Back to kitchen remodel contractors
Vector Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Aug 2008 to Mar 2021
- Last 24 months
- 0 permits filed
125 permits since 2000: 108 completed, 10 never finaled, 7 expired or cancelled.
Of the 10 never-finaled permits, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
25 kitchen remodel permits: 21 completed, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 127 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2020 | Completed final sign-off Apr 2021 | 2454 30th Av | kitchen remodel- replace (e) cabinets, sink, dw, stove. add island, (n) lights. update bathroom. horizontal addition: convert 6 sq ft of (e) lightwell to living space. interior remodel. no changes to exterior.Details
kitchen remodel- replace (e) cabinets, sink, dw, stove. add island, (n) lights. update bathroom. horizontal addition: convert 6 sq ft of (e) lightwell to living space. interior remodel. no changes to exterior. | $50,000 |
| Sep 23, 2019 | Completed final sign-off Sep 2020 | 1471 10th Av | interior remodel, 1st fl, add bdrm, playrm, ply rm, bath. 2nd fl remodel kitchen, relocate 1/2 bath, new deck w stairs less than 10 ft above grade, 3rd fl add mster bath, laundry rmDetails
interior remodel, 1st fl, add bdrm, playrm, ply rm, bath. 2nd fl remodel kitchen, relocate 1/2 bath, new deck w stairs less than 10 ft above grade, 3rd fl add mster bath, laundry rm | $300,000 |
| Oct 27, 2017 | Completed final sign-off Mar 2018 | 270 Foote Av | remodel 2nd flr kitchen & bath by removing & replacing (e) cabinets, sinks, faucets.Details
remodel 2nd flr kitchen & bath by removing & replacing (e) cabinets, sinks, faucets. | $20,000 |
| Dec 14, 2015 | Never finaled issued Dec 2015, no final | 3618 Ortega St | install new 5/8" type x gypsum board an all interior walls & ceiling at ground floor garage area only. remove & replace (e)2nd floor kitchen cabinets, counter top and appliances, install new sheetrock in kitchen. no (n)wall & no (e)wall relocation. lighting in kitchen shall comply w/cec 150.0(k)10.Details
install new 5/8" type x gypsum board an all interior walls & ceiling at ground floor garage area only. remove & replace (e)2nd floor kitchen cabinets, counter top and appliances, install new sheetrock in kitchen. no (n)wall & no (e)wall relocation. lighting in kitchen shall comply w/cec 150.0(k)10. | $3,000 |
| Nov 9, 2015 | Completed final sign-off May 2016 | 1235 35th Av | build out ground floor area behind garage to provide new bedrooms and bathrooms. remodel kitchen. replace interior stairs. demo light well stairDetails
build out ground floor area behind garage to provide new bedrooms and bathrooms. remodel kitchen. replace interior stairs. demo light well stair | $100,000 |
| Mar 9, 2015 | Completed final sign-off May 2016 | 442 Munich St | remove undocumented kitchens at basement level and ground floor level per plan. to terminate both plumbing & electrical, seperate plumbing & electrical permits are required.Details
remove undocumented kitchens at basement level and ground floor level per plan. to terminate both plumbing & electrical, seperate plumbing & electrical permits are required. | $1,250 |
| Feb 3, 2014 | Completed final sign-off Jun 2014 | 2082 10th Av | remodel kitchen, remove and replace cabinets, sink, appliances, etc. on upper level, no change in walls & opening layout. kitchen lighting shall have min 50% wattage being high efficacy.Details
remodel kitchen, remove and replace cabinets, sink, appliances, etc. on upper level, no change in walls & opening layout. kitchen lighting shall have min 50% wattage being high efficacy. | $11,000 |
