Jason Tunnell Construction
- Based in
- Sausalito
- On San Francisco permits
- Mar 2014 to Dec 2025
- Last 24 months
- 4 permits filed
23 permits since 2000: 19 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 274 days from filing to permit and 99 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 5, 2014 | Completed final sign-off Mar 2015 | 43 Toledo Wy | install an exterior spiral staircase and provide the two 2nd floor bedrooms access to the rear patio below. replace extg single pane windows (one per bedroom) with new french double pane doors to access new stairs.Details
install an exterior spiral staircase and provide the two 2nd floor bedrooms access to the rear patio below. replace extg single pane windows (one per bedroom) with new french double pane doors to access new stairs. | $15,000 |