Jason Tunnell Construction
- Based in
- Sausalito
- On San Francisco permits
- Mar 2014 to Dec 2025
- Last 24 months
- 4 permits filed
23 permits since 2000: 19 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 3, 2025 | Completed final sign-off Mar 2026 | 301 Main St | unit #30-g: 2 bathroom remodels, new tile, new toilets, 2 showers, 1 bathtub, 2 vanity cabs in kind.Details
unit #30-g: 2 bathroom remodels, new tile, new toilets, 2 showers, 1 bathtub, 2 vanity cabs in kind. | $15,000 |
| Aug 20, 2025 | Completed final sign-off Feb 2026 | 442 Vicksburg St | abatement of planning enforcement 2018-008019enf: remove unpermitted unit at gound fl. revert to garga/storage use. remove unpermitted kitchem, remove shower in bathroom, replace e) garage door with wood panel roll up doorDetails
abatement of planning enforcement 2018-008019enf: remove unpermitted unit at gound fl. revert to garga/storage use. remove unpermitted kitchem, remove shower in bathroom, replace e) garage door with wood panel roll up door | $15,000 |
| Apr 30, 2025 | Completed final sign-off Aug 2025 | 121 Day St | unit #105: kitchen remode - new cabinets in kind, new appliances in kind, new quartz countertop. bathroom remodel - new vanity, toilette, bathtub in kind.Details
unit #105: kitchen remode - new cabinets in kind, new appliances in kind, new quartz countertop. bathroom remodel - new vanity, toilette, bathtub in kind. | $25,000 |
| Feb 3, 2025 | Completed final sign-off Mar 2026 | 400 Castenada Av | kitchen remodel - new cabinets and countertops in kind, new flooring, appliance, plumbing fixtures. bathroom remodel - new vanity in kind, toilette, shower, bathtub like for like, new flooring, new window (not visible from street)Details
kitchen remodel - new cabinets and countertops in kind, new flooring, appliance, plumbing fixtures. bathroom remodel - new vanity in kind, toilette, shower, bathtub like for like, new flooring, new window (not visible from street) | $50,000 |
| Dec 21, 2023 | In progress issued Dec 2023 | 1341 Minna St | replace 13 windows like for like, fiberglass frame, double hung simonton double glazed, double low e, argon gas, all visible from the street and repair sidingDetails
replace 13 windows like for like, fiberglass frame, double hung simonton double glazed, double low e, argon gas, all visible from the street and repair siding | $6,000 |
| May 31, 2023 | Completed final sign-off Nov 2024 | 309 Hyde St | accessible business entrance program per ordinance 51-16 abe# 201808152014Details
accessible business entrance program per ordinance 51-16 abe# 201808152014 | $2,000 |
| May 24, 2023 | Completed final sign-off Jan 2024 | 28 Cumberland St | unit 28a: kitchen remodel. new cabinets, sink, countertops, appliances, flooring. bathroom remodel. new shower pan, shower valve, floor tile, shower stall tile, and vanity. all work in kind. no moving walls.Details
unit 28a: kitchen remodel. new cabinets, sink, countertops, appliances, flooring. bathroom remodel. new shower pan, shower valve, floor tile, shower stall tile, and vanity. all work in kind. no moving walls. | $25,000 |
| Feb 3, 2023 | Expired or cancelled cancelled Oct 2025 | 317 Hyde St | abe201808152016.comply w/ord51-16. struct tech infeasibility - dr doesnt meet size, lv, maeuvering req 11b 404. install new call sign & bell to call for assistance per fed code reg 36.305 alt to barrier removal. remove & alter exiting or provide new security grill w/ conforms 11b 40 & 1010.1.4.5Details
abe201808152016.comply w/ord51-16. struct tech infeasibility - dr doesnt meet size, lv, maeuvering req 11b 404. install new call sign & bell to call for assistance per fed code reg 36.305 alt to barrier removal. remove & alter exiting or provide new security grill w/ conforms 11b 40 & 1010.1.4.5 | $2,000 |
| Aug 8, 2022 | Completed final sign-off Sep 2022 | 2945 Washington St | repair of dryrot to deck structure. repair work is less than 50% of the structure. repair in kind.Details
repair of dryrot to deck structure. repair work is less than 50% of the structure. repair in kind. | $5,000 |
| Sep 21, 2021 | Completed final sign-off Dec 2021 | 27 Massasoit St | kitchen remodel: remove kitchen cabinets replace in kind w/new, quartz countertops, new appliances, new sink and disposal. no layout change, no wall stud framing demolition. h.e. lightingDetails
kitchen remodel: remove kitchen cabinets replace in kind w/new, quartz countertops, new appliances, new sink and disposal. no layout change, no wall stud framing demolition. h.e. lighting | $25,000 |
| Jul 28, 2021 | Completed final sign-off Oct 2021 | 710 Wisconsin St | kitchen remodel. remove kitchen base cabinets, install new cabinets, new quartz couter tops, new appliances (all electric), new sink and disposal. no layout change, no wall stud framing demolitionDetails
kitchen remodel. remove kitchen base cabinets, install new cabinets, new quartz couter tops, new appliances (all electric), new sink and disposal. no layout change, no wall stud framing demolition | $25,000 |
| Jan 22, 2021 | Completed final sign-off Apr 2022 | 712 Wisconsin St | the proposed remodel is an interior remodel, with no changes to exterior walls or windows. remodel work will include the following - kitchen remodel, with new simpson strongwall shear element; addition of powder room, bathroom & laundry room remodelDetails
the proposed remodel is an interior remodel, with no changes to exterior walls or windows. remodel work will include the following - kitchen remodel, with new simpson strongwall shear element; addition of powder room, bathroom & laundry room remodel | $60,000 |
