Vector Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Aug 2008 to Mar 2021
- Last 24 months
- 0 permits filed
125 permits since 2000: 108 completed, 10 never finaled, 7 expired or cancelled.
Of the 10 never-finaled permits, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 125.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 18, 2021 | Completed final sign-off Sep 2021 | 661 Ellsworth St | revision to app#201912240659. permit for extg front steps to remain in place. no workDetails
revision to app#201912240659. permit for extg front steps to remain in place. no work | |
| Jan 27, 2021 | Completed final sign-off Jan 2022 | 53 14th Av | full bath remodel including new placement of tub/shower, sink & toilet. water closet replacing tile & toilet to be energy efficient. no wall demolition.Details
full bath remodel including new placement of tub/shower, sink & toilet. water closet replacing tile & toilet to be energy efficient. no wall demolition. | $10,000 |
| Sep 4, 2020 | Completed final sign-off Apr 2021 | 2454 30th Av | kitchen remodel- replace (e) cabinets, sink, dw, stove. add island, (n) lights. update bathroom. horizontal addition: convert 6 sq ft of (e) lightwell to living space. interior remodel. no changes to exterior.Details
kitchen remodel- replace (e) cabinets, sink, dw, stove. add island, (n) lights. update bathroom. horizontal addition: convert 6 sq ft of (e) lightwell to living space. interior remodel. no changes to exterior. | $50,000 |
| Mar 4, 2020 | Completed final sign-off Feb 2021 | 975 Jackson St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $90,000 |
| Dec 24, 2019 | Completed final sign-off Sep 2021 | 661 Ellsworth St | 1) first floor remodel to add 1 bedroom and 1 bath. 2)relocate front stairs to property line.Details
1) first floor remodel to add 1 bedroom and 1 bath. 2)relocate front stairs to property line. | $125,000 |
| Sep 23, 2019 | Completed final sign-off Sep 2020 | 1471 10th Av | interior remodel, 1st fl, add bdrm, playrm, ply rm, bath. 2nd fl remodel kitchen, relocate 1/2 bath, new deck w stairs less than 10 ft above grade, 3rd fl add mster bath, laundry rmDetails
interior remodel, 1st fl, add bdrm, playrm, ply rm, bath. 2nd fl remodel kitchen, relocate 1/2 bath, new deck w stairs less than 10 ft above grade, 3rd fl add mster bath, laundry rm | $300,000 |
| Aug 19, 2019 | Completed final sign-off Jan 2020 | 1790 27th Av | (residential)soft story retrofit upgraded in compliance with mandatory ordinance per sfbc chapter 4d. revision to app#201709137975 and 201709137980. change in moment frame location and connection details.Details
(residential)soft story retrofit upgraded in compliance with mandatory ordinance per sfbc chapter 4d. revision to app#201709137975 and 201709137980. change in moment frame location and connection details. | |
| Aug 16, 2019 | Completed final sign-off Jan 2020 | 1790 27th Av | revision to pa #201709137975 & 201709137980. soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial space.Details
revision to pa #201709137975 & 201709137980. soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial space. | |
| Jun 3, 2019 | Completed final sign-off Sep 2019 | 561 Arguello Bl | structural revision to soft story 201709148191Details
structural revision to soft story 201709148191 | |
| Apr 2, 2019 | Completed final sign-off Mar 2020 | 325 Marina Bl | voluntry strengthening on 1st floorDetails
voluntry strengthening on 1st floor | $80,000 |
| Feb 26, 2019 | Expired or cancelled cancelled Jan 2026 | 282 18th Av | revision to 201709137984 soft story retrofitDetails
revision to 201709137984 soft story retrofit | |
| Dec 3, 2018 | Completed final sign-off May 2020 | 395 31st Av | soft story sfebc chapter 4d cebc 2016 appx a4Details
soft story sfebc chapter 4d cebc 2016 appx a4 | $89,000 |
| May 30, 2018 | Completed final sign-off Mar 2019 | 977 Jackson St | mandated tier iii seismic soft story upgrade. new foundation & shearwalls at (e) basement service spaces/ soft story retrofit per sfbc chapter 4d 2016 iebc appx a4Details
mandated tier iii seismic soft story upgrade. new foundation & shearwalls at (e) basement service spaces/ soft story retrofit per sfbc chapter 4d 2016 iebc appx a4 | $80,000 |
