Block 0340, lot 015
162 Taylor St
- City’s use
- Commercial Hotel
- Built
- 1910
- Stories
- 2
- Units
- 8
- Rooms
- 25 bathrooms
- Building
- 25,692 sq ft
- Lot
- 8,285 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
35 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 13, 2023 | Never finaled issued Aug 2023, no final | 162 Taylor St | Esquivel Grading & Paving, Inc. | alteration of subsidewalk basement roof slab to install new sidewalkDetails
alteration of subsidewalk basement roof slab to install new sidewalk | $80,903 |
| May 18, 2018 | Completed final sign-off May 2019 | 162 Taylor St | rpelacing 30 street facing window with jeld-win or custom made wood or wood-clad single-hung windows. no sizes will be changed.Details
rpelacing 30 street facing window with jeld-win or custom made wood or wood-clad single-hung windows. no sizes will be changed. | $13,000 | |
| Mar 22, 2018 | Completed final sign-off May 2018 | 162 Taylor St | The Home Depot Usa Inc | replace (5) windows not visible from street, max u-factor 0.32, no structural changes, replacement windows in 10 feet, bedroom emergency/rescue window to maintain.Details
replace (5) windows not visible from street, max u-factor 0.32, no structural changes, replacement windows in 10 feet, bedroom emergency/rescue window to maintain. | $5,185 |
| Dec 12, 2016 | Completed final sign-off Jan 2017 | 191 Eddy St | Curran & Associates General Contractors | to comply with nov 201620031 remove all non permitted office rooms at basement. soft demo ab-017Details
to comply with nov 201620031 remove all non permitted office rooms at basement. soft demo ab-017 | $5,000 |
| Mar 25, 2015 | Completed final sign-off Apr 2015 | 144 Taylor St | Greentree Design/Build | to obtain final inspection for work approved under pa#2013-1220-4713. all work is complete.Details
to obtain final inspection for work approved under pa#2013-1220-4713. all work is complete. | |
| Mar 25, 2015 | Completed final sign-off Apr 2015 | 144 Taylor St | Greentree Design/Build | to obtain final inspection for work approved under pa#2013-0201-9303. all work is complete.Details
to obtain final inspection for work approved under pa#2013-0201-9303. all work is complete. | |
| Mar 10, 2015 | Completed final sign-off Apr 2015 | 144 Taylor St | Greentree Design/Build | adjustment to path of travel on emergency egress and occupant load for theater 1 & 2, added sound vestibule, adjusted kitchen size revision to pa# 2012 11 13 4020Details
adjustment to path of travel on emergency egress and occupant load for theater 1 & 2, added sound vestibule, adjusted kitchen size revision to pa# 2012 11 13 4020 | |
| Feb 19, 2015 | Never finaled issued Feb 2015, no final | 191 Eddy St | Bryland Contracting And Electrical | replace existing in-line exhaust fan to existing ducting in kiln room. from 400 cfm to 740 cfmDetails
replace existing in-line exhaust fan to existing ducting in kiln room. from 400 cfm to 740 cfm | $500 |
| Feb 11, 2015 | Completed final sign-off Mar 2015 | 144 Taylor St | Peninsula Fire Protection Inc | install fire suppression system to new 10' hood and duct. ref app#201404254235Details
install fire suppression system to new 10' hood and duct. ref app#201404254235 | $4,500 |
| Jan 8, 2015 | Completed final sign-off Mar 2015 | 144 Taylor St | to renew expired permit for pa#2013-0603-8495.Details
to renew expired permit for pa#2013-0603-8495. | ||
| Oct 2, 2014 | Completed final sign-off Mar 2015 | 144 Taylor St | Crime Watch Security Sys Llc | installation of a sprinkler monitoring system including fire alarm control panel, smoke det, pull station and monitor modules. ref 201211134020Details
installation of a sprinkler monitoring system including fire alarm control panel, smoke det, pull station and monitor modules. ref 201211134020 | $4,000 |
| Aug 7, 2014 | Completed final sign-off Aug 2014 | 162 Taylor St | Oceanside Sheet Metal | to line rubbish room with 26 gauage galv. metal with pocket locks. ; to comply with nov#201475751Details
