Rebecca Friedberg
- Listed as
- architect
- On San Francisco permits
- Apr 2017 to Apr 2026
6 permits since 2000 (architect on 6 permits): 4 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 23, 2026 | In progress issued Apr 2026 | 1858 Union St | Zack De Vito Inc | remodel of (e) restroom in 1858 to create new accessible restroom, new fixtures and lighting leveling of floor in 1858 to create continous floor.Details
remodel of (e) restroom in 1858 to create new accessible restroom, new fixtures and lighting leveling of floor in 1858 to create continous floor. | $129,000 |
| Jan 18, 2022 | Completed final sign-off Dec 2023 | 5150 Geary Bl | tenant improvement of existing ground floor commercial space includes the following: enlarged storefront windows on south facade; new interior partitions,doors, and ceilings; mechanical: new hvac system (electric heat pump); plumbing: installation of new restrooms and new sinks, upgraded meterDetails
tenant improvement of existing ground floor commercial space includes the following: enlarged storefront windows on south facade; new interior partitions,doors, and ceilings; mechanical: new hvac system (electric heat pump); plumbing: installation of new restrooms and new sinks, upgraded meter | $165,000 | |
| Jun 9, 2021 | Completed final sign-off Oct 2021 | 2286 Union St | Sld Construction Inc | revision to pa# 2021-0310-6264. demo one bearing wall and install new beam.Details
revision to pa# 2021-0310-6264. demo one bearing wall and install new beam. | $2,000 |
| Mar 10, 2021 | Completed final sign-off Nov 2021 | 2286 Union St | Sld Construction Inc | interior tenant improvements for massage use. demo of non-bearing partial height walls and construction of new non-bearing partitions. no change to structure, envelope, storefront. lighting, plumbing and hvac improvements.Details
interior tenant improvements for massage use. demo of non-bearing partial height walls and construction of new non-bearing partitions. no change to structure, envelope, storefront. lighting, plumbing and hvac improvements. | $45,000 |
| Feb 24, 2020 | Expired or cancelled cancelled Jan 2026 | 301 Howard St | Baba Builders Co | ground fl, ste 120 - commercial ti. new work includes partitions, plulmbing, electrical & mechanical scope. new use is wine shop. no change to facade, no structural work. retail only maher not reqDetails
ground fl, ste 120 - commercial ti. new work includes partitions, plulmbing, electrical & mechanical scope. new use is wine shop. no change to facade, no structural work. retail only maher not req | $160,000 |
| Apr 28, 2017 | Completed final sign-off May 2019 | 23 Alvarado St | Dore Const. Of Calif. Inc. | rear structure - revision to pa 2014-1022-9595, convert 1 garage to bedroom, add 1 bath, rebuild interior stairs to code, add a bedroom on 2nd floor, revise existing window location.Details
rear structure - revision to pa 2014-1022-9595, convert 1 garage to bedroom, add 1 bath, rebuild interior stairs to code, add a bedroom on 2nd floor, revise existing window location. | $30,000 |