| Apr 9, 2018 | Completed final sign-off Apr 2019 | 246 Stillings Av | replace deck at rear yard and add exterior stair from deck to rear yardDetails
replace deck at rear yard and add exterior stair from deck to rear yard | $10,000 |
| Nov 27, 2017 | Completed final sign-off Jul 2019 | 32 Lundys Ln | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. to comply with nov 201719791Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. to comply with nov 201719791 | $40,000 |
| Nov 27, 2017 | Completed final sign-off Aug 2019 | 1416 Broadway | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. to comply with nov 201714506Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. to comply with nov 201714506 | $75,000 |
| Nov 27, 2017 | Completed final sign-off Aug 2019 | 740 Monterey Bl | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. to comply with nov 201719791Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. to comply with nov 201719791 | $20,000 |
| Nov 27, 2017 | Completed final sign-off Oct 2019 | 815 Burnett Av | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. to comply with nov 201719791Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. to comply with nov 201719791 | $50,000 |
| Nov 1, 2017 | Completed final sign-off Jun 2018 | 44 Cervantes Bl | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 n/a for maherDetails
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 n/a for maher | $40,000 |
| Oct 27, 2017 | Completed final sign-off Mar 2018 | 270 Foote Av | remodel 2nd flr kitchen & bath by removing & replacing (e) cabinets, sinks, faucets.Details
remodel 2nd flr kitchen & bath by removing & replacing (e) cabinets, sinks, faucets. | $20,000 |
| Sep 14, 2017 | Completed final sign-off Mar 2018 | 270 Foote Av | renovation to (e) 1/f, add bathroom, bedroom, laundry, storage & office/media room to interior conditional space. no exterior work facing the street.Details
renovation to (e) 1/f, add bathroom, bedroom, laundry, storage & office/media room to interior conditional space. no exterior work facing the street. | $60,000 |
| Sep 14, 2017 | Completed final sign-off Sep 2019 | 561 Arguello Bl | soft story retrofit per sfebc chapter 4 engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4 engineering criteria 2016 cebc appendix a-4 | $85,000 |
| Sep 13, 2017 | Completed final sign-off May 2019 | 282 18th Av | soft story upgrade in compliance w/mandatory ordinance per sfebc chapter 4d, 2016 cebc appendix a-4.Details
soft story upgrade in compliance w/mandatory ordinance per sfebc chapter 4d, 2016 cebc appendix a-4. | $75,000 |
| Sep 13, 2017 | Completed final sign-off Oct 2019 | 268 Coleridge St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $50,000 |
| Sep 13, 2017 | Completed final sign-off Jan 2020 | 1790 27th Av | (e) commecial entrance in compliance w/ada no work (commercial portion) soft story upgrade for residential portionDetails
(e) commecial entrance in compliance w/ada no work (commercial portion) soft story upgrade for residential portion | $9,196 |
| Sep 13, 2017 | Completed final sign-off Jan 2020 | 1790 27th Av | soft story upgrade (residential portion)in compliance w/mandatory ordinance per sfebc chapter 4d, 2016 cebc appendix a-4. (commercial pa #201709137980)Details
soft story upgrade (residential portion)in compliance w/mandatory ordinance per sfebc chapter 4d, 2016 cebc appendix a-4. (commercial pa #201709137980) | $75,803 |
| Sep 8, 2017 | Completed final sign-off Mar 2020 | 1340 15th Av | replace (e) garage door & relocate side door. remove front planter.Details
replace (e) garage door & relocate side door. remove front planter. | $6,000 |
| Sep 6, 2017 | Completed final sign-off Jan 2018 | 1355 Bay St | revision to app#201602018478(adu) and 201602018471 previously approved structural plans missing from pulled job copies. n/a for maherDetails
revision to app#201602018478(adu) and 201602018471 previously approved structural plans missing from pulled job copies. n/a for maher | |
| Aug 23, 2017 | Completed final sign-off Oct 2018 | 562 Guerrero St | soft story upgrade - mandated tier 3, seismic per sfebc chapter 4d, 2016 cebc appendix a-4.Details
soft story upgrade - mandated tier 3, seismic per sfebc chapter 4d, 2016 cebc appendix a-4. | $35,000 |