to line rubbish room with 26 gauage galv. metal with pocket locks. ; to comply with nov#201475751 | $4,800 |
| Apr 25, 2014 | Completed final sign-off Apr 2015 | 144 Taylor St | Greentree Design/Build | 1)install new kitchen cooking equipment at ground floor. 2)install new hvac systems per plan. 3)install new lighting fixtures per plan. reference to approved pa#2012-1113-4020Details
1)install new kitchen cooking equipment at ground floor. 2)install new hvac systems per plan. 3)install new lighting fixtures per plan. reference to approved pa#2012-1113-4020 | $30,000 |
| Dec 20, 2013 | Never finaled issued Dec 2013, no final | 144 Taylor St | Greentree Design/Build | revision to appl #2013.0201.9303 - no longer making certain alterations detailed in original permit to leave certain elements as exisitng: (e) brick siding, (e) aluminum window & ceramic tile to remain. no new windows.Details
revision to appl #2013.0201.9303 - no longer making certain alterations detailed in original permit to leave certain elements as exisitng: (e) brick siding, (e) aluminum window & ceramic tile to remain. no new windows. | |
| Jun 4, 2013 | Completed final sign-off Oct 2013 | 162 Taylor St | Occidental Express | installing grab bars in all common bathrooms per ordinance #029-13Details
installing grab bars in all common bathrooms per ordinance #029-13 | $500 |
| Jun 3, 2013 | Completed final sign-off Mar 2015 | 144 Taylor St | Star Plumbing & Fire Const Co. | ti of existing fire sprinkelr system for remodeled a1 & a2 occupancy. 79 sprinklers. no work in r2 units.Details
ti of existing fire sprinkelr system for remodeled a1 & a2 occupancy. 79 sprinklers. no work in r2 units. | $30,000 |
| Feb 1, 2013 | Never finaled issued Feb 2013, no final | 144 Taylor St | Greentree Design/Build | storefront remodel-relocate existing main entrance. ref: 201211134020; brass storefront to opposite side (within (e) openings), new 2nd exit brass storefront within (e) opening, (n) bronze anodized alum storefront door & windows above, restore and repair brick and stucco, new paint new signageDetails
storefront remodel-relocate existing main entrance. ref: 201211134020; brass storefront to opposite side (within (e) openings), new 2nd exit brass storefront within (e) opening, (n) bronze anodized alum storefront door & windows above, restore and repair brick and stucco, new paint new signage | $25,000 |
| Nov 13, 2012 | Completed final sign-off Apr 2015 | 144 Taylor St | Greentree Design/Build | interior t.i.:remodel of extg restaurant. addition of 2 performance art theater spaces. new ada commercial restrooms. relocate bar and upgrade current kitchen. no exterior changes proposed. including ductworkDetails
interior t.i.:remodel of extg restaurant. addition of 2 performance art theater spaces. new ada commercial restrooms. relocate bar and upgrade current kitchen. no exterior changes proposed. including ductwork | $120,000 |
| Feb 10, 2012 | Completed final sign-off Apr 2012 | 162 Taylor St | San Francisco Fire Protection | add 31 mini horns, 2 weatherproof h/s & 1 power supply to system. system was re-activated on pa# 2011-1114-8824-this permit is to bring building up to current audibility codesDetails
add 31 mini horns, 2 weatherproof h/s & 1 power supply to system. system was re-activated on pa# 2011-1114-8824-this permit is to bring building up to current audibility codes | $2,500 |
| Nov 14, 2011 | Completed final sign-off Apr 2012 | 162 Taylor St | San Francisco Fire Protection | create and submit plans for extg fire alarm system for field inspector.Details
create and submit plans for extg fire alarm system for field inspector. | $500 |
| Jun 28, 2011 | Never finaled issued Jun 2011, no final | 144 Taylor St | street space permitDetails
street space permit | ||
| Sep 8, 2010 | Completed final sign-off May 2011 | 144 Taylor St | High Quality Roofing | reroofingDetails
reroofing | $19,500 |
| Jul 29, 2010 | Never finaled issued Jul 2010, no final | 162 Taylor St | street space permit.Details
street space permit. | ||
