Block 6637, lot 036
121 Day St
- City’s use
- Multi-Family Residential
- Built
- 1964
- Stories
- 3
- Units
- 10
- Rooms
- 8 bedrooms, 10 bathrooms
- Building
- 6,736 sq ft
- Lot
- 4,547 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 30, 2025 | Completed final sign-off Aug 2025 | 121 Day St | Jason Tunnell Construction | unit #105: kitchen remode - new cabinets in kind, new appliances in kind, new quartz countertop. bathroom remodel - new vanity, toilette, bathtub in kind.Details
unit #105: kitchen remode - new cabinets in kind, new appliances in kind, new quartz countertop. bathroom remodel - new vanity, toilette, bathtub in kind. | $25,000 |
| Oct 17, 2024 | Completed final sign-off Nov 2024 | 121 Day St | Aura Fire Safety | as built ref pa 202309156702 - remove & replace (e) facp w/new silent knight; provide & install 1 p/cellular communicator; provide & install heat detectors; provide & install smoke detectors in all common areas; provide lf sounders in all sleeping areas & living areasDetails
as built ref pa 202309156702 - remove & replace (e) facp w/new silent knight; provide & install 1 p/cellular communicator; provide & install heat detectors; provide & install smoke detectors in all common areas; provide lf sounders in all sleeping areas & living areas | $32,860 |
| Sep 15, 2023 | Completed final sign-off Nov 2024 | 121 Day St | Luminous Fire Alarm | fire alarm system replacement to comply with sffc 1103.7.6.1Details
fire alarm system replacement to comply with sffc 1103.7.6.1 | $32,860 |
| Jul 27, 2022 | Completed final sign-off Nov 2022 | 121 Day St | Cjc Management Group Inc. | kitchen remodel: (e) wall between kitchen & living rm to be removed. remove all carpet & replace w/ vinyl plank throughout. full paint entire unit. bathrm remodel in kind (n) tile suround.(n) tile flr, (n) vanity fixtures.(e) layout to remain. no plumbing or elec scope. (e) elec. p. to be relocatedDetails
kitchen remodel: (e) wall between kitchen & living rm to be removed. remove all carpet & replace w/ vinyl plank throughout. full paint entire unit. bathrm remodel in kind (n) tile suround.(n) tile flr, (n) vanity fixtures.(e) layout to remain. no plumbing or elec scope. (e) elec. p. to be relocated | $15,000 |
| Sep 30, 2019 | Completed final sign-off Oct 2019 | 121 Day St | Gil Construction & Assoc Inc. | revision to pa# 201909192174. little framing damage, repair damage in kind.Details
revision to pa# 201909192174. little framing damage, repair damage in kind. | |
| Sep 19, 2019 | Completed final sign-off Nov 2019 | 121 Day St | Gil Construction & Assoc Inc. | remove stucco from left section of back of bldg to roof line from lower contilever to expose damage to sheeting. remove and replace damaged sheeting with new 1/2" plywood sheeting over all areas where removed. install new stucco wire and stucco to match existing. approx 80 sq ft all work in kind.Details
remove stucco from left section of back of bldg to roof line from lower contilever to expose damage to sheeting. remove and replace damaged sheeting with new 1/2" plywood sheeting over all areas where removed. install new stucco wire and stucco to match existing. approx 80 sq ft all work in kind. | $50,000 |
| Nov 17, 2016 | Completed final sign-off Jan 2017 | 121 Day St | Paul Mcgrath Generalcontractor | remodel unit 205. replace bathroom bath-tub, toilet vanity, add exhaust fan, kitchen: replace cabinets, sink, disposal, fridge, dishwasher & stove, add subpanel for new circuits, 3 can lights in kitchen, 6 led lights in living room.Details
remodel unit 205. replace bathroom bath-tub, toilet vanity, add exhaust fan, kitchen: replace cabinets, sink, disposal, fridge, dishwasher & stove, add subpanel for new circuits, 3 can lights in kitchen, 6 led lights in living room. | $39,000 |
| Aug 11, 2015 | Completed final sign-off Nov 2015 | 121 Day St | Vector Construction Inc. | mandated "tier iii" seismic (soft story) upgrade, new foundations & shearwalls (e) 1st flr service spaces retrofit per sfbc chapter 34b; 2012 iebc appendix a-4.Details
mandated "tier iii" seismic (soft story) upgrade, new foundations & shearwalls (e) 1st flr service spaces retrofit per sfbc chapter 34b; 2012 iebc appendix a-4. | $30,000 |
| Apr 18, 2014 | Completed final sign-off Jun 2014 | 121 Day St | Paul Mcgrath Generalcontractor | kitchen remodel at unit 102. remove e wall between kitchen and living room. replace (e) window "in-kind" @ living room.Details
kitchen remodel at unit 102. remove e wall between kitchen and living room. replace (e) window "in-kind" @ living room. | $10,000 |
| Nov 27, 2012 | Never finaled issued Nov 2012, no final | 121 Day St | street space and sidewalk repairDetails
street space and sidewalk repair | ||
| Jan 18, 2006 | Completed final sign-off Feb 2006 | 121 Day St | New High Protection Roofing | reroofingDetails
reroofing | $5,000 |
| Mar 9, 2005 | Completed final sign-off Apr 2005 | 121 Day St | Markoff Structural Pest Control | see attached termite report no. 05314 item no. 2Details
see attached termite report no. 05314 item no. 2 | $16,000 |
| Mar 1, 2005 | Completed final sign-off Apr 2005 | 121 Day St | Markoff Structural Pest Control | repair dry rot at (2) lower sliding glas doors in front of bldng no. 101 & 102; adj framing at theseDetails
repair dry rot at (2) lower sliding glas doors in front of bldng no. 101 & 102; adj framing at these | $3,850 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Gil Construction & Assoc Inc. (2), Markoff Structural Pest Control (2), Paul Mcgrath Generalcontractor (2), Aura Fire Safety, Cjc Management Group Inc., Jason Tunnell Construction, Luminous Fire Alarm, New High Protection Roofing, Vector Construction Inc.
- Architects
- Mark Bucciarelli
- Engineers
- Jeff Chen, Tim O'sullivan
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.