Block 0474, lot 016B
3150 Franklin St
- City’s use
- Multi-Family Residential
- Built
- 1924
- Stories
- 3
- Units
- 12
- Rooms
- 17 bedrooms, 12 bathrooms
- Building
- 10,991 sq ft
- Lot
- 4,120 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
22 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 27, 2026 | Completed final sign-off Jul 2026 | 3150 Franklin St | Redlog Flooring Services Corp | unit 7: replace ceiling of living room, in-kind. all work interior.Details
unit 7: replace ceiling of living room, in-kind. all work interior. | $10,000 |
| Apr 14, 2026 | Completed final sign-off Jun 2026 | 3150 Franklin St | G T M Works Llc Dba Greentree Maint | unit #8: install one new clothes washer and dryer. no wall demo.Details
unit #8: install one new clothes washer and dryer. no wall demo. | $5,000 |
| Mar 9, 2022 | Completed final sign-off Apr 2022 | 3150 Franklin St | Au Electric Corporation/Aec Alarms | as-built fire alarm for pa202102255425. add/install 3 wireless low freq sounds at units 2/6/10 bedrooms & replce napco radio with honeywell clss gateway.Details
as-built fire alarm for pa202102255425. add/install 3 wireless low freq sounds at units 2/6/10 bedrooms & replce napco radio with honeywell clss gateway. | $2,000 |
| Nov 19, 2021 | Completed final sign-off May 2022 | 3150 Franklin St | B-Side Inc. | apt 9: convert (e) living room to bedroom & (e) dining room to living. rehab (e) ktichen& bathroom. install washer/dryer.Details
apt 9: convert (e) living room to bedroom & (e) dining room to living. rehab (e) ktichen& bathroom. install washer/dryer. | $46,000 |
| Apr 19, 2021 | Completed final sign-off Oct 2021 | 3150 Franklin St | B-Side Inc. | apt 11: rehab bathroom & kitchen. replace washer/dryer in (e) closet.Details
apt 11: rehab bathroom & kitchen. replace washer/dryer in (e) closet. | $25,000 |
| Feb 25, 2021 | Completed final sign-off Mar 2022 | 3150 Franklin St | Au Electric Corporation/Aec Alarms | upgrade the existing fire alarm system to comply with sffc 1103.7.6.1 & nfpa 72. install low frequency sounders in sleeping areas & replace smoke, pull stations & horn/strobes (like for like) in common area.Details
upgrade the existing fire alarm system to comply with sffc 1103.7.6.1 & nfpa 72. install low frequency sounders in sleeping areas & replace smoke, pull stations & horn/strobes (like for like) in common area. | $35,000 |
| Feb 1, 2021 | Completed final sign-off Jul 2021 | 3150 Franklin St | B-Side Inc. | #7: remodel bathroom. remodel kitchen. replace washer/dryer. no moving walls. no structural work.Details
#7: remodel bathroom. remodel kitchen. replace washer/dryer. no moving walls. no structural work. | $20,000 |
| Dec 17, 2020 | Never finaled issued Apr 2021, no final | 3150 Franklin St | B-Side Inc. | unit #5 - interior alteration. rehabilitate (e) kitchen & bathroom; install washer & dryerDetails
unit #5 - interior alteration. rehabilitate (e) kitchen & bathroom; install washer & dryer | $35,000 |
| Dec 16, 2020 | Completed final sign-off Jan 2022 | 3150 Franklin St | B-Side Inc. | (unit #6): revision to no plan pa# 202011128729. relocate bedroom. convert existing kitchen to studyroom. relocate kitchen. rehabilitate existing bathroom. install washer & dryer.Details
(unit #6): revision to no plan pa# 202011128729. relocate bedroom. convert existing kitchen to studyroom. relocate kitchen. rehabilitate existing bathroom. install washer & dryer. | $42,000 |
| Dec 2, 2020 | Completed final sign-off Jul 2021 | 3150 Franklin St | B-Side Inc. | unit 10 - 4th flr. relocate bedroom, convert (e) kitchen to studyroom, relocate kitchen, rehabilitate (e) bathroom, install washer/dryer.Details