| Aug 23, 2017 | Completed final sign-off Jul 2018 | 1995 Oak St | soft story upgrade - mandated tier 3, seismic, new foundations & shearwalls at (e) 1st floor spaces " soft story" retorfit per sfebc chapter 4d, 2016 cebc appendix a-4. n/a maher ordinanceDetails
soft story upgrade - mandated tier 3, seismic, new foundations & shearwalls at (e) 1st floor spaces " soft story" retorfit per sfebc chapter 4d, 2016 cebc appendix a-4. n/a maher ordinance | $35,000 |
| May 10, 2017 | Completed final sign-off Apr 2019 | 1100 Leavenworth St | mandated tier iii seismic (soft story) upgrade. new foundations & shear walls at (e) 1st floor services spaces soft story retrofit per sfebc ch 4d, 2016 cebc apendix a-4.Details
mandated tier iii seismic (soft story) upgrade. new foundations & shear walls at (e) 1st floor services spaces soft story retrofit per sfebc ch 4d, 2016 cebc apendix a-4. | $35,000 |
| May 8, 2017 | Completed final sign-off Jun 2017 | 4236 25th St | construction of new foundation element at rear of subject building.Details
construction of new foundation element at rear of subject building. | $14,000 |
| Apr 26, 2017 | Completed final sign-off Mar 2018 | 724 Vicente St | convert area behind garage on g/f of (e) 2 story residenceto habitable space, new rooms to include family room, bedroom, office and bathroom. all work within existing building envelope.Details
convert area behind garage on g/f of (e) 2 story residenceto habitable space, new rooms to include family room, bedroom, office and bathroom. all work within existing building envelope. | $70,000 |
| Mar 3, 2017 | Completed final sign-off Feb 2019 | 3079 Broderick St | seismic soft story retrofit per sfbc ch 4d, engineering criteria 2012 iebc appendex a-4. maher n/a.Details
seismic soft story retrofit per sfbc ch 4d, engineering criteria 2012 iebc appendex a-4. maher n/a. | $30,000 |
| Dec 14, 2016 | Completed final sign-off Sep 2017 | 161 Henry St | mandatory soft story retrofit per sfbc chapter 34b. 2012 iebc appendix a-4, new foundations & shearwalls at (e) 1/f service space.Details
mandatory soft story retrofit per sfbc chapter 34b. 2012 iebc appendix a-4, new foundations & shearwalls at (e) 1/f service space. | $35,000 |
| Nov 16, 2016 | Completed final sign-off Sep 2019 | 3179 23rd St | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $40,000 |
| Nov 3, 2016 | Completed final sign-off Nov 2018 | 3250 Webster St | mandated tier 4, seismic (soft story) upgrade new foundations & shearwalls @ existing 1st floor service spaces soft story retrofit per sfbc chapter 34b, 2012 iebc apprndix a-4. n/a maher ordinanceDetails
mandated tier 4, seismic (soft story) upgrade new foundations & shearwalls @ existing 1st floor service spaces soft story retrofit per sfbc chapter 34b, 2012 iebc apprndix a-4. n/a maher ordinance | $30,000 |
| Nov 3, 2016 | Completed final sign-off Jun 2017 | 545 Arguello Bl | mandated tier iii, seismic (soft story) upgrade, new foundations & shearwalls at existing 1st floor service spaces. soft story retrofit per sfbc chapter 34b: 2012 iebc appendix a-4.Details
mandated tier iii, seismic (soft story) upgrade, new foundations & shearwalls at existing 1st floor service spaces. soft story retrofit per sfbc chapter 34b: 2012 iebc appendix a-4. | $30,000 |
| Sep 6, 2016 | Completed final sign-off Dec 2017 | 269 Coleridge St | soft story retrofit per sfbc ch 34b: 2012 iebc appendix a-4. mandated tier iii seismic (soft story)upgrade. new foundations & shearwalls at (e) 1st flr service spaces.Details
soft story retrofit per sfbc ch 34b: 2012 iebc appendix a-4. mandated tier iii seismic (soft story)upgrade. new foundations & shearwalls at (e) 1st flr service spaces. | $30,000 |
| Aug 30, 2016 | Completed final sign-off Apr 2017 | 3665 Fillmore St | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. upgrade new foundation and shear walls at extg floor service spaces, "soft story retroft per sfbc ch. 34b:2012 iebc appendixDetails
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. upgrade new foundation and shear walls at extg floor service spaces, "soft story retroft per sfbc ch. 34b:2012 iebc appendix | $30,000 |
| Aug 30, 2016 | Completed final sign-off Feb 2017 | 3360 Octavia St | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4.Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. | $40,000 |
