Kitchen remodel contractors in San Francisco
8,256 contractors have filed kitchen remodel permits in San Francisco since 2000. By permit record, the leaders are among those with at least 10 permits: Camp Roofing Ltd Dba Camp Construction (363 of 423 completed), Valex Construction (50 of 51 completed) and Sean M O'reilly (47 of 47 completed).
Ranked across every kitchen remodel permit filed since 2000, by the share that reached final inspection, adjusted so a long clean record outranks a short one. Of the kitchen remodel contractors, the 2,000 that lead on this sort were read; the rest are not in this list. Showing contractors with a kitchen remodel permit in the last 5 years. Include inactive contractors
- 1Camp Roofing Ltd Dba Camp ConstructionLicense 1088923 423 permits: 363 completed, 54 in progress, 4 never finaled, 2 expired or cancelled. Last filed Sep 2026. Typically 70 days from permit to final inspection. Never finaled: 4 are 3 to 5 years old.
- 2Valex ConstructionLicense 809059 51 permits: 50 completed, 1 in progress. Last filed Jul 2026. Typically 128 days from permit to final inspection.
- 3Sean M O'reillyLicense 812877 47 permits: 47 completed. Last filed May 2026. Typically 77 days from permit to final inspection.
- 4Brady ConstructionLicense 539362 94 permits: 92 completed, 1 never finaled, 1 expired or cancelled. Last filed May 2026. Typically 83 days from permit to final inspection. Never finaled: 1 is over 10 years old.
- 5He & Kuang IncLicense 892144 43 permits: 39 completed, 4 in progress. Last filed Jul 2026. Typically 221 days from permit to final inspection.
- 6Yiu's Construction CoLicense 802681 127 permits: 123 completed, 4 never finaled. Last filed Jul 2026. Typically 83 days from permit to final inspection. Never finaled: 3 are 5 to 10 years old, 1 is over 10 years old.
- 7Sure, Inc.License 561658 727 permits: 678 completed, 8 in progress, 23 never finaled, 18 expired or cancelled. Last filed Aug 2026. Typically 92 days from permit to final inspection. Never finaled: 1 is 3 to 5 years old, 16 are 5 to 10 years old, 6 are over 10 years old.
- 8B R S ConstructionLicense 896799 32 permits: 32 completed. Last filed Jan 2024. Typically 86 days from permit to final inspection.
- 9Caruso Construction Inc.License 710510 53 permits: 51 completed, 1 in progress, 1 expired or cancelled. Last filed Dec 2025. Typically 255 days from permit to final inspection.
- 10Jason Liu Construction CompanyLicense 662067 30 permits: 30 completed. Last filed Sep 2022. Typically 246 days from permit to final inspection.
- 11North Bay ConstructionLicense 896978 55 permits: 50 completed, 4 in progress, 1 expired or cancelled. Last filed Jul 2026. Typically 207 days from permit to final inspection.
- 12Darc Ventures Inc Dba Spl Construction SLicense 938513 70 permits: 67 completed, 1 in progress, 2 expired or cancelled. Last filed Aug 2026. Typically 179 days from permit to final inspection.
- 13Urban Builder General Contracting IncLicense 869710 51 permits: 49 completed, 1 in progress, 1 never finaled. Last filed Jul 2025. Typically 206 days from permit to final inspection. Never finaled: 1 is over 10 years old.
- 14Custom Construction EnterprisesLicense 830244 30 permits: 29 completed, 1 in progress. Last filed Dec 2025. Typically 240 days from permit to final inspection.
- 15Yefa Construction IncLicense 1047719 31 permits: 28 completed, 3 in progress. Last filed Feb 2026. Typically 290 days from permit to final inspection.
- 16Kells Construction Inc.License 746714 29 permits: 28 completed, 1 in progress. Last filed Aug 2026. Typically 90 days from permit to final inspection.
- 17J. Ho Construction IncLicense 680425 169 permits: 158 completed, 2 in progress, 7 never finaled, 2 expired or cancelled. Last filed Apr 2026. Typically 84 days from permit to final inspection. Never finaled: 2 are 5 to 10 years old, 5 are over 10 years old.