unit 10 - 4th flr. relocate bedroom, convert (e) kitchen to studyroom, relocate kitchen, rehabilitate (e) bathroom, install washer/dryer. | $40,000 |
| Dec 2, 2020 | Completed final sign-off Jan 2022 | 3150 Franklin St | B-Side Inc. | unit #2: revision to no-plan pa# . convert (e) kitchen to study. relocate kitchen. rehabilitate (e) bathroom. install washer & dryer.Details
unit #2: revision to no-plan pa# . convert (e) kitchen to study. relocate kitchen. rehabilitate (e) bathroom. install washer & dryer. | $40,000 |
| Nov 12, 2020 | Never finaled issued Nov 2020, no final | 3150 Franklin St | B-Side Inc. | unit 6: remodel of one bathroom and one kitchen. no new wall and no (e) wall relocation. all new plumbing fixtures remain at (e) location. new lighting for kitchen & bathroom remodel shall comply with cec 150.0(k)3 and (k)5.Details
unit 6: remodel of one bathroom and one kitchen. no new wall and no (e) wall relocation. all new plumbing fixtures remain at (e) location. new lighting for kitchen & bathroom remodel shall comply with cec 150.0(k)3 and (k)5. | $20,000 |
| Nov 3, 2020 | Completed final sign-off Jul 2021 | 3150 Franklin St | B-Side Inc. | unit 10 - rehab bathroom & kitchenDetails
unit 10 - rehab bathroom & kitchen | $10,000 |
| Nov 2, 2020 | Completed final sign-off Apr 2021 | 3150 Franklin St | B-Side Inc. | rehab/remodel bathroom, kitchen, replace washer/dryer. no moving any walls.Details
rehab/remodel bathroom, kitchen, replace washer/dryer. no moving any walls. | $20,000 |
| Oct 14, 2020 | Never finaled issued Oct 2020, no final | 3150 Franklin St | B-Side Inc. | unit #2: remodel bathroom and kitchen. washer and dryerDetails
unit #2: remodel bathroom and kitchen. washer and dryer | $20,000 |
| Aug 11, 2020 | Never finaled issued Aug 2020, no final | 3150 Franklin St | B-Side Inc. | unit# 8: rehab bathroom and kitchen. no structural work no moving of walls.Details
unit# 8: rehab bathroom and kitchen. no structural work no moving of walls. | $20,000 |
| Aug 10, 2020 | Completed final sign-off Feb 2021 | 3150 Franklin St | B-Side Inc. | unit# 12. rehab bathroom & kiatchen. replace washer, dryer. no structual work. no moving walls.Details
unit# 12. rehab bathroom & kiatchen. replace washer, dryer. no structual work. no moving walls. | $35,000 |
| Sep 21, 2017 | Never finaled issued Sep 2017, no final | 3150 Franklin St | street spaceDetails
street space | ||
| Sep 21, 2015 | Never finaled issued Sep 2015, no final | 3150 Franklin St | steet spaceDetails
steet space | ||
| Jun 30, 2015 | Never finaled issued Jun 2015, no final | 3150 Franklin St | street spaceDetails
street space | ||
| Mar 19, 2015 | Never finaled issued Mar 2015, no final | 3150 Franklin St | street spaceDetails
street space | ||
| May 21, 2014 | Completed final sign-off Nov 2015 | 3150 Franklin St | Vector Construction Inc. | mandated tier 3 seismic soft story upgrade. new foundation & shearwalls at (e) garages and 1st floor service spaces. add new laundry room at first floor. compyl w/ 2012 iebc appendix a-4.Details
mandated tier 3 seismic soft story upgrade. new foundation & shearwalls at (e) garages and 1st floor service spaces. add new laundry room at first floor. compyl w/ 2012 iebc appendix a-4. | $40,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- B-Side Inc. (13), Au Electric Corporation/Aec Alarms (2), G T M Works Llc Dba Greentree Maint, Redlog Flooring Services Corp, Vector Construction Inc.
- Architects
- Joe Win Kon
- Engineers
- Joe Win Kon (4), Joe Kon
- Designers
- Au
- Pmt consultant/expediters
- Roger Tsai
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.