| Aug 12, 2016 | Completed final sign-off Feb 2018 | 144 Hugo St | soft story structural upgradeDetails
soft story structural upgrade | $75,000 |
| Jul 11, 2016 | Completed final sign-off Dec 2016 | 119 Broad St | mandated tier iii, seismic, soft story upgrade, new foundations & shear walls at existing 1/f space. soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4Details
mandated tier iii, seismic, soft story upgrade, new foundations & shear walls at existing 1/f space. soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 | $40,000 |
| May 2, 2016 | Completed final sign-off Feb 2017 | 1013 Noe St | seismic soft story upgrade 2012 iebc appendix a4Details
seismic soft story upgrade 2012 iebc appendix a4 | $50,000 |
| Mar 17, 2016 | Completed final sign-off Dec 2016 | 1499 Union St | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. maher naDetails
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. maher na | $70,000 |
| Feb 1, 2016 | Completed final sign-off Jan 2018 | 1355 Bay St | mandated tier iii seismic soft story upgrade. new foundations & shear walls at (e) ist flr. retrofit per sfbc chapter 34b. 2012 iebc appendix a-4. n/a for maher ordinance no. 155-13.Details
mandated tier iii seismic soft story upgrade. new foundations & shear walls at (e) ist flr. retrofit per sfbc chapter 34b. 2012 iebc appendix a-4. n/a for maher ordinance no. 155-13. | $40,000 |
| Feb 1, 2016 | Completed final sign-off Dec 2018 | 1355 Bay St | addition of dwelling units per ordinance no. 30.15. additional 1 bed/ i bath. dwelling unit added with shell enfronting bay st. n/a for maher ordinance no. 155-13.Details
addition of dwelling units per ordinance no. 30.15. additional 1 bed/ i bath. dwelling unit added with shell enfronting bay st. n/a for maher ordinance no. 155-13. | $50,000 |
| Jan 15, 2016 | Completed final sign-off Feb 2017 | 2635 16th Av | ground flr development & 75 sqft rear addition @ 1st flr to align rear wall w/ 2nd flr rear wall. ground fl work includes new family rm, master bedrm, bath, closets, laundry area, storage, 2 new ext sliding doors & replace concrete slab. 2nd flr inc 2 new windows,skylights & remove door to int.stairDetails
ground flr development & 75 sqft rear addition @ 1st flr to align rear wall w/ 2nd flr rear wall. ground fl work includes new family rm, master bedrm, bath, closets, laundry area, storage, 2 new ext sliding doors & replace concrete slab. 2nd flr inc 2 new windows,skylights & remove door to int.stair | $74,000 |
| Dec 14, 2015 | Never finaled issued Dec 2015, no final | 3618 Ortega St | install new 5/8" type x gypsum board an all interior walls & ceiling at ground floor garage area only. remove & replace (e)2nd floor kitchen cabinets, counter top and appliances, install new sheetrock in kitchen. no (n)wall & no (e)wall relocation. lighting in kitchen shall comply w/cec 150.0(k)10.Details
install new 5/8" type x gypsum board an all interior walls & ceiling at ground floor garage area only. remove & replace (e)2nd floor kitchen cabinets, counter top and appliances, install new sheetrock in kitchen. no (n)wall & no (e)wall relocation. lighting in kitchen shall comply w/cec 150.0(k)10. | $3,000 |
| Dec 2, 2015 | Completed final sign-off Feb 2017 | 690 Guerrero St | mandatory tier 3 seismic soft story upgrade. new foundation and shearwalls at extg 1st floor service spaces. "soft story" retrofit per sfbc ch 34b . 2012 iebc appendix a-4. n/a for maherDetails
mandatory tier 3 seismic soft story upgrade. new foundation and shearwalls at extg 1st floor service spaces. "soft story" retrofit per sfbc ch 34b . 2012 iebc appendix a-4. n/a for maher | $30,000 |
| Dec 2, 2015 | Completed final sign-off Jun 2016 | 1093 Dolores St | mandatory tier 3 seismic soft story upgrade. new foundation and shearwalls at extg 1st floor service spaces. "soft story" retrofit per sfbc ch 34b . 2012 iebc appendix a-4Details
mandatory tier 3 seismic soft story upgrade. new foundation and shearwalls at extg 1st floor service spaces. "soft story" retrofit per sfbc ch 34b . 2012 iebc appendix a-4 | $30,000 |