| Oct 25, 2013 | Completed final sign-off Apr 2014 | 4235 24th St | interior improvement to e gr fl commercial condiminium including remove 2 load bearing walls, add structural reinforcement, remodel 2 baths including 1 accessible. replace e kitchenette and replace all light fixturesDetails
interior improvement to e gr fl commercial condiminium including remove 2 load bearing walls, add structural reinforcement, remodel 2 baths including 1 accessible. replace e kitchenette and replace all light fixtures | $50,000 |
| Sep 3, 2013 | Completed final sign-off Nov 2013 | 2378 18th Av | kitchen remodel. remove and reinstall dishwasher, range, hood, refrigeratior , sink, faucet, disposal.Details
kitchen remodel. remove and reinstall dishwasher, range, hood, refrigeratior , sink, faucet, disposal. | $15,000 |
| Aug 21, 2013 | Completed final sign-off Sep 2013 | 1606 38th Av | demo kitchen & bath, remodel kitchen and bath. no alteration to partition wall.Details
demo kitchen & bath, remodel kitchen and bath. no alteration to partition wall. | $25,000 |
| May 6, 2013 | Completed final sign-off Aug 2013 | 3427 Lincoln Wy | 2 kitchens: remove & replace cabinets, countertops, tiles, plumbing fixtures, electrical fixtures. 2 bathrooms: remove and replace shower, bathtub, vanity sinbk, light fixtures, tiles, exhaust fans, remove and replace two furnaces in garage. lighting in kitchen and bathroom shall comply w/ cec 150(kDetails
2 kitchens: remove & replace cabinets, countertops, tiles, plumbing fixtures, electrical fixtures. 2 bathrooms: remove and replace shower, bathtub, vanity sinbk, light fixtures, tiles, exhaust fans, remove and replace two furnaces in garage. lighting in kitchen and bathroom shall comply w/ cec 150(k | $20,000 |
| Nov 19, 2012 | Completed final sign-off Jan 2013 | 724 Vicente St | remodel extg kitchen, install new tiles, cabinets, counter tops, plmg fixtures and light fixtures, remodel 2 extg bathroom, install new tile, plmg and light fixtures.all installation on upper level.a min 50% kitchen permanent lighting. total wattage shall be high efficacy.Details
remodel extg kitchen, install new tiles, cabinets, counter tops, plmg fixtures and light fixtures, remodel 2 extg bathroom, install new tile, plmg and light fixtures.all installation on upper level.a min 50% kitchen permanent lighting. total wattage shall be high efficacy. | $27,300 |
| Nov 8, 2012 | Completed final sign-off Feb 2013 | 431 Christopher Dr | remodel existing kitchen, install new tiles, cabinets, counter tops, plumbing fixtures and light fixtu4res, 12x10'-6" lighting must comply cec 150(k)Details
remodel existing kitchen, install new tiles, cabinets, counter tops, plumbing fixtures and light fixtu4res, 12x10'-6" lighting must comply cec 150(k) | $8,000 |
| Dec 28, 2011 | Completed final sign-off Mar 2012 | 490 Kansas St | remodel (e) kitchen. install new cabinets, flooring, light fixtures & pluming fixtures. lighting to comply w/ cec 150 (k)Details
remodel (e) kitchen. install new cabinets, flooring, light fixtures & pluming fixtures. lighting to comply w/ cec 150 (k) | $15,000 |
| Sep 6, 2011 | Never finaled issued Sep 2011, no final | 1336 15th Av | remodel existing kitchen & bathroom, install new cabinets, flooring, light fixtures & plumbing fixtures.Details
remodel existing kitchen & bathroom, install new cabinets, flooring, light fixtures & plumbing fixtures. | $17,000 |
| Apr 26, 2011 | Completed final sign-off Aug 2011 | 2586 29th Av | remodel kitchen. replace with new cabinets, countertops, floor tiles, light fixtures and plumbing fixtures. all (n) lighting must comply with cec 150(k)Details
remodel kitchen. replace with new cabinets, countertops, floor tiles, light fixtures and plumbing fixtures. all (n) lighting must comply with cec 150(k) | $8,000 |