| Jul 6, 2020 | Completed final sign-off Jul 2021 | 601 Van Ness Av | kitchen remodel; new cabinets, quartz countertops, new appliances, new flooring throughout condo bathroom remodel; new shower, tile, vanity, toilette the kitchen size is 8'x 8' the bathroom size is 8'x 5'Details
kitchen remodel; new cabinets, quartz countertops, new appliances, new flooring throughout condo bathroom remodel; new shower, tile, vanity, toilette the kitchen size is 8'x 8' the bathroom size is 8'x 5' | $25,000 |
| Sep 11, 2018 | Completed final sign-off Feb 2019 | 88 Townsend St | unit 211. kitchen and bath remodel. remove and replace cabinets, granite tops, refridgerator, stove, tile on shower walls, floor tiles, toilet, vanity, bathtub and pressure balance valve. maher n/aDetails
unit 211. kitchen and bath remodel. remove and replace cabinets, granite tops, refridgerator, stove, tile on shower walls, floor tiles, toilet, vanity, bathtub and pressure balance valve. maher n/a | $25,000 |
| Jun 1, 2018 | Completed final sign-off Oct 2020 | 4805 19th St | remodel of ground floor unit w/in (e) footprint (n0 new sq footage). add a bedroom & bathroom, general upgrades, 2 in-kind window replacementDetails
remodel of ground floor unit w/in (e) footprint (n0 new sq footage). add a bedroom & bathroom, general upgrades, 2 in-kind window replacement | $65,000 |
| Oct 3, 2017 | Completed final sign-off Dec 2018 | 712 Wisconsin St | interior remodel of (e) master bathroom; expand by 3ft, add (n) prop line window per ab-009; replace 2 - master bedr windows and window seat.Details
interior remodel of (e) master bathroom; expand by 3ft, add (n) prop line window per ab-009; replace 2 - master bedr windows and window seat. | $25,000 |
| Apr 4, 2017 | Never finaled issued Apr 2017, no final | 1740 Washington St | #203 - kitchen & bathroom remodel. kitchen: new cabinets, sink, counters, floor surface, appliances, light fixtures, new windows (like for like), u<94, not visible from street. new rear rntry door form kitchen. bath: new tile on floor & wall, new fixtrues, new lights.Details
#203 - kitchen & bathroom remodel. kitchen: new cabinets, sink, counters, floor surface, appliances, light fixtures, new windows (like for like), u<94, not visible from street. new rear rntry door form kitchen. bath: new tile on floor & wall, new fixtrues, new lights. | $21,750 |
| Apr 4, 2017 | Never finaled issued Apr 2017, no final | 1740 Washington St | #301 - kitchen & bath remodel. kitchen: new cabinets, sink, counters, floor surface, appliances, light fixtures, new iwnodws (like for like) u< 94, not visible from street. bath: new tile on floor & wall, new fixtures, new lights, new rear entry door from kitchen.Details
#301 - kitchen & bath remodel. kitchen: new cabinets, sink, counters, floor surface, appliances, light fixtures, new iwnodws (like for like) u< 94, not visible from street. bath: new tile on floor & wall, new fixtures, new lights, new rear entry door from kitchen. | $21,750 |
| Sep 20, 2016 | Completed final sign-off Mar 2017 | 1740 Washington St | #302- kitchen: new sink, cabinets, counters, floor surface, appliances, light fixtures, new windows (like for like) u factor <94, not visable from street. bath: new tile on floor & wall, new fixtures, new shower stall, replumb as required, new rear entry door from kitchen.Details
#302- kitchen: new sink, cabinets, counters, floor surface, appliances, light fixtures, new windows (like for like) u factor <94, not visable from street. bath: new tile on floor & wall, new fixtures, new shower stall, replumb as required, new rear entry door from kitchen. | $21,750 |
| May 4, 2015 | Completed final sign-off Feb 2016 | 1130 Filbert St | unit #4: removal of ceiling throughout unit to add insulation & fire-rated recessed lights & install new fire-rated ceiling,move non-load bearing shower wall in bathrm to provide clearance between toilet & lavatory,expand non-load bearing wall in closet for more space.Details
unit #4: removal of ceiling throughout unit to add insulation & fire-rated recessed lights & install new fire-rated ceiling,move non-load bearing shower wall in bathrm to provide clearance between toilet & lavatory,expand non-load bearing wall in closet for more space. | $15,000 |
| Apr 20, 2015 | Completed final sign-off Jun 2015 | 845 Noe St | apt #4: kitchen remodel: new cabinets, new counter tops, new sink, new stove.Details
apt #4: kitchen remodel: new cabinets, new counter tops, new sink, new stove. | $12,000 |
| Dec 4, 2014 | Completed final sign-off Feb 2016 | 1130 Filbert St | kitchen remodel, bathroom remodel, new electrical circuits for kitchen and bath, new plumbing supply lines for kitchen and bath and new drains. no light fixtures changes in kitchen ceiling.Details
kitchen remodel, bathroom remodel, new electrical circuits for kitchen and bath, new plumbing supply lines for kitchen and bath and new drains. no light fixtures changes in kitchen ceiling. | $30,000 |
| Mar 5, 2014 | Completed final sign-off Mar 2015 | 43 Toledo Wy | install an exterior spiral staircase and provide the two 2nd floor bedrooms access to the rear patio below. replace extg single pane windows (one per bedroom) with new french double pane doors to access new stairs.Details
install an exterior spiral staircase and provide the two 2nd floor bedrooms access to the rear patio below. replace extg single pane windows (one per bedroom) with new french double pane doors to access new stairs. | $15,000 |