| Nov 9, 2015 | Completed final sign-off May 2016 | 1235 35th Av | build out ground floor area behind garage to provide new bedrooms and bathrooms. remodel kitchen. replace interior stairs. demo light well stairDetails
build out ground floor area behind garage to provide new bedrooms and bathrooms. remodel kitchen. replace interior stairs. demo light well stair | $100,000 |
| Oct 5, 2015 | Completed final sign-off Oct 2015 | 2621 Pacheco St | revision to pa 2015 0331 2441 - additional foundationDetails
revision to pa 2015 0331 2441 - additional foundation | |
| Aug 11, 2015 | Completed final sign-off Nov 2015 | 121 Day St | mandated "tier iii" seismic (soft story) upgrade, new foundations & shearwalls (e) 1st flr service spaces retrofit per sfbc chapter 34b; 2012 iebc appendix a-4.Details
mandated "tier iii" seismic (soft story) upgrade, new foundations & shearwalls (e) 1st flr service spaces retrofit per sfbc chapter 34b; 2012 iebc appendix a-4. | $30,000 |
| Aug 11, 2015 | Completed final sign-off Sep 2016 | 2772 Jackson St | mandated "tier iii" seismic (soft story) uprade, new foundation & shear walls as required. retrofit per sfbc chapter 34b; 2012 iebc appendix. ** maher: compliance with ordinance no# 155-13 not required **Details
mandated "tier iii" seismic (soft story) uprade, new foundation & shear walls as required. retrofit per sfbc chapter 34b; 2012 iebc appendix. ** maher: compliance with ordinance no# 155-13 not required ** | $40,000 |
| Jul 21, 2015 | Completed final sign-off Dec 2015 | 1714 28th Av | interior remodel - add one bedroom, one full bath & one study room, one storage at ground floor.Details
interior remodel - add one bedroom, one full bath & one study room, one storage at ground floor. | $30,000 |
| Jun 26, 2015 | Completed final sign-off May 2019 | 371 Coleridge St | remove (e) front porch & stair. enlarge (e) entry on north side by approximately 15 sf. raise roof height in area of (e) bedroom #2 to legalize ceiling height. enclose (e) sunrooms to create hat]bitable living space. raise roof height at rear portion of house, including sunrooms to provide min.Details
remove (e) front porch & stair. enlarge (e) entry on north side by approximately 15 sf. raise roof height in area of (e) bedroom #2 to legalize ceiling height. enclose (e) sunrooms to create hat]bitable living space. raise roof height at rear portion of house, including sunrooms to provide min. | $110,000 |
| Apr 30, 2015 | Completed final sign-off Oct 2021 | 73 Collingwood St | soft story retrofit - new foundations & shearwalls at (e) floor service spaces. per sfbc 34b 2012 iebc apprndix.Details
soft story retrofit - new foundations & shearwalls at (e) floor service spaces. per sfbc 34b 2012 iebc apprndix. | $30,000 |
| Apr 13, 2015 | Completed final sign-off Sep 2015 | 1401 20th Av | seismic soft story per sfbc chapter 34b 2012 iebcDetails
seismic soft story per sfbc chapter 34b 2012 iebc | $45,000 |
| Mar 31, 2015 | Completed final sign-off Oct 2015 | 2621 Pacheco St | create conditioned space at 1st floor garage shell. take away from garage create 2 bedrooms 1 bathroomDetails
create conditioned space at 1st floor garage shell. take away from garage create 2 bedrooms 1 bathroom | $35,000 |
| Mar 9, 2015 | Completed final sign-off May 2016 | 442 Munich St | remove undocumented kitchens at basement level and ground floor level per plan. to terminate both plumbing & electrical, seperate plumbing & electrical permits are required.Details
remove undocumented kitchens at basement level and ground floor level per plan. to terminate both plumbing & electrical, seperate plumbing & electrical permits are required. | $1,250 |
| Feb 20, 2015 | Completed final sign-off Jun 2015 | 75 Westgate Dr | convert unconditioned space on gr floor into family roomDetails
convert unconditioned space on gr floor into family room | $46,400 |
| Sep 29, 2014 | Completed final sign-off Apr 2015 | 3801 Market St | seismic soft story 2012 iebc chapter 34bDetails
seismic soft story 2012 iebc chapter 34b | $45,000 |
| Sep 19, 2014 | Completed final sign-off Oct 2014 | 1430 Francisco St | adding (new) foundation, there was no existinig footing & add one more shearwall. reference to 201403059899, comply with 200225376 item 1.Details
adding (new) foundation, there was no existinig footing & add one more shearwall. reference to 201403059899, comply with 200225376 item 1. | |