| Apr 25, 2011 | Completed final sign-off Jul 2011 | 3014 Ulloa St | remodel 1 kitchen: remove & replace w/ new cabinets, counter tops, floor tiles, light fixts & plumbing fixts. lighting to cec 150 (k). no change wall window or doors.Details
remodel 1 kitchen: remove & replace w/ new cabinets, counter tops, floor tiles, light fixts & plumbing fixts. lighting to cec 150 (k). no change wall window or doors. | $9,000 |
| Feb 11, 2011 | Completed final sign-off May 2011 | 727 26th Av | remodel kitchen, replace (e) w/ new cabinets, countertop, floor tiles, light fixtures and plumbing fixtures.Details
remodel kitchen, replace (e) w/ new cabinets, countertop, floor tiles, light fixtures and plumbing fixtures. | $7,000 |
| Sep 30, 2010 | Never finaled issued Sep 2010, no final | 1007 Shotwell St | remodel extg one kitchen. install new cabinets, countertop, tiles, and drywall. new electrical and plumbing fixtures. non structural.Details
remodel extg one kitchen. install new cabinets, countertop, tiles, and drywall. new electrical and plumbing fixtures. non structural. | $9,200 |
| Jun 28, 2010 | Completed final sign-off Aug 2011 | 10 Dearborn St | (4) apt units -#3463,#10,#12,#14. int remodel,demo some wall, remove lath/plaster,new gyp bd thru out. kitchen & bath remodel w/(n) fixtures,equip,finish. new hvac sys,new lighting,power,new stru work @#14 & assoc posts/shear/footing. new 2-hrs wall @ stairwell,(n) ext wd windows & garage doors.Details
(4) apt units -#3463,#10,#12,#14. int remodel,demo some wall, remove lath/plaster,new gyp bd thru out. kitchen & bath remodel w/(n) fixtures,equip,finish. new hvac sys,new lighting,power,new stru work @#14 & assoc posts/shear/footing. new 2-hrs wall @ stairwell,(n) ext wd windows & garage doors. | $260,000 |
| Dec 8, 2009 | Completed final sign-off Aug 2011 | 3461 17th St | upgrade electrical & plumbing, replace kitchen & bathroom in kind, add new appliances, replace plumbing fixtures & tile floor & walls in bathroom. new lighting. no adding or removing walls. door work does not include front or secondary exit to units; possible window work will be field verified by fdDetails
upgrade electrical & plumbing, replace kitchen & bathroom in kind, add new appliances, replace plumbing fixtures & tile floor & walls in bathroom. new lighting. no adding or removing walls. door work does not include front or secondary exit to units; possible window work will be field verified by fd | $90,000 |
| May 1, 2009 | Completed final sign-off Sep 2009 | 227 Surrey St | remodel existing kitchen. install new cabinets, tile, flooring, countertop & appliances. area 10' x 10'. new lighting & upgrade electrical. min 50% of kitchen light wattage shall be high efficancy.Details
remodel existing kitchen. install new cabinets, tile, flooring, countertop & appliances. area 10' x 10'. new lighting & upgrade electrical. min 50% of kitchen light wattage shall be high efficancy. | $18,339 |
| Feb 6, 2009 | Completed final sign-off Mar 2009 | 2839 39th Av | remodel existing (1) kitchen and (1) bathroom. install new cabinet and countertop. replace plumbing and electrical fixtures.Details
remodel existing (1) kitchen and (1) bathroom. install new cabinet and countertop. replace plumbing and electrical fixtures. | $15,000 |
| Dec 15, 2008 | Expired or cancelled expired Jan 2010 | 352 Richland Av | remodel existin gkitchen & bathroom.Details
remodel existin gkitchen & bathroom. | $25,000 |
| Dec 15, 2008 | Completed final sign-off Dec 2009 | 14 Dearborn St | remodel existing 1 kitchen & 1 bathroomDetails
remodel existing 1 kitchen & 1 bathroom | $20,000 |