Back to bathroom remodel contractors
Vector Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Aug 2008 to Mar 2021
- Last 24 months
- 0 permits filed
125 permits since 2000: 108 completed, 10 never finaled, 7 expired or cancelled.
Of the 10 never-finaled permits, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
31 bathroom remodel permits: 26 completed, 2 never finaled, 3 expired or cancelled. Typically 1 days from filing to permit and 164 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 27, 2021 | Completed final sign-off Jan 2022 | 53 14th Av | full bath remodel including new placement of tub/shower, sink & toilet. water closet replacing tile & toilet to be energy efficient. no wall demolition.Details
full bath remodel including new placement of tub/shower, sink & toilet. water closet replacing tile & toilet to be energy efficient. no wall demolition. | $10,000 |
| Sep 4, 2020 | Completed final sign-off Apr 2021 | 2454 30th Av | kitchen remodel- replace (e) cabinets, sink, dw, stove. add island, (n) lights. update bathroom. horizontal addition: convert 6 sq ft of (e) lightwell to living space. interior remodel. no changes to exterior.Details
kitchen remodel- replace (e) cabinets, sink, dw, stove. add island, (n) lights. update bathroom. horizontal addition: convert 6 sq ft of (e) lightwell to living space. interior remodel. no changes to exterior. | $50,000 |
| Dec 24, 2019 | Completed final sign-off Sep 2021 | 661 Ellsworth St | 1) first floor remodel to add 1 bedroom and 1 bath. 2)relocate front stairs to property line.Details
1) first floor remodel to add 1 bedroom and 1 bath. 2)relocate front stairs to property line. | $125,000 |
| Sep 23, 2019 | Completed final sign-off Sep 2020 | 1471 10th Av | interior remodel, 1st fl, add bdrm, playrm, ply rm, bath. 2nd fl remodel kitchen, relocate 1/2 bath, new deck w stairs less than 10 ft above grade, 3rd fl add mster bath, laundry rmDetails
interior remodel, 1st fl, add bdrm, playrm, ply rm, bath. 2nd fl remodel kitchen, relocate 1/2 bath, new deck w stairs less than 10 ft above grade, 3rd fl add mster bath, laundry rm | $300,000 |
| Oct 27, 2017 | Completed final sign-off Mar 2018 | 270 Foote Av | remodel 2nd flr kitchen & bath by removing & replacing (e) cabinets, sinks, faucets.Details
remodel 2nd flr kitchen & bath by removing & replacing (e) cabinets, sinks, faucets. | $20,000 |
| Sep 14, 2017 | Completed final sign-off Mar 2018 | 270 Foote Av | renovation to (e) 1/f, add bathroom, bedroom, laundry, storage & office/media room to interior conditional space. no exterior work facing the street.Details
renovation to (e) 1/f, add bathroom, bedroom, laundry, storage & office/media room to interior conditional space. no exterior work facing the street. | $60,000 |
| Apr 26, 2017 | Completed final sign-off Mar 2018 | 724 Vicente St | convert area behind garage on g/f of (e) 2 story residenceto habitable space, new rooms to include family room, bedroom, office and bathroom. all work within existing building envelope.Details
convert area behind garage on g/f of (e) 2 story residenceto habitable space, new rooms to include family room, bedroom, office and bathroom. all work within existing building envelope. | $70,000 |
| Feb 1, 2016 | Completed final sign-off Dec 2018 | 1355 Bay St | addition of dwelling units per ordinance no. 30.15. additional 1 bed/ i bath. dwelling unit added with shell enfronting bay st. n/a for maher ordinance no. 155-13.Details
addition of dwelling units per ordinance no. 30.15. additional 1 bed/ i bath. dwelling unit added with shell enfronting bay st. n/a for maher ordinance no. 155-13. | $50,000 |
| Jan 15, 2016 | Completed final sign-off Feb 2017 | 2635 16th Av | ground flr development & 75 sqft rear addition @ 1st flr to align rear wall w/ 2nd flr rear wall. ground fl work includes new family rm, master bedrm, bath, closets, laundry area, storage, 2 new ext sliding doors & replace concrete slab. 2nd flr inc 2 new windows,skylights & remove door to int.stairDetails