| Aug 27, 2014 | Completed final sign-off Dec 2014 | 170 Downey St | mandated tier iii seismic soft story upgrade, new foundations & shearwalls at (e) 1st floor service spaces. soft story retrofit per sfbc chapter 34b 2012 iebc appendix a-4.Details
mandated tier iii seismic soft story upgrade, new foundations & shearwalls at (e) 1st floor service spaces. soft story retrofit per sfbc chapter 34b 2012 iebc appendix a-4. | $30,000 |
| May 21, 2014 | Completed final sign-off Nov 2015 | 3150 Franklin St | mandated tier 3 seismic soft story upgrade. new foundation & shearwalls at (e) garages and 1st floor service spaces. add new laundry room at first floor. compyl w/ 2012 iebc appendix a-4.Details
mandated tier 3 seismic soft story upgrade. new foundation & shearwalls at (e) garages and 1st floor service spaces. add new laundry room at first floor. compyl w/ 2012 iebc appendix a-4. | $40,000 |
| Apr 22, 2014 | Completed final sign-off Apr 2014 | 225 Mallorca Wy | revision to permit #2013-0924-7569 - jobsite field condition change. update drawings for soft story retrofit per sfbc chapter 34b. 2012 iebc appendix a-4. compliance with ordinance #155-13 not requiredDetails
revision to permit #2013-0924-7569 - jobsite field condition change. update drawings for soft story retrofit per sfbc chapter 34b. 2012 iebc appendix a-4. compliance with ordinance #155-13 not required | |
| Apr 21, 2014 | Completed final sign-off Apr 2014 | 2447 Washington St | provide temporary support for deck above to replace damaged beam and post. remove and replace one 4x6 pressure treated post and beam. all replacement in like kind.Details
provide temporary support for deck above to replace damaged beam and post. remove and replace one 4x6 pressure treated post and beam. all replacement in like kind. | $1,000 |
| Feb 14, 2014 | Completed final sign-off Sep 2014 | 460 Dwight St | replace siding in lisht well approx. 150 sq. ft. ; re-roofing finishes approx. 800 sq. ft.Details
replace siding in lisht well approx. 150 sq. ft. ; re-roofing finishes approx. 800 sq. ft. | $10,000 |
| Feb 3, 2014 | Completed final sign-off Jun 2014 | 2082 10th Av | remodel kitchen, remove and replace cabinets, sink, appliances, etc. on upper level, no change in walls & opening layout. kitchen lighting shall have min 50% wattage being high efficacy.Details
remodel kitchen, remove and replace cabinets, sink, appliances, etc. on upper level, no change in walls & opening layout. kitchen lighting shall have min 50% wattage being high efficacy. | $11,000 |
| Dec 30, 2013 | Never finaled issued Jan 2014, no final | 4235 24th St | revision to 201310250255. omit posts, footings, and beams in front room. remove special inspection requirement for pull torque test for bolt into existing concreteDetails
revision to 201310250255. omit posts, footings, and beams in front room. remove special inspection requirement for pull torque test for bolt into existing concrete | |
| Dec 30, 2013 | Completed final sign-off Jan 2014 | 485 Potrero Av | install new ballister to existing deck and guardrail. install new handrail for 1 staircase. to comply with physical inspection report #cc-7370. repair not to exceed 50% of stairways/landing/decks railings & guards.Details
install new ballister to existing deck and guardrail. install new handrail for 1 staircase. to comply with physical inspection report #cc-7370. repair not to exceed 50% of stairways/landing/decks railings & guards. | $2,520 |
| Nov 7, 2013 | Expired or cancelled cancelled Jan 2014 | 1647 47th Av | repair staircase and landing deck boards with new 2 x 6 redwood. less than 50% visible from the streetDetails
repair staircase and landing deck boards with new 2 x 6 redwood. less than 50% visible from the street | $1,000 |
| Nov 4, 2013 | Never finaled issued Nov 2013, no final | 4235 24th St | replace (e) front door at ground leveloffice, (n) door to be 34"x96" all-wood, single-lite door by simpsom door co. or equal.Details
replace (e) front door at ground leveloffice, (n) door to be 34"x96" all-wood, single-lite door by simpsom door co. or equal. | $1,000 |
