Ryan Henderson
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Locus Architecture Studio
- Based in
- Sonoma
- On San Francisco permits
- Aug 2007 to Jan 2020
15 permits since 2000 (architect on 12 permits, engineer on 2 permits, authorized agent-others on 1 permit): 13 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 17, 2020 | Completed final sign-off Sep 2020 | 235 San Leandro Wy | Perfect Bldr. Inc/Dba: Bldg. Solutions | remodel (2) kitchen on level 1. remodel level 2 to create master suite. add ductless hvac unit to east side of level 1 roof. replace 2 windows to match (e) level 1 windows. add electrical panel on level 00, next to existing panel.Details
remodel (2) kitchen on level 1. remodel level 2 to create master suite. add ductless hvac unit to east side of level 1 roof. replace 2 windows to match (e) level 1 windows. add electrical panel on level 00, next to existing panel. | $150,000 |
| Dec 13, 2019 | Completed final sign-off Jun 2020 | 2618 18th Av | Perfect Bldr. Inc/Dba: Bldg. Solutions | interior remodel, bathroom removal and relocation of bathtub on lower level, remove one post n/a maherDetails
interior remodel, bathroom removal and relocation of bathtub on lower level, remove one post n/a maher | $60,000 |
| Nov 8, 2019 | Completed final sign-off Jun 2020 | 2618 18th Av | Perfect Bldr. Inc/Dba: Bldg. Solutions | opening wall between kitchen & dining room on 2/f main level.Details
opening wall between kitchen & dining room on 2/f main level. | $5,000 |
| Oct 22, 2019 | Completed final sign-off Jul 2022 | 2729 Pine St | Perfect Bldr. Inc/Dba: Bldg. Solutions | remove and replace 11 ft 11 in of exiting rear bldg at levels 2 and 3 to remediate age compromised condition. addition of 28 sq ft by eliminating re-entrant corner. replace rear deck and stairs. add 4 ft by 4 ft skylight in rear roof; voluntary structural strengthening each levelDetails
remove and replace 11 ft 11 in of exiting rear bldg at levels 2 and 3 to remediate age compromised condition. addition of 28 sq ft by eliminating re-entrant corner. replace rear deck and stairs. add 4 ft by 4 ft skylight in rear roof; voluntary structural strengthening each level | $125,000 |
| Oct 8, 2019 | Completed final sign-off Nov 2021 | 400 Lansdale Av | Cullinane Plastering | (n) wood lagging retaining walls @ rear yard only. no more than 16 cu yardDetails
(n) wood lagging retaining walls @ rear yard only. no more than 16 cu yard | $20,000 |
| Aug 28, 2019 | Completed final sign-off Jul 2022 | 2731 Pine St | Perfect Bldr. Inc/Dba: Bldg. Solutions | convert level 3 bedroom into a master bathroom.Details
convert level 3 bedroom into a master bathroom. | $18,000 |
| Jul 24, 2018 | Completed final sign-off May 2019 | 400 Lansdale Av | Bannon Construction Inc | rev to pa#201705197200: add windows to front elevation, repair /resurface stucco, resurface ext. brick entry stair w/ stone tile.Details
rev to pa#201705197200: add windows to front elevation, repair /resurface stucco, resurface ext. brick entry stair w/ stone tile. | $2,000 |
| Jun 19, 2018 | Completed final sign-off Mar 2021 | 4524 25th St | Barker-O'donoghue Master Bldrs | revision to approved pa #201206192959 - rebuild front stairs inkind that collapsed during construction due to dry rot & unreinforced masonryDetails
revision to approved pa #201206192959 - rebuild front stairs inkind that collapsed during construction due to dry rot & unreinforced masonry | $1,000 |
| May 17, 2018 | Completed final sign-off Dec 2020 | 4524 25th St | Barker-O'donoghue Master Bldrs, Park View Construction | to comply with nov 201840672 - install (n) (3ft max unbalanced retained height) concrete retaining wall @ rear yard on (3) sides. install (n) 6" high wood fence on (3) sides. max combined height no greater than 10' high from adjacent grade.Details
to comply with nov 201840672 - install (n) (3ft max unbalanced retained height) concrete retaining wall @ rear yard on (3) sides. install (n) 6" high wood fence on (3) sides. max combined height no greater than 10' high from adjacent grade. | $5,000 |
| Feb 14, 2018 | Never finaled filed Feb 2018, never issued | 250 Napoleon St | unit k: abatement of violations 201832201, 201832591, raise rear room ceiling, legalize cultivation rooms. e restroom ada improvements maher not req maher not reqDetails
unit k: abatement of violations 201832201, 201832591, raise rear room ceiling, legalize cultivation rooms. e restroom ada improvements maher not req maher not req | ||
| Jun 8, 2017 | Completed final sign-off Jan 2018 | 2331 Mission St | relocation of front bar, seating/table adjustments, related electrical & plumbing. reduce wall height at kitchen for mezzanine compliance. fire under separate permits, if required upon field inspection.Details
relocation of front bar, seating/table adjustments, related electrical & plumbing. reduce wall height at kitchen for mezzanine compliance. fire under separate permits, if required upon field inspection. | $30,000 | |
| May 19, 2017 | Completed final sign-off May 2019 | 400 Lansdale Av | adu @ (e) basement, reconfigure lower basement & garage, replace rear deck in kind, interior kitchen & bath remodel.add unit per ordinance 95-17Details
adu @ (e) basement, reconfigure lower basement & garage, replace rear deck in kind, interior kitchen & bath remodel.add unit per ordinance 95-17 | $300,000 | |
| Jun 19, 2012 | Completed final sign-off Feb 2021 | 4524 25th St | Barker-O'donoghue Master Bldrs | alteration to 1st & 3rd floors. addition at rear on all floors. addition of new bedroom, 2 new baths, family room & expand basement level.Details
alteration to 1st & 3rd floors. addition at rear on all floors. addition of new bedroom, 2 new baths, family room & expand basement level. | $140,000 |
| Apr 12, 2010 | Expired or cancelled withdrawn Jan 2011 | 1243 12th Av | Caffrey Landscapes | demo (e) wd. deck & stair @ rear exterior. build new wd. deck & stair @ rear exterior. (different size of deck)Details
demo (e) wd. deck & stair @ rear exterior. build new wd. deck & stair @ rear exterior. (different size of deck) | $9,000 |
| Aug 1, 2007 | Completed final sign-off Oct 2007 | 1721 Noe St | Caffrey Landscapes | addition of (n) redwood deck in back yard, including wood stairs to gradeDetails
addition of (n) redwood deck in back yard, including wood stairs to grade | $5,000 |