- 18Saturn Construction CoLicense 861233 66 permits: 61 completed, 3 in progress, 2 never finaled. Last filed Jun 2026. Typically 232 days from permit to final inspection. Never finaled: 1 is 5 to 10 years old, 1 is over 10 years old.
- 19Nelson T Lewis Const Co Inc.License 195866 81 permits: 75 completed, 3 in progress, 3 expired or cancelled. Last filed Sep 2026. Typically 87 days from permit to final inspection.
- 20Reliable Construction IncLicense 983658 106 permits: 89 completed, 13 in progress, 3 never finaled, 1 expired or cancelled. Last filed Jul 2026. Typically 191 days from permit to final inspection. Never finaled: 3 are 5 to 10 years old.
- 21Toni's Construction IncLicense 551504 45 permits: 44 completed, 1 expired or cancelled. Last filed Jan 2026. Typically 135 days from permit to final inspection.
- 22Winder Construction Inc.License 1033654 30 permits: 25 completed, 5 in progress. Last filed Aug 2026. Typically 312 days from permit to final inspection.
- 23Jin Qing Construction Corp.License 1030182 27 permits: 25 completed, 2 in progress. Last filed Aug 2026. Typically 275 days from permit to final inspection.
- 24C J Reed Construction CoLicense 712090 43 permits: 42 completed, 1 never finaled. Last filed Dec 2025. Typically 66 days from permit to final inspection. Never finaled: 1 is over 10 years old.
- 25MrccLicense 821253 25 permits: 24 completed, 1 in progress. Last filed May 2026. Typically 170 days from permit to final inspection.
- 26D N ConstructionLicense 945873 24 permits: 24 completed. Last filed Jan 2026. Typically 119 days from permit to final inspection.
- 27We Do Construction Inc.License 1096552 36 permits: 23 completed, 13 in progress. Last filed Oct 2026. Typically 195 days from permit to final inspection.
- 28Katz GroupLicense 1074133 24 permits: 23 completed, 1 in progress. Last filed Aug 2026. Typically 113 days from permit to final inspection.
- 29Hubert PennyLicense 809333 94 permits: 86 completed, 3 in progress, 3 never finaled, 2 expired or cancelled. Last filed Sep 2026. Typically 92 days from permit to final inspection. Never finaled: 2 are 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
- 30Great Ocean Construction Inc.License 1103304 25 permits: 22 completed, 3 in progress. Last filed Jul 2026. Typically 160 days from permit to final inspection.
- 31John Woo ConstructionllcLicense 765131 23 permits: 22 completed, 1 in progress. Last filed Aug 2026. Typically 185 days from permit to final inspection.
- 32The Sustainable Cbo Inc Dba Oliver MackiLicense 988725 22 permits: 22 completed. Last filed Apr 2025. Typically 152 days from permit to final inspection.
- 33Robison Nieri White ConstructionLicense 796298 78 permits: 74 completed, 2 never finaled, 2 expired or cancelled. Last filed Sep 2024. Typically 217 days from permit to final inspection. Never finaled: 2 are over 10 years old.
- 34Hang C Construction IncLicense 760153 39 permits: 36 completed, 2 in progress, 1 expired or cancelled. Last filed Oct 2025. Typically 162 days from permit to final inspection.
- 35E B W Builders IncLicense 794942 38 permits: 36 completed, 1 in progress, 1 expired or cancelled. Last filed Dec 2025. Typically 142 days from permit to final inspection.
- 36Paul K VouLicense 415124 22 permits: 21 completed, 1 in progress. Last filed Dec 2024. Typically 167 days from permit to final inspection.
- 37Benjamin ShawLicense 646136 21 permits: 21 completed. Last filed May 2022. Typically 141 days from permit to final inspection.
- 38Macrobuild CorporationLicense 1024387 21 permits: 21 completed. Last filed May 2022. Typically 288 days from permit to final inspection.
- 39Patrick Coakley ConstructionLicense 819320 21 permits: 21 completed. Last filed Nov 2022. Typically 141 days from permit to final inspection.