| Mar 8, 2010 | Never finaled issued Mar 2010, no final | 162 Taylor St | street space permitDetails
street space permit | ||
| Mar 8, 2010 | Completed final sign-off Nov 2012 | 162 Taylor St | Occidental Express | remodeling of all rooms in hotel protion. including drywall, tiling, electrical and plumbing. replacing windws with dual glaze 15 windows. not visible from the street vinyl visible from street to be repaired. no structural work not affecting egress.Details
remodeling of all rooms in hotel protion. including drywall, tiling, electrical and plumbing. replacing windws with dual glaze 15 windows. not visible from the street vinyl visible from street to be repaired. no structural work not affecting egress. | $185,000 |
| Dec 2, 2008 | Expired or cancelled expired Jun 2010 | 144 Taylor St | John Mulholland Dba Mulholland Const. | minor fire damage: repair to 10 dwelling units. all repair in kind.Details
minor fire damage: repair to 10 dwelling units. all repair in kind. | $40,000 |
| Sep 5, 2008 | Completed final sign-off Oct 2008 | 162 Taylor St | Alliance Fire Services | renew pa#200302087710 for final inspection.Details
renew pa#200302087710 for final inspection. | |
| Aug 6, 2008 | Never finaled issued Aug 2008, no final | 144 Taylor St | Poteras Construction | comply with his nov# 200840991, # 200841033 & # 200858184. 5 rooms & 1 rest room to be remodal. (painting, new carpet) new toilet, sink, ect. finish work.Details
comply with his nov# 200840991, # 200841033 & # 200858184. 5 rooms & 1 rest room to be remodal. (painting, new carpet) new toilet, sink, ect. finish work. | $35,000 |
| Feb 27, 2008 | Completed final sign-off Jul 2008 | 162 Taylor St | Innovative Technologies | connection of dialer to ex. fire alarm system for sprinkler monitoring per sro ordinanceDetails
connection of dialer to ex. fire alarm system for sprinkler monitoring per sro ordinance | $900 |
| Oct 20, 2004 | Expired or cancelled expired Oct 2005 | 162 Taylor St | removing bathtub & installing shower existing plumbing in there, comply w/nov 200451474 dated 7/6/04Details
removing bathtub & installing shower existing plumbing in there, comply w/nov 200451474 dated 7/6/04 | $1,000 | |
| Aug 28, 2003 | Completed final sign-off May 2004 | 199 Eddy St | to erect signDetails
to erect sign | ||
| Feb 18, 2003 | Expired or cancelled expired Mar 2008 | 162 Taylor St | Jupiter Enterprises Inc | install fire sprinkler system for residential hotel only per s.f. ordinance #170-02 from (e) 4" fireDetails
install fire sprinkler system for residential hotel only per s.f. ordinance #170-02 from (e) 4" fire | $8,000 |
| Feb 14, 2003 | Completed final sign-off Feb 2003 | 199 Eddy St | revision to app #200211131354/install shelving onlyDetails
revision to app #200211131354/install shelving only | $15,000 | |
| Nov 13, 2002 | Completed final sign-off Feb 2003 | 144 Taylor St | remodel ground floor/nw elec./restroom for disabled/nw wndw/entry outletDetails
remodel ground floor/nw elec./restroom for disabled/nw wndw/entry outlet | $100,000 | |
| Nov 6, 2002 | Completed final sign-off Feb 2003 | 199 Eddy St | Steve's Awning | install new awnings made of tubing 1"0 and 3/4 frame, winyl cove. awnings ahached to wall by boltDetails
install new awnings made of tubing 1"0 and 3/4 frame, winyl cove. awnings ahached to wall by bolt | $2,850 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Greentree Design/Build (7), Occidental Express (2), San Francisco Fire Protection (2), Alliance Fire Services, Bryland Contracting And Electrical, Crime Watch Security Sys Llc, Curran & Associates General Contractors, Esquivel Grading & Paving, Inc., High Quality Roofing, Innovative Technologies, John Mulholland Dba Mulholland Const., Jupiter Enterprises Inc, Oceanside Sheet Metal, Peninsula Fire Protection Inc, Poteras Construction, Star Plumbing & Fire Const Co., Steve's Awning, The Home Depot Usa Inc
- Engineers
- Farshad Khodayari
- Subcontractors
- Brendan Bannon
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.