Back to kitchen remodel contractors
Jason Tunnell Construction
- Based in
- Sausalito
- On San Francisco permits
- Mar 2014 to Dec 2025
- Last 24 months
- 4 permits filed
23 permits since 2000: 19 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
13 kitchen remodel permits: 11 completed, 2 never finaled. Typically 0 days from filing to permit and 178 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 30, 2025 | Completed final sign-off Aug 2025 | 121 Day St | unit #105: kitchen remode - new cabinets in kind, new appliances in kind, new quartz countertop. bathroom remodel - new vanity, toilette, bathtub in kind.Details
unit #105: kitchen remode - new cabinets in kind, new appliances in kind, new quartz countertop. bathroom remodel - new vanity, toilette, bathtub in kind. | $25,000 |
| Feb 3, 2025 | Completed final sign-off Mar 2026 | 400 Castenada Av | kitchen remodel - new cabinets and countertops in kind, new flooring, appliance, plumbing fixtures. bathroom remodel - new vanity in kind, toilette, shower, bathtub like for like, new flooring, new window (not visible from street)Details
kitchen remodel - new cabinets and countertops in kind, new flooring, appliance, plumbing fixtures. bathroom remodel - new vanity in kind, toilette, shower, bathtub like for like, new flooring, new window (not visible from street) | $50,000 |
| May 24, 2023 | Completed final sign-off Jan 2024 | 28 Cumberland St | unit 28a: kitchen remodel. new cabinets, sink, countertops, appliances, flooring. bathroom remodel. new shower pan, shower valve, floor tile, shower stall tile, and vanity. all work in kind. no moving walls.Details
unit 28a: kitchen remodel. new cabinets, sink, countertops, appliances, flooring. bathroom remodel. new shower pan, shower valve, floor tile, shower stall tile, and vanity. all work in kind. no moving walls. | $25,000 |
| Sep 21, 2021 | Completed final sign-off Dec 2021 | 27 Massasoit St | kitchen remodel: remove kitchen cabinets replace in kind w/new, quartz countertops, new appliances, new sink and disposal. no layout change, no wall stud framing demolition. h.e. lightingDetails
kitchen remodel: remove kitchen cabinets replace in kind w/new, quartz countertops, new appliances, new sink and disposal. no layout change, no wall stud framing demolition. h.e. lighting | $25,000 |
| Jul 28, 2021 | Completed final sign-off Oct 2021 | 710 Wisconsin St | kitchen remodel. remove kitchen base cabinets, install new cabinets, new quartz couter tops, new appliances (all electric), new sink and disposal. no layout change, no wall stud framing demolitionDetails
kitchen remodel. remove kitchen base cabinets, install new cabinets, new quartz couter tops, new appliances (all electric), new sink and disposal. no layout change, no wall stud framing demolition | $25,000 |
| Jan 22, 2021 | Completed final sign-off Apr 2022 | 712 Wisconsin St | the proposed remodel is an interior remodel, with no changes to exterior walls or windows. remodel work will include the following - kitchen remodel, with new simpson strongwall shear element; addition of powder room, bathroom & laundry room remodelDetails
the proposed remodel is an interior remodel, with no changes to exterior walls or windows. remodel work will include the following - kitchen remodel, with new simpson strongwall shear element; addition of powder room, bathroom & laundry room remodel | $60,000 |
| Jul 6, 2020 | Completed final sign-off Jul 2021 | 601 Van Ness Av | kitchen remodel; new cabinets, quartz countertops, new appliances, new flooring throughout condo bathroom remodel; new shower, tile, vanity, toilette the kitchen size is 8'x 8' the bathroom size is 8'x 5'Details
kitchen remodel; new cabinets, quartz countertops, new appliances, new flooring throughout condo bathroom remodel; new shower, tile, vanity, toilette the kitchen size is 8'x 8' the bathroom size is 8'x 5' | $25,000 |
| Sep 11, 2018 | Completed final sign-off Feb 2019 | 88 Townsend St | unit 211. kitchen and bath remodel. remove and replace cabinets, granite tops, refridgerator, stove, tile on shower walls, floor tiles, toilet, vanity, bathtub and pressure balance valve. maher n/aDetails
unit 211. kitchen and bath remodel. remove and replace cabinets, granite tops, refridgerator, stove, tile on shower walls, floor tiles, toilet, vanity, bathtub and pressure balance valve. maher n/a | $25,000 |
| Apr 4, 2017 | Never finaled issued Apr 2017, no final | 1740 Washington St | #301 - kitchen & bath remodel. kitchen: new cabinets, sink, counters, floor surface, appliances, light fixtures, new iwnodws (like for like) u< 94, not visible from street. bath: new tile on floor & wall, new fixtures, new lights, new rear entry door from kitchen.Details
#301 - kitchen & bath remodel. kitchen: new cabinets, sink, counters, floor surface, appliances, light fixtures, new iwnodws (like for like) u< 94, not visible from street. bath: new tile on floor & wall, new fixtures, new lights, new rear entry door from kitchen. | $21,750 |
| Apr 4, 2017 | Never finaled issued Apr 2017, no final | 1740 Washington St | #203 - kitchen & bathroom remodel. kitchen: new cabinets, sink, counters, floor surface, appliances, light fixtures, new windows (like for like), u<94, not visible from street. new rear rntry door form kitchen. bath: new tile on floor & wall, new fixtrues, new lights.Details
#203 - kitchen & bathroom remodel. kitchen: new cabinets, sink, counters, floor surface, appliances, light fixtures, new windows (like for like), u<94, not visible from street. new rear rntry door form kitchen. bath: new tile on floor & wall, new fixtrues, new lights. | $21,750 |
| Sep 20, 2016 | Completed final sign-off Mar 2017 | 1740 Washington St | #302- kitchen: new sink, cabinets, counters, floor surface, appliances, light fixtures, new windows (like for like) u factor <94, not visable from street. bath: new tile on floor & wall, new fixtures, new shower stall, replumb as required, new rear entry door from kitchen.Details
#302- kitchen: new sink, cabinets, counters, floor surface, appliances, light fixtures, new windows (like for like) u factor <94, not visable from street. bath: new tile on floor & wall, new fixtures, new shower stall, replumb as required, new rear entry door from kitchen. | $21,750 |
| Apr 20, 2015 | Completed final sign-off Jun 2015 | 845 Noe St | apt #4: kitchen remodel: new cabinets, new counter tops, new sink, new stove.Details
apt #4: kitchen remodel: new cabinets, new counter tops, new sink, new stove. | $12,000 |
| Dec 4, 2014 | Completed final sign-off Feb 2016 | 1130 Filbert St | kitchen remodel, bathroom remodel, new electrical circuits for kitchen and bath, new plumbing supply lines for kitchen and bath and new drains. no light fixtures changes in kitchen ceiling.Details
kitchen remodel, bathroom remodel, new electrical circuits for kitchen and bath, new plumbing supply lines for kitchen and bath and new drains. no light fixtures changes in kitchen ceiling. | $30,000 |