- 40Peninsula Custom Construction IncLicense 880303 53 permits: 48 completed, 3 in progress, 2 never finaled. Last filed May 2025. Typically 104 days from permit to final inspection. Never finaled: 2 are 3 to 5 years old.
How long kitchen remodel permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent kitchen remodel permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 128 Pierce St | demo interior walls in garage, open up for paving, new non-conditioned storage at back of garage. new type"x" gyp on ceiling and walls. unit 128 interior remodel for new kitchen,bathroom,mud room & powder room. replace front windows in kind w/ wood windows. unit 130,add 16sf watercloset.Details
demo interior walls in garage, open up for paving, new non-conditioned storage at back of garage. new type"x" gyp on ceiling and walls. unit 128 interior remodel for new kitchen,bathroom,mud room & powder room. replace front windows in kind w/ wood windows. unit 130,add 16sf watercloset. | $390,000 | |
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 1553 35th Av | convert 870 sf of (e) un-conditioned floor area to living area. add family room, media room, powder, laundry, bedroom and bath to 1st floor on 2nd floor. remodel kitchen and bath (n) powder. no change to street facing elevationDetails
convert 870 sf of (e) un-conditioned floor area to living area. add family room, media room, powder, laundry, bedroom and bath to 1st floor on 2nd floor. remodel kitchen and bath (n) powder. no change to street facing elevation | $200,000 | |
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 557 26th Av | interior renovation of unit 557-a @ 1st fl of a 3 story building. scope of work includes: new master suite with 1 new bathroom; kitchen renovation; replace existing non-efficacy lights with led retrofit recessed lights. existing bath to be modified with a walk in shower. new interior finishes.Details
interior renovation of unit 557-a @ 1st fl of a 3 story building. scope of work includes: new master suite with 1 new bathroom; kitchen renovation; replace existing non-efficacy lights with led retrofit recessed lights. existing bath to be modified with a walk in shower. new interior finishes. | $80,000 | |
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 740 37th Av | unit 742: revision to bpa 202607305788 - for kitchen remodel change cabinets (all in kind), replace windows: 2 at the front, 3 in the lightwell and 4 at the back.Details
unit 742: revision to bpa 202607305788 - for kitchen remodel change cabinets (all in kind), replace windows: 2 at the front, 3 in the lightwell and 4 at the back. | $5,000 | |
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 437 Day St | conversion of approximately 406 sf of existing garage space into a family recreational area accessory to the existing residence. the remodeled space will include a new bathroom and a small service/wet bar area with a sink.no kitchen, cooking or sleeping facilities are proposed.Details
conversion of approximately 406 sf of existing garage space into a family recreational area accessory to the existing residence. the remodeled space will include a new bathroom and a small service/wet bar area with a sink.no kitchen, cooking or sleeping facilities are proposed. | $20,000 | |
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 219 Brannan St | t.i. of previous retail to become office. new conference room, 4 closesd offices, and new kitchenette. existing hav system to be reused with modification for closed rooms. new lighting and control impacted areas. no change to exteriors and area.Details
t.i. of previous retail to become office. new conference room, 4 closesd offices, and new kitchenette. existing hav system to be reused with modification for closed rooms. new lighting and control impacted areas. no change to exteriors and area. | $120,000 | |
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 1742 41st Av | interior remodel and garage conversion. remodel existing kitchen and demo non load bearing wall. convert 262 of existing garage space to add a bedroom and 1 bath. remove existing non compliant interior stairs and rebuild to meet 2025 cbc sec 1011Details
interior remodel and garage conversion. remodel existing kitchen and demo non load bearing wall. convert 262 of existing garage space to add a bedroom and 1 bath. remove existing non compliant interior stairs and rebuild to meet 2025 cbc sec 1011 | $42,000 | |
| Oct 6, 2026 | In progress issued Oct 2026 | 1994 42nd Av | replace sheet rock with 5/8" type x in kitchen, living room, bedroom and bathroomsDetails
replace sheet rock with 5/8" type x in kitchen, living room, bedroom and bathrooms | $20,000 | |
