Back to kitchen remodel contractors
Mrcc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2003 to Aug 2026
- Last 24 months
- 13 permits filed
103 permits since 2000: 73 completed, 7 in progress, 15 never finaled, 8 expired or cancelled.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
Kitchen remodel permits
25 kitchen remodel permits: 24 completed, 1 in progress. Typically 7 days from filing to permit and 170 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 19, 2026 | In progress | 2949 Octavia St | interior remodel of 2nd & 3rd flrs duplex in area of kitchen. new tankless water heaters to be located in garage. no changes visible from street. | $80,000 |
| Mar 20, 2025 | Completed | 301 Mission St | replace (e) kitchen cabinets & appliances, (n) countertop & overhead lights, electrical upgrades for appliances; remove and replace flooring, shower and tub, new vanity counter, new overhead lights, 2 new plugs for medicine cabinets. no wall demolition or construction, no change to ceiling framing. | $250,000 |
| Feb 26, 2025 | Completed | 166 Hartford St | new skylight @ main level existing parlor. replace kitchen windows, replace exterior door, new kitchen exhauset hood, (n) washer & dryer.not visible from street | $75,000 |
| Jul 16, 2024 | Completed | 743 Filbert St | remodel existing kitchen and bathroom. add new bathroom - new plumbing req'd and electrical. no exterior work. | $80,000 |
| Feb 21, 2024 | Completed | 410 30th St | remodel of (e) kitchen, new window and door, new electrical. remodel (2) bathrooms with new electrical and plumbing. | $110,000 |
| Jun 29, 2023 | Completed | 73 Dellbrook Av | 1st fl. remodel garage to include additon of bedroom and bathroom, replace sliding door 2nd fl. remodel (e) kitchen and bathrooms new elce ad plumbing in area of remodels structural upgrades as required for remodel | $250,000 |
| Feb 24, 2023 | Completed | 999 Green St | #1704: new kitchen cabinets at kitchen/breakfast area. partially demolish existing non-load bearing interior partition at kitchen, reconfigure closets at primary suite (non-load bearing partition walls), new range ventilation at kitchen (recirc.). | $75,000 |
| Sep 15, 2022 | Completed | 426 Eureka St | kitchen remodel: new electrical, relocated plumbing, new insulation & sheetrock, new cabinets and tile. one nnew window replaced in wood on an interval staircase. remodel upstairs bar area- relocate ar sink, new lower cabinets, 1 new window relacement on interval stair area. no removal of walls | $40,000 |
| Apr 8, 2021 | Completed | 2010 Eddy St | apt b(2nd flr) - kitchen & bthroom remodel. all (n) plumbing & (n) appliance at (e) location, no change to interior walls, (n) high efficiency lighting. | $45,000 |
| Apr 6, 2021 | Completed | 164 Hartford St | kitchen renovation. remove non structural wall. replace fixtures and finishes. | $50,000 |
| Jul 6, 2020 | Completed | 2040 Laguna St | (n) bathroom remodel (to the studs). kitchen remodel, plumbing fixture locations to remain. (n) sheetrock, insulation, cabinets, tile, counter tops, paint | $45,000 |
| May 6, 2019 | Completed | 2214 Pine St | replace kitchen cabinets/finishes; demo/replace bath #1 and finishes; demo/replace bath #2 and finises/ add laundry where closet is currently. no structural work, no framing/modification. | $100,000 |
| Apr 26, 2019 | Completed | 1220 18th St | unit 1220, 1st flr. relocate kitchen, install (n) laundry and pantry, (n) sink at (e) powder room. units 1220 & 1222: renovation of (e) baths at 1st and 2nd flr. | $45,000 |
| Apr 18, 2019 | Completed | 136 Randall St | kitchen remodel. relocate (e) half bath. remodel of (e) shed to sunroom with new door & windows. sunroom is uncondititioned space. | $36,837 |
| Jan 18, 2019 | Completed | 2040 Laguna St | kitchen and bathroom remodel. bathroom-new cabinets, countertops, appliances, 6'x5'. bathroom-demo to the studs, new tiles, fixtures, electrical., 5'x5'. misc: new flooring and paint. maher n/a | $50,000 |
| Mar 6, 2018 | Completed | 2212 Pine St | lighting per cenc 150.0(k) unit demolished to the studs. there are 2 bedrooms, one kitchen, one bath. all finishes to be replace in kind. lower unit, behind entrance stairs. all (e) walls to remain | $225,000 |
| Sep 27, 2017 | Completed | 999 Green St | new kitchen cabinetry, appliances, & lighting, new unit entry door, replacement of extg windows in kind, new plmg fixtures(no change in location/quantity). new interior finishes. new windows 136 sq. ft. | $60,000 |
| Jun 14, 2017 | Completed | 40 Collingwood St | interior remodel of kitchen and bath with new powder room. new electrical and plumbing in remodeled area. removal of extg brick flue and raising extg beam up into attic space. new awning window at back of house. replace in kind exterior door at rear. maher ord 155-13 na | $85,000 |
| Sep 1, 2015 | Completed | 1069 Pennsylvania Av | scope of work: to include new hvac systems. kitchen hood exhaust and make up air systems. plumbing and electrical for renovations. n/a for maher. | $180,000 |
| Aug 4, 2015 | Completed | 1069 Pennsylvania Av | interior t.i. of extg warehouse space into a commercial kitchen: new kitchen and equipment layout, 2 new stairs to replace extg, new ada lift and new accessible restrooms. mep referred under seperate permit. n/a for maher. | $230,000 |
| Jan 23, 2014 | Completed | 359 San Benito Wy | remodel to kitchen & two bathrooms, no expansion of (e) envelope. several windows to be replaced at sides & rear of house in-kind wood windows. new heating system to be installed & some new electrical updates. general dryrot repair. | $135,000 |
| Nov 27, 2013 | Completed | 4408 17th St | lower unit - to remove cabinets (partial), remove (e) sheetrocks in kitchen / dining room; install insulation and acoustica sheetrock with rc channels; re-instate fire rated ceiling; to comply with cec150(k) 8 | $10,000 |
| Nov 8, 2012 | Completed | 52 07th Av | kitchen remodel, remodel of (2) bathrooms, relocate laundry, minor electrical (interior work only). | $70,000 |
| Apr 27, 2012 | Completed | 36 Hartford St | replace half of the kitchen cabinetry in kind. adding 2 under cabinet lights and electrical to future warning drawer | $12,000 |
| Jan 26, 2010 | Completed | 2445 Ulloa St | downstairs (e) bathroom remodel, upstairs (e) kitchen remodel. no added sqft. no increase to bldg enevelope. window replacement under separate permit | $40,000 |