Block 0443A, lot 005
44 Cervantes Blvd
- City’s use
- Multi-Family Residential
- Built
- 1928
- Stories
- 3
- Units
- 18
- Rooms
- 18 bathrooms
- Building
- 17,679 sq ft
- Lot
- 6,381 sq ft
- Zoning
- RM3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
14 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 7, 2025 | Completed final sign-off Jan 2026 | 44 Cervantes Bl | Jv Services | unit#104: remodel kitchen in kind. new cabinets, new fridge, new stove, new electrical circuits, new outlets and switches. approx. 96 sq ft.Details
unit#104: remodel kitchen in kind. new cabinets, new fridge, new stove, new electrical circuits, new outlets and switches. approx. 96 sq ft. | $25,000 |
| Apr 24, 2025 | Completed final sign-off Oct 2025 | 44 Cervantes Bl | United Systems Fire And Security Llc | adding 30 wallmount low frequency in the sleeping units in accordance w/sf admin bulletin 3.08 (1) booster power supply 6 ampDetails
adding 30 wallmount low frequency in the sleeping units in accordance w/sf admin bulletin 3.08 (1) booster power supply 6 amp | $15,233 |
| Mar 5, 2025 | Completed final sign-off Jun 2025 | 44 Cervantes Bl | Jv Services | unit 206: demolition of kitchen and bathroom. redo new kitchen and bath in kind. new appliances, new paintDetails
unit 206: demolition of kitchen and bathroom. redo new kitchen and bath in kind. new appliances, new paint | $25,000 |
| Sep 23, 2022 | Completed final sign-off Jan 2023 | 44 Cervantes Bl | Jv Services | one kitchen and one bathroom: unit #203: demo of kitchen cabinets, counters. demo of toilet, vanity, wall tile and floor tile in bathroom. replace with new fixtures, upgrade electrical subpanel.Details
one kitchen and one bathroom: unit #203: demo of kitchen cabinets, counters. demo of toilet, vanity, wall tile and floor tile in bathroom. replace with new fixtures, upgrade electrical subpanel. | $25,000 |
| Mar 29, 2022 | Completed final sign-off Jun 2022 | 44 Cervantes Bl | Jv Services | remove stucco from section of front of building. reinstall new stucco.Details
remove stucco from section of front of building. reinstall new stucco. | $8,000 |
| Apr 1, 2021 | Never finaled issued Apr 2021, no final | 44 Cervantes Bl | Jv Services | emolition of tub. shower wall tile. install new shower valve, new tub, surrface tile new sink and toilet. demolition of kitchen cabinets, upgrade electrical for kitchen. install new cabinets counters and appliances. upgrade electrical subpanel.Details
emolition of tub. shower wall tile. install new shower valve, new tub, surrface tile new sink and toilet. demolition of kitchen cabinets, upgrade electrical for kitchen. install new cabinets counters and appliances. upgrade electrical subpanel. | $22,000 |
| Dec 18, 2020 | Never finaled issued Dec 2020, no final | 44 Cervantes Bl | Norcal Painting & Remodeling | remodel kitchen, cabinets and counter tops, no wall relocation, all new lighting shall comply with cec 150(k)3Details
remodel kitchen, cabinets and counter tops, no wall relocation, all new lighting shall comply with cec 150(k)3 | $12,000 |
| Sep 12, 2018 | Never finaled issued Sep 2018, no final | 44 Cervantes Bl | Norcal Painting & Remodeling | remodel of kitchen, bathroom and new electrical subpanel, cabinets, lighting, faucets, tub, tileDetails
remodel of kitchen, bathroom and new electrical subpanel, cabinets, lighting, faucets, tub, tile | $18,000 |
| Jul 17, 2018 | Never finaled issued Jul 2018, no final | 44 Cervantes Bl | street spaceDetails
street space | ||
| Apr 18, 2018 | Completed final sign-off Aug 2018 | 44 Cervantes Bl | window installation. one window replacement steel sash casement at sides and fixed at center in existing opening to match historic windows. maintain emergency/rescue window at bedroom.Details
window installation. one window replacement steel sash casement at sides and fixed at center in existing opening to match historic windows. maintain emergency/rescue window at bedroom. | $13,000 | |
| Mar 9, 2018 | Never finaled issued Mar 2018, no final | 44 Cervantes Bl | street spaceDetails
street space | ||
| Nov 1, 2017 | Completed final sign-off Jun 2018 | 44 Cervantes Bl | Vector Construction Inc. | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 n/a for maherDetails
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 n/a for maher | $40,000 |
| Feb 7, 2017 | Completed final sign-off May 2017 | 44 Cervantes Bl | Norcal Painting & Remodeling | remodel kitchen and bathroom at unit #204Details
remodel kitchen and bathroom at unit #204 | $12,000 |
| Mar 23, 2016 | Never finaled issued Mar 2016, no final | 44 Cervantes Bl | Norcal Painting & Remodeling | unit 101: remodel kitchen & bathroom; unit 102: remodel bathroom; to comply with 201601751; no structural; compliance with maher ordinance no 155-13 not required.Details
unit 101: remodel kitchen & bathroom; unit 102: remodel bathroom; to comply with 201601751; no structural; compliance with maher ordinance no 155-13 not required. | $28,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.