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 1422 Douglass St | Nima Construction | revision to pa 202207289447 proposed finished level of 1st floor to be raised 7"; interior reconfiguration of 2nd fl kitchen, living room, dining, stair and guest bedroom; no exterior work or changes visible from public right of wayDetails
revision to pa 202207289447 proposed finished level of 1st floor to be raised 7"; interior reconfiguration of 2nd fl kitchen, living room, dining, stair and guest bedroom; no exterior work or changes visible from public right of way | |
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 511 Buchanan St | #511b: like to like kitchen & bathroom remodel at g/f. convert (e) bedroom into 2 new bedroom. add laundry at bathroom area.Details
#511b: like to like kitchen & bathroom remodel at g/f. convert (e) bedroom into 2 new bedroom. add laundry at bathroom area. | $20,000 | |
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 1477 23rd Av | light-well infill on 2/f to replace (e) interior connect for code compliance. kitchen remodel on 2/f. g/f development by converting (e) laundry area into entertainment room, family room, guest room, & add 1 new bath.Details
light-well infill on 2/f to replace (e) interior connect for code compliance. kitchen remodel on 2/f. g/f development by converting (e) laundry area into entertainment room, family room, guest room, & add 1 new bath. | $80,000 | |
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 313 Los Palmos Dr | kitchen remodel, demo partial wall & add one island. no exterior change. no work @ ground fl.Details
kitchen remodel, demo partial wall & add one island. no exterior change. no work @ ground fl. | $5,000 | |
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 225 Bush St | 15th fl - construction and cosmetic finish updates to existing break room area. 2 new food serving stations and turn existing storage to a non-cooking prep kitchenDetails
15th fl - construction and cosmetic finish updates to existing break room area. 2 new food serving stations and turn existing storage to a non-cooking prep kitchen | $454,138 | |
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 555 California St | Bcci Construction Company | 51st floor: tenant improvement for existing cooking kitchen to remain with select equipment changes. existing type2 exhaust hood to remain. grease intercepter in new slab opening.feature retractable wall system with structural upgrades.structural seismic anchorage to be deferred.Details
51st floor: tenant improvement for existing cooking kitchen to remain with select equipment changes. existing type2 exhaust hood to remain. grease intercepter in new slab opening.feature retractable wall system with structural upgrades.structural seismic anchorage to be deferred. | $1,935,000 |
| Oct 5, 2026 | In progress issued Oct 2026 | 275 Battery St | Kr Johnston Construction Inc | first floor: revision to permt#202606032400 tenant improvement . modificator to new kitchen equipment & placement per health department.Details
first floor: revision to permt#202606032400 tenant improvement . modificator to new kitchen equipment & placement per health department. | $25,938 |
| Oct 5, 2026 | In progress issued Oct 2026 | 127 Northridge Rd | Xin Xin Construction | drywall repair in kitchen approx 2 square feet.Details
drywall repair in kitchen approx 2 square feet. | $3,000 |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 3126 Santiago St | horizontal addition to 1st floor: addition of 2 bedrooms & closet spaces. addition of 2 bathrooms. 2nd floor: kitchen remodel. addition of 1 bedroom & closet space. addition of 1 bathroom.Details
horizontal addition to 1st floor: addition of 2 bedrooms & closet spaces. addition of 2 bathrooms. 2nd floor: kitchen remodel. addition of 1 bedroom & closet space. addition of 1 bathroom. | $180,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 5 Porter St | remodel & expand (e) 3rd floor to add new bedrooms, bathroos, deck, laundry & stair. remodel (e) 2nd floor to add new living, dining, family room, kitchen, den/library & stair. remodel (e) 1st floor to add new bedroom, media room, bathroom, stair, utility room & garage.Details
remodel & expand (e) 3rd floor to add new bedrooms, bathroos, deck, laundry & stair. remodel (e) 2nd floor to add new living, dining, family room, kitchen, den/library & stair. remodel (e) 1st floor to add new bedroom, media room, bathroom, stair, utility room & garage. | $250,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 522 Edinburgh St | interior remodeling: (e) kitchen to be remodeled; (e) 3rd floor bathroom to be remodeled; new roof for addingnew dormer for the bathroom expansionDetails
