Joel Chapin
- License
- C34233
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Norr Associates Inc.
- On San Francisco permits
- Sep 2017 to Apr 2021
4 permits since 2000 (architect on 4 permits): 2 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Eric F Anderson Incorporated, G Swanson Constr. Inc.
- Architects
- Adam Murphy
- Engineers
- Benjamine Sprinkle, Rickert C Henriksen, Roger Makishima
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 4
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 27, 2021 | Never finaled issued May 2021, no final | 50 California St | G Swanson Constr. Inc. | 1st fl: installation of a new wellness room. to comply with california state labor code chapter 3.8, lactation accomodation sections 1030-1034.Details
1st fl: installation of a new wellness room. to comply with california state labor code chapter 3.8, lactation accomodation sections 1030-1034. | $5,500 |
| Sep 3, 2020 | Never finaled filed Sep 2020, never issued | 1900 19th Av | cvs: interior tenant improvement of existing millwork, fixtures, & finishes. construct new non-load bearing walls as required to provide new/updated retail health services.Details
cvs: interior tenant improvement of existing millwork, fixtures, & finishes. construct new non-load bearing walls as required to provide new/updated retail health services. | $190,000 | |
| Jan 23, 2018 | Completed final sign-off Jan 2019 | 701 Van Ness Av | Eric F Anderson Incorporated | change of use. t.i. for retail pharmacy on ground floor. work includes new partitions, fixtures, casework, finishes mep. fire protection and extg signage under separate permits.Details
change of use. t.i. for retail pharmacy on ground floor. work includes new partitions, fixtures, casework, finishes mep. fire protection and extg signage under separate permits. | $1,500,000 |
| Sep 18, 2017 | Completed final sign-off Jun 2018 | 500 Pine St | 1/f- t.i. for (n) g/f retail tenant, work to includes (n) partitions, fixtures, finishes, casework & mep.Details
1/f- t.i. for (n) g/f retail tenant, work to includes (n) partitions, fixtures, finishes, casework & mep. | $1,500,000 |