Jon Randolph Howder
- License
- C37509
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Gensler
- Based in
- San Francisco
- On San Francisco permits
- Sep 2020 to Dec 2022
6 permits since 2000 (architect on 6 permits): 1 completed, 5 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Skyline Construction
- Engineers
- James R Gronek, Kylie Lo
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 21, 2022 | Never finaled filed Dec 2022, never issued | 1155 Battery St | 5/f: ti: nonstructural partitions, restrooms, ceilings, fixtures, finishes. mep.Details
5/f: ti: nonstructural partitions, restrooms, ceilings, fixtures, finishes. mep. | $4,500,000 | |
| Dec 21, 2022 | Never finaled filed Dec 2022, never issued | 1155 Battery St | 4/f: ti: nonstructural partitions, restrooms, ceilings, fixtures, finishes. mep.Details
4/f: ti: nonstructural partitions, restrooms, ceilings, fixtures, finishes. mep. | $4,500,000 | |
| Dec 21, 2022 | Never finaled filed Dec 2022, never issued | 1155 Battery St | 3/f: ti: nonstructural partitions, restrooms, ceiling, fixtures, finishes. including mep. life safety deferred.Details
3/f: ti: nonstructural partitions, restrooms, ceiling, fixtures, finishes. including mep. life safety deferred. | $4,500,000 | |
| Dec 21, 2022 | Never finaled filed Dec 2022, never issued | 1155 Battery St | 6/f: ti: nonstructural partitions, restrooms, ceilings, fixtures, finishes. mep.Details
6/f: ti: nonstructural partitions, restrooms, ceilings, fixtures, finishes. mep. | $4,500,000 | |
| Sep 20, 2022 | Never finaled filed Sep 2022, never issued | 1155 Battery St | 2/f: t.i., new non-load bearing partitions, ceilings, lighting, mep, finishes, & casework. install of horizontal exit assemblyDetails
2/f: t.i., new non-load bearing partitions, ceilings, lighting, mep, finishes, & casework. install of horizontal exit assembly | $5,300,000 | |
| Sep 2, 2020 | Completed final sign-off Apr 2022 | 301 Howard St | Skyline Construction | tenant improvement on 20th & 21st fl to include demolition of existing partition. new interior partirions, ceiling, wall and floor finishes. structural work to enlarge existing stair opening.Details
tenant improvement on 20th & 21st fl to include demolition of existing partition. new interior partirions, ceiling, wall and floor finishes. structural work to enlarge existing stair opening. | $5,524,278 |