interior remodeling: (e) kitchen to be remodeled; (e) 3rd floor bathroom to be remodeled; new roof for addingnew dormer for the bathroom expansion | $50,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 17 Ora Wy | interior remodel with new door and windows (at rear) and a 32sqft infill at the back on the top level. the (e) crawl space behind the garage will be built out to create an unconditioned space for storage and equipment. the (e) 2nd floor will be reconfigured to expand the kitchen. the 3rd floor will.Details
interior remodel with new door and windows (at rear) and a 32sqft infill at the back on the top level. the (e) crawl space behind the garage will be built out to create an unconditioned space for storage and equipment. the (e) 2nd floor will be reconfigured to expand the kitchen. the 3rd floor will. | $450,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 675 28th St | interior kitchen remodel at 2nd floor. no expansion of building envelope or exterior work.Details
interior kitchen remodel at 2nd floor. no expansion of building envelope or exterior work. | $62,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 519 Arkansas St | convert 538 sq of storage/garage area to conditioned live space. new all electric hvac. replace front windows in kind. replace front windows in kind. replace rear windows. interior stair rebuild. kitchen and bath remodel. minor structural work. no work outside (e) foot print. no change to use.Details
convert 538 sq of storage/garage area to conditioned live space. new all electric hvac. replace front windows in kind. replace front windows in kind. replace rear windows. interior stair rebuild. kitchen and bath remodel. minor structural work. no work outside (e) foot print. no change to use. | $125,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 2298 Pacific Av | provide interior non-structural remodel: relocate kitchen, remodel / reconfigure 2 bath and 1 powder room, new finishes where required to achieve remodeling and match (e) adjacent.Details
provide interior non-structural remodel: relocate kitchen, remodel / reconfigure 2 bath and 1 powder room, new finishes where required to achieve remodeling and match (e) adjacent. | $98,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 75 Santa Ana Av | Del Rio Stone Dba: Del Rio Stone Constr. | kitchen remodel, converting and connecting garage 1/2 only into livable space, 1 bathroom will be demoed, and an addition/replacing a glass sunroom into a regular roof converting the space into a dining room.Details
kitchen remodel, converting and connecting garage 1/2 only into livable space, 1 bathroom will be demoed, and an addition/replacing a glass sunroom into a regular roof converting the space into a dining room. | $180,000 |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 2765 Greenwich St | Cs Construction Co | remodel kitchen and 3rd floor bathrooms. add powder room at 1/f. remove wall between kitchen and breakfast room.Details
remodel kitchen and 3rd floor bathrooms. add powder room at 1/f. remove wall between kitchen and breakfast room. | $249,069 |
| Oct 2, 2026 | In progress issued Oct 2026 | 1450 Hawes St | We Do Construction Inc. | repair approx. 180 sq. ft. of existing fire-damaged drywall and insulation. install one new electrical outlet and replace the existing kitchen faucet. no structural changes.Details
repair approx. 180 sq. ft. of existing fire-damaged drywall and insulation. install one new electrical outlet and replace the existing kitchen faucet. no structural changes. | $7,000 |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 36 College Av | 1st floor:comply with nov#202430475,adu including 2 beds,two full baths,living room & kitchen.2nd floor: new roof deck & rear stairs.Details
1st floor:comply with nov#202430475,adu including 2 beds,two full baths,living room & kitchen.2nd floor: new roof deck & rear stairs. | $80,000 | |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 1620 Jones St | units 5 & 7 kitchen & bathroom remodel. structural reinforcing of joists @ (n) family areaDetails
units 5 & 7 kitchen & bathroom remodel. structural reinforcing of joists @ (n) family area | $90,000 | |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 738 Elizabeth St | revision to pa# 202010106301 for a kitchen renovation. changes include updated window and door configuration of rear of house.Details
revision to pa# 202010106301 for a kitchen renovation. changes include updated window and door configuration of rear of house. | ||
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 1972 Green St | add adu: (e) studio to be legalized per nov #202540513. addition includes kitchen, bathroom and sleeping area. legalizing stair to unit and habitable space w/in (e) attic.Details
add adu: (e) studio to be legalized per nov #202540513. addition includes kitchen, bathroom and sleeping area. legalizing stair to unit and habitable space w/in (e) attic. | $85,000 |