= replace 3 cabs + (n) countertops only. bath = new vanity, toilet + tile floor only. roof repair of dryrot substrate only (reroofing permit to be pulled by roofing contractor). | $8,000 |
| Mar 26, 2024 | Completed | 256 Collingwood St | one kitchen: replace cabinets, counters, tiles, etc. in kind. one bathroom remodel: replace tub, vanity, toilet, tiles, etc. in kind. upper right unit. | $55,000 |
| Mar 11, 2024 | Completed | 60 Hiliritas Av | remodel kitchen and 4 bathrooms. no structural, 2 of the bathrooms are fixtures and floor tile 0nly. | $65,000 |
| Jan 31, 2024 | Completed | 2990 25th St | replaceing (e) kitchen cabinets, no layout changes, like for like replace vanity, same size, same location, upgrade faucets hallway bathroom primary bathroom: replace vainty same size, upgrade faucets, tile the batahtub, keeping original bathtub, no plumbing or elec changes. no wall alteration. | $12,000 |
| Oct 27, 2023 | Completed | 7 Nebraska St | (2) in kind bathroom remodels - in kind replacement of valve, toilet, shower head and sink. change outlets, switches, and light fixtures. recessed lighting installation (2) rooms. primary bathroom and 1st floor room. total (2) bathrooms. | $15,000 |
| Oct 10, 2023 | Completed | 146 Peralta Av | remodel kitchen & bath, same layout, no structural, no removal of walls | $35,000 |
| Jul 6, 2023 | Completed | 673 Andover St | kitchen remodel, down stairs bathroom remodel adding interior stairs, relocate bathroom and convert recreation room to master bedroom on 1st fl. new interior stairs, remodel kitchen and two bath rooms, repair rear decks-less than 50% | $50,000 |
| Jun 25, 2023 | Completed | 407 Sawyer St | in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 2 shower pan(s). | $24,750 |
| Feb 2, 2023 | Completed | 263 16th Av | revision to no plan pa# 202209162643. moving wall 6" and adding toilet to bathroom. expanding w.c. into bedroom closet to add bathtub + sink. powder room moving sink, replacing toilet. kitchen taking down wall between kitchen & dining. full kitchen remodel. | |
| Jan 31, 2023 | Completed | 2485 Union St | 1st fl, unit 1 -bathroom remodel & closet conversion to laundry space; sf of project 140. not moving (e) walls; all fixtures ins (e) bathroom are staying in smae location except removing (e) bathtub & replacing shower w/curbed shower pan; relocating shower plumbing to adjacent wall; in-kind sink/ | $30,000 |
| Jan 17, 2023 | Completed | 849 Noe St | unit #2: kitchen and bathroom remodel, replace electrical subpanel with circuits for new appliances replace electrical outlets, add recessed ligths led | $70,000 |
| Sep 16, 2022 | Completed | 263 16th Av | demo of 2/f level kitchen in full, and demo (3) bathrooms in full, no change in wall locations. repace kitchen and 3 bathrooms in kind no change in floor plans or walls | $15,000 |
| Jul 26, 2022 | Completed | 849 Noe St | unit #6 : in place kitchen and bathroom remodel- replace electrical subpanel with circuits for new appliances, replace elecrical outlets, add led recessed lights, repair in wall heater. | $70,000 |
| Apr 26, 2022 | Completed | 3988 20th St | remodel existing primary bathroom (1) with new fixtures, tile, lighting, cabinetry - no structural work. dry rot repair wood siding at rear and sides to match existing. replace in kind (3) windows at rear - not visible from street. dual glazed fiberglass/wood. u 0.3 max. | $42,000 |
| Apr 1, 2022 | Completed | 849 Noe St | unit #1,3,4,5: in place kitchen and bathroom remodel-exhaust fan, replace electricl subpanel with circuts for new appliance replace elecrical outlets, replace buildng intercom, add recessed lights- all led with sensors. | $325,000 |
| Jul 1, 2021 | Completed | 224 Lexington St | bathroom: replace exh fan with humidstat & switch; replace vanity, led lights; replace faucet forshower; install new tub; intsall new sink and vanity; upgrade toilet; remove tile. install new tile, but pony wall (like for like). | $10,000 |