ground flr development & 75 sqft rear addition @ 1st flr to align rear wall w/ 2nd flr rear wall. ground fl work includes new family rm, master bedrm, bath, closets, laundry area, storage, 2 new ext sliding doors & replace concrete slab. 2nd flr inc 2 new windows,skylights & remove door to int.stair | $74,000 |
| Nov 9, 2015 | Completed final sign-off May 2016 | 1235 35th Av | build out ground floor area behind garage to provide new bedrooms and bathrooms. remodel kitchen. replace interior stairs. demo light well stairDetails
build out ground floor area behind garage to provide new bedrooms and bathrooms. remodel kitchen. replace interior stairs. demo light well stair | $100,000 |
| Jul 21, 2015 | Completed final sign-off Dec 2015 | 1714 28th Av | interior remodel - add one bedroom, one full bath & one study room, one storage at ground floor.Details
interior remodel - add one bedroom, one full bath & one study room, one storage at ground floor. | $30,000 |
| Mar 31, 2015 | Completed final sign-off Oct 2015 | 2621 Pacheco St | create conditioned space at 1st floor garage shell. take away from garage create 2 bedrooms 1 bathroomDetails
create conditioned space at 1st floor garage shell. take away from garage create 2 bedrooms 1 bathroom | $35,000 |
| Oct 25, 2013 | Completed final sign-off Apr 2014 | 4235 24th St | interior improvement to e gr fl commercial condiminium including remove 2 load bearing walls, add structural reinforcement, remodel 2 baths including 1 accessible. replace e kitchenette and replace all light fixturesDetails
interior improvement to e gr fl commercial condiminium including remove 2 load bearing walls, add structural reinforcement, remodel 2 baths including 1 accessible. replace e kitchenette and replace all light fixtures | $50,000 |
| Oct 2, 2013 | Completed final sign-off Dec 2013 | 1606 38th Av | garage shell space converted to habitable space including family room, home office area, bath & laundry.Details
garage shell space converted to habitable space including family room, home office area, bath & laundry. | $40,000 |
| Aug 21, 2013 | Completed final sign-off Sep 2013 | 1606 38th Av | demo kitchen & bath, remodel kitchen and bath. no alteration to partition wall.Details
demo kitchen & bath, remodel kitchen and bath. no alteration to partition wall. | $25,000 |
| May 6, 2013 | Completed final sign-off Aug 2013 | 3427 Lincoln Wy | 2 kitchens: remove & replace cabinets, countertops, tiles, plumbing fixtures, electrical fixtures. 2 bathrooms: remove and replace shower, bathtub, vanity sinbk, light fixtures, tiles, exhaust fans, remove and replace two furnaces in garage. lighting in kitchen and bathroom shall comply w/ cec 150(kDetails
2 kitchens: remove & replace cabinets, countertops, tiles, plumbing fixtures, electrical fixtures. 2 bathrooms: remove and replace shower, bathtub, vanity sinbk, light fixtures, tiles, exhaust fans, remove and replace two furnaces in garage. lighting in kitchen and bathroom shall comply w/ cec 150(k | $20,000 |
| Nov 19, 2012 | Completed final sign-off Jan 2013 | 724 Vicente St | remodel extg kitchen, install new tiles, cabinets, counter tops, plmg fixtures and light fixtures, remodel 2 extg bathroom, install new tile, plmg and light fixtures.all installation on upper level.a min 50% kitchen permanent lighting. total wattage shall be high efficacy.Details
remodel extg kitchen, install new tiles, cabinets, counter tops, plmg fixtures and light fixtures, remodel 2 extg bathroom, install new tile, plmg and light fixtures.all installation on upper level.a min 50% kitchen permanent lighting. total wattage shall be high efficacy. | $27,300 |
| Sep 13, 2012 | Completed final sign-off Mar 2013 | 2378 18th Av | remodel basement to add media room, bedroo, bathroom, add cabinets to (e) pantry. add door and replace windows on (e) sunroom, all changes within (e) bldg envelop.Details
remodel basement to add media room, bedroo, bathroom, add cabinets to (e) pantry. add door and replace windows on (e) sunroom, all changes within (e) bldg envelop. | $70,000 |
| Sep 6, 2011 | Never finaled issued Sep 2011, no final | 1336 15th Av | remodel existing kitchen & bathroom, install new cabinets, flooring, light fixtures & plumbing fixtures.Details