| Oct 25, 2013 | Completed final sign-off Apr 2014 | 4235 24th St | interior improvement to e gr fl commercial condiminium including remove 2 load bearing walls, add structural reinforcement, remodel 2 baths including 1 accessible. replace e kitchenette and replace all light fixturesDetails
interior improvement to e gr fl commercial condiminium including remove 2 load bearing walls, add structural reinforcement, remodel 2 baths including 1 accessible. replace e kitchenette and replace all light fixtures | $50,000 |
| Oct 2, 2013 | Completed final sign-off Dec 2013 | 1606 38th Av | garage shell space converted to habitable space including family room, home office area, bath & laundry.Details
garage shell space converted to habitable space including family room, home office area, bath & laundry. | $40,000 |
| Sep 24, 2013 | Completed final sign-off Apr 2014 | 225 Mallorca Wy | mandatory seismic upgrade to (e) 1st floor soft story (tier ii).Details
mandatory seismic upgrade to (e) 1st floor soft story (tier ii). | $60,000 |
| Sep 3, 2013 | Completed final sign-off Oct 2013 | 3151 Harrison St | install new moisture barrier and hardiplank siding on rear exterior wall.Details
install new moisture barrier and hardiplank siding on rear exterior wall. | $3,500 |
| Sep 3, 2013 | Completed final sign-off Nov 2013 | 2378 18th Av | kitchen remodel. remove and reinstall dishwasher, range, hood, refrigeratior , sink, faucet, disposal.Details
kitchen remodel. remove and reinstall dishwasher, range, hood, refrigeratior , sink, faucet, disposal. | $15,000 |
| Aug 21, 2013 | Completed final sign-off Sep 2013 | 1606 38th Av | demo kitchen & bath, remodel kitchen and bath. no alteration to partition wall.Details
demo kitchen & bath, remodel kitchen and bath. no alteration to partition wall. | $25,000 |
| Jun 26, 2013 | Completed final sign-off Jan 2014 | 517 Belvedere St | rebuild (e) wood stair in revised configuration that adds usable decks at 2nd & 3rd fl units.Details
rebuild (e) wood stair in revised configuration that adds usable decks at 2nd & 3rd fl units. | $20,000 |
| May 6, 2013 | Completed final sign-off Aug 2013 | 3427 Lincoln Wy | 2 kitchens: remove & replace cabinets, countertops, tiles, plumbing fixtures, electrical fixtures. 2 bathrooms: remove and replace shower, bathtub, vanity sinbk, light fixtures, tiles, exhaust fans, remove and replace two furnaces in garage. lighting in kitchen and bathroom shall comply w/ cec 150(kDetails
2 kitchens: remove & replace cabinets, countertops, tiles, plumbing fixtures, electrical fixtures. 2 bathrooms: remove and replace shower, bathtub, vanity sinbk, light fixtures, tiles, exhaust fans, remove and replace two furnaces in garage. lighting in kitchen and bathroom shall comply w/ cec 150(k | $20,000 |
| Apr 18, 2013 | Completed final sign-off May 2013 | 2431 46th Av | demo 3x7' of damaged exterior stucco wall; replace damaged raming, reapply stucco, repairs made to front exterior of homeDetails
demo 3x7' of damaged exterior stucco wall; replace damaged raming, reapply stucco, repairs made to front exterior of home | $2,500 |
| Nov 19, 2012 | Completed final sign-off Jan 2013 | 724 Vicente St | remodel extg kitchen, install new tiles, cabinets, counter tops, plmg fixtures and light fixtures, remodel 2 extg bathroom, install new tile, plmg and light fixtures.all installation on upper level.a min 50% kitchen permanent lighting. total wattage shall be high efficacy.Details
remodel extg kitchen, install new tiles, cabinets, counter tops, plmg fixtures and light fixtures, remodel 2 extg bathroom, install new tile, plmg and light fixtures.all installation on upper level.a min 50% kitchen permanent lighting. total wattage shall be high efficacy. | $27,300 |
| Nov 8, 2012 | Completed final sign-off Feb 2013 | 431 Christopher Dr | remodel existing kitchen, install new tiles, cabinets, counter tops, plumbing fixtures and light fixtu4res, 12x10'-6" lighting must comply cec 150(k)Details
remodel existing kitchen, install new tiles, cabinets, counter tops, plumbing fixtures and light fixtu4res, 12x10'-6" lighting must comply cec 150(k) | $8,000 |
| Sep 13, 2012 | Completed final sign-off Mar 2013 | 2378 18th Av | remodel basement to add media room, bedroo, bathroom, add cabinets to (e) pantry. add door and replace windows on (e) sunroom, all changes within (e) bldg envelop.Details
