Brendan Bannon
- Listed as
- contractor, subcontractor
- Firm
- Bannon Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2007 to Jun 2023
11 permits since 2000 (contractor on 7 permits, subcontractor on 4 permits): 6 completed, 4 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 26, 2023 | Never finaled issued Aug 2023, no final | 302 Ellis St | Esquivel Grading & Paving, Inc. | sidewalk replacement and waterproofing over sub-sidewalk basement adjustment of elevator frame to new sidewalk upgradeDetails
sidewalk replacement and waterproofing over sub-sidewalk basement adjustment of elevator frame to new sidewalk upgrade | $57,427 |
| Jun 6, 2023 | Never finaled issued Aug 2023, no final | 225 Taylor St | Esquivel Grading & Paving, Inc. | alteration of subsidewalk basement roof slab to install new sidewalkDetails
alteration of subsidewalk basement roof slab to install new sidewalk | $252,598 |
| Apr 18, 2023 | Never finaled issued Aug 2023, no final | 55 Taylor St | Esquivel Grading & Paving, Inc. | alteration of sub-sidewalk basement roof slab to install new sidewalk.Details
alteration of sub-sidewalk basement roof slab to install new sidewalk. | $252,599 |
| Mar 13, 2023 | Never finaled issued Aug 2023, no final | 162 Taylor St | Esquivel Grading & Paving, Inc. | alteration of subsidewalk basement roof slab to install new sidewalkDetails
alteration of subsidewalk basement roof slab to install new sidewalk | $80,903 |
| Jan 14, 2021 | Completed final sign-off Aug 2021 | 1101 South Van Ness Av | Bannon Construction Inc | install emergency responder radio coverage systemDetails
install emergency responder radio coverage system | $50,000 |
| Nov 17, 2020 | Completed final sign-off Apr 2022 | 3099 22nd St | Bannon Construction Inc | convert space at gr flr of (n) bldg from workshop/gym to new 1-brm 490 sq ft adu. bath existing as part of approved space, kitchen, w/d and partitions added to convert to dwelling. 3 new condo units within bldg on 2nd, 3rd and 4th floors under base building permit # 2007-1228-1474 & 2020-0930-5600.Details
convert space at gr flr of (n) bldg from workshop/gym to new 1-brm 490 sq ft adu. bath existing as part of approved space, kitchen, w/d and partitions added to convert to dwelling. 3 new condo units within bldg on 2nd, 3rd and 4th floors under base building permit # 2007-1228-1474 & 2020-0930-5600. | $5,000 |
| Sep 30, 2020 | Completed final sign-off Oct 2021 | 1101 South Van Ness Av | Bannon Construction Inc | revision to pa# 2007-1228-1474, for new residential 3-unit condominum. change type of const. from 3 stories type va over 1a podium to 4 stories type va. interior partition layout altered throughout. shared elevator changed to private residential elevators to 3rd and 4th flrs.Details
revision to pa# 2007-1228-1474, for new residential 3-unit condominum. change type of const. from 3 stories type va over 1a podium to 4 stories type va. interior partition layout altered throughout. shared elevator changed to private residential elevators to 3rd and 4th flrs. | |
| Oct 2, 2018 | Completed final sign-off May 2019 | 400 Lansdale Av | Bannon Construction Inc | revision to pa 201705197200. comply w/ complaint 201882551. revise entry, add storage at rear of kitchen of unit 1. revise garage floor structure from concrete infill to steel metal deck and concrete floor. revision to bathrooms including adding 2 (n) full bath and 1 (n) powder roomDetails
revision to pa 201705197200. comply w/ complaint 201882551. revise entry, add storage at rear of kitchen of unit 1. revise garage floor structure from concrete infill to steel metal deck and concrete floor. revision to bathrooms including adding 2 (n) full bath and 1 (n) powder room | $1,000 |
| Jul 24, 2018 | Completed final sign-off May 2019 | 400 Lansdale Av | Bannon Construction Inc | rev to pa#201705197200: add windows to front elevation, repair /resurface stucco, resurface ext. brick entry stair w/ stone tile.Details
rev to pa#201705197200: add windows to front elevation, repair /resurface stucco, resurface ext. brick entry stair w/ stone tile. | $2,000 |
| Sep 20, 2017 | Expired or cancelled expired Feb 2023 | 1315 Monterey Bl | Richbay Construction, Jin Qing Construction Corp., Bannon Construction Inc | 1st fl - add powder rm & convert office to media. add patio deck at 1st fl and cantilevered blacony at 3rd fl; remove (e) 3rd fl window bay at rear, add roof deck above. replace front facade picture window, door and garage door. excavate at 1st fl to extend new interior stair. interior reno to incluDetails
1st fl - add powder rm & convert office to media. add patio deck at 1st fl and cantilevered blacony at 3rd fl; remove (e) 3rd fl window bay at rear, add roof deck above. replace front facade picture window, door and garage door. excavate at 1st fl to extend new interior stair. interior reno to inclu | $350,000 |
| Dec 28, 2007 | Completed final sign-off Oct 2021 | 1101 South Van Ness Av | Bannon Construction Inc | erect 4-story, 3-unit condominiums.Details
erect 4-story, 3-unit condominiums. | $850,000 |