remodel existing kitchen & bathroom, install new cabinets, flooring, light fixtures & plumbing fixtures. | $17,000 |
| Jun 29, 2011 | Never finaled issued Jun 2011, no final | 85 Valmar Tr | remodel existing bathroom. remove & replace with new plumbing fixtures on 1st floor.Details
remodel existing bathroom. remove & replace with new plumbing fixtures on 1st floor. | $4,000 |
| Dec 1, 2010 | Completed final sign-off Feb 2011 | 15 Lisbon St | add guest room, laundry room & a full bath on ground floor. compliant #201059829.Details
add guest room, laundry room & a full bath on ground floor. compliant #201059829. | $15,000 |
| Jun 28, 2010 | Completed final sign-off Aug 2011 | 10 Dearborn St | (4) apt units -#3463,#10,#12,#14. int remodel,demo some wall, remove lath/plaster,new gyp bd thru out. kitchen & bath remodel w/(n) fixtures,equip,finish. new hvac sys,new lighting,power,new stru work @#14 & assoc posts/shear/footing. new 2-hrs wall @ stairwell,(n) ext wd windows & garage doors.Details
(4) apt units -#3463,#10,#12,#14. int remodel,demo some wall, remove lath/plaster,new gyp bd thru out. kitchen & bath remodel w/(n) fixtures,equip,finish. new hvac sys,new lighting,power,new stru work @#14 & assoc posts/shear/footing. new 2-hrs wall @ stairwell,(n) ext wd windows & garage doors. | $260,000 |
| May 24, 2010 | Expired or cancelled expired Jan 2013 | 2082 10th Av | remodel existing bathroom, replace plumbing fixtures, lay tiles on floor & walls, high efficacy or occupancy sensor control lightingDetails
remodel existing bathroom, replace plumbing fixtures, lay tiles on floor & walls, high efficacy or occupancy sensor control lighting | $13,405 |
| Dec 8, 2009 | Completed final sign-off Aug 2011 | 3461 17th St | upgrade electrical & plumbing, replace kitchen & bathroom in kind, add new appliances, replace plumbing fixtures & tile floor & walls in bathroom. new lighting. no adding or removing walls. door work does not include front or secondary exit to units; possible window work will be field verified by fdDetails
upgrade electrical & plumbing, replace kitchen & bathroom in kind, add new appliances, replace plumbing fixtures & tile floor & walls in bathroom. new lighting. no adding or removing walls. door work does not include front or secondary exit to units; possible window work will be field verified by fd | $90,000 |
| Aug 11, 2009 | Expired or cancelled expired May 2015 | 2191 34th Av | remodel (e) bathroom. new plumbing & electrical fixtures.Details
remodel (e) bathroom. new plumbing & electrical fixtures. | $9,000 |
| Jun 25, 2009 | Completed final sign-off Sep 2009 | 17 Newburg St | remodel existing bathroom on 2nd fl. replace tiles & fixtures.Details
remodel existing bathroom on 2nd fl. replace tiles & fixtures. | $5,500 |
| Feb 6, 2009 | Completed final sign-off Mar 2009 | 2839 39th Av | remodel existing (1) kitchen and (1) bathroom. install new cabinet and countertop. replace plumbing and electrical fixtures.Details
remodel existing (1) kitchen and (1) bathroom. install new cabinet and countertop. replace plumbing and electrical fixtures. | $15,000 |
| Jan 28, 2009 | Completed final sign-off Feb 2009 | 37 Tioga Av | remodel existing bathroom at 2nd floor which includes replace existing bathroom features, replace tiles and paint walls. no structural work and no removal or relocation of existing partition wall.Details
remodel existing bathroom at 2nd floor which includes replace existing bathroom features, replace tiles and paint walls. no structural work and no removal or relocation of existing partition wall. | $3,800 |
| Dec 15, 2008 | Expired or cancelled expired Jan 2010 | 352 Richland Av | remodel existin gkitchen & bathroom.Details
remodel existin gkitchen & bathroom. | $25,000 |
| Dec 15, 2008 | Completed final sign-off Dec 2009 | 14 Dearborn St | remodel existing 1 kitchen & 1 bathroomDetails
remodel existing 1 kitchen & 1 bathroom | $20,000 |
| Aug 29, 2008 | Completed final sign-off Jan 2009 | 571 Munich St | add 2 bedrooms, 1 full bathroom, 1 storage room and 1 story deck (5'x5') on existing ground floor.Details
add 2 bedrooms, 1 full bathroom, 1 storage room and 1 story deck (5'x5') on existing ground floor. | $24,000 |