remodel basement to add media room, bedroo, bathroom, add cabinets to (e) pantry. add door and replace windows on (e) sunroom, all changes within (e) bldg envelop. | $70,000 |
| Dec 28, 2011 | Completed final sign-off Mar 2012 | 490 Kansas St | remodel (e) kitchen. install new cabinets, flooring, light fixtures & pluming fixtures. lighting to comply w/ cec 150 (k)Details
remodel (e) kitchen. install new cabinets, flooring, light fixtures & pluming fixtures. lighting to comply w/ cec 150 (k) | $15,000 |
| Dec 7, 2011 | Completed final sign-off Dec 2011 | 3831 17th St | remove and replace approximately 120 sf of siding at back of buildingDetails
remove and replace approximately 120 sf of siding at back of building | $3,500 |
| Sep 6, 2011 | Never finaled issued Sep 2011, no final | 1336 15th Av | remodel existing kitchen & bathroom, install new cabinets, flooring, light fixtures & plumbing fixtures.Details
remodel existing kitchen & bathroom, install new cabinets, flooring, light fixtures & plumbing fixtures. | $17,000 |
| Jul 20, 2011 | Expired or cancelled cancelled Jan 2012 | 538 40th Av | remove & replace 4 windows on both sides of house (max u factor 0.4)Details
remove & replace 4 windows on both sides of house (max u factor 0.4) | $2,000 |
| Jun 29, 2011 | Never finaled issued Jun 2011, no final | 85 Valmar Tr | remodel existing bathroom. remove & replace with new plumbing fixtures on 1st floor.Details
remodel existing bathroom. remove & replace with new plumbing fixtures on 1st floor. | $4,000 |
| Jun 20, 2011 | Never finaled issued Jun 2011, no final | 80 Pinehurst Wy | remove & replace with 6 vinyl windows on 2/f rear wall. not visable from street, u factor: 0.40 max.Details
remove & replace with 6 vinyl windows on 2/f rear wall. not visable from street, u factor: 0.40 max. | $2,700 |
| Jun 16, 2011 | Completed final sign-off Oct 2011 | 1570 Plymouth Av | remove window in porch. modify landing and steps at frontDetails
remove window in porch. modify landing and steps at front | $9,000 |
| Apr 29, 2011 | Completed final sign-off May 2011 | 1847 41st Av | new deck at rear of (e) 2-story residence. new 8068 sliding door & 4040 sliding window at existing sunroom.Details
new deck at rear of (e) 2-story residence. new 8068 sliding door & 4040 sliding window at existing sunroom. | $8,000 |
| Apr 26, 2011 | Completed final sign-off Aug 2011 | 2586 29th Av | remodel kitchen. replace with new cabinets, countertops, floor tiles, light fixtures and plumbing fixtures. all (n) lighting must comply with cec 150(k)Details
remodel kitchen. replace with new cabinets, countertops, floor tiles, light fixtures and plumbing fixtures. all (n) lighting must comply with cec 150(k) | $8,000 |
| Apr 25, 2011 | Completed final sign-off Jul 2011 | 3014 Ulloa St | remodel 1 kitchen: remove & replace w/ new cabinets, counter tops, floor tiles, light fixts & plumbing fixts. lighting to cec 150 (k). no change wall window or doors.Details
remodel 1 kitchen: remove & replace w/ new cabinets, counter tops, floor tiles, light fixts & plumbing fixts. lighting to cec 150 (k). no change wall window or doors. | $9,000 |
| Apr 6, 2011 | Never finaled issued Apr 2011, no final | 1219 05th Av | reroofingDetails
reroofing | $4,000 |
| Mar 3, 2011 | Completed final sign-off Mar 2011 | 3695 Market St | revision to pa# 2009.03.10.3736 to eliminate entire scope of work at basement and first floor under this approved/issued permit. work only to repair existing rear deck on 2nd floor.Details
revision to pa# 2009.03.10.3736 to eliminate entire scope of work at basement and first floor under this approved/issued permit. work only to repair existing rear deck on 2nd floor. | |
| Feb 11, 2011 | Completed final sign-off May 2011 | 727 26th Av | remodel kitchen, replace (e) w/ new cabinets, countertop, floor tiles, light fixtures and plumbing fixtures.Details
remodel kitchen, replace (e) w/ new cabinets, countertop, floor tiles, light fixtures and plumbing fixtures. | $7,000 |
| Jan 31, 2011 | Completed final sign-off Feb 2011 | 1882 25th Av | remove & replace approximately 100 sq. ft of stucco in front , replace in kindDetails
remove & replace approximately 100 sq. ft of stucco in front , replace in kind | $2,500 |