Permits filed here
27 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 24, 2025 | Completed final sign-off Dec 2025 | 345 Fulton St | Redlog Flooring Services Corp | unit 50: plaster repairs on ceiling of living room.Details
unit 50: plaster repairs on ceiling of living room. | $5,000 |
| Jul 1, 2022 | Completed final sign-off Nov 2022 | 345 Fulton St | Axa Construction | #20: install (n) clothes washer and dryer no structural wall demo.Details
#20: install (n) clothes washer and dryer no structural wall demo. | $4,000 |
| May 11, 2022 | Never finaled issued Oct 2023, no final | 345 Fulton St | S L M Development Inc. | addition of three adu units at the ground floor per the local adu program for a total of 31 units. modification of sprinklers at work area as required and under a separate permit; entire ground floor assembly to be upgraded to a 1-hour assembly per information sheet fs-05.Details
addition of three adu units at the ground floor per the local adu program for a total of 31 units. modification of sprinklers at work area as required and under a separate permit; entire ground floor assembly to be upgraded to a 1-hour assembly per information sheet fs-05. | $480,000 |
| Jan 25, 2022 | Never finaled issued Mar 2022, no final | 345 Fulton St | B-Side Inc. | unit 43: convert (e) kitchen to nook. rehab (e) kitchen. install washer/dryer.Details
unit 43: convert (e) kitchen to nook. rehab (e) kitchen. install washer/dryer. | $28,000 |
| Jul 7, 2021 | Completed final sign-off Dec 2021 | 345 Fulton St | B-Side Inc. | unit # 33: convert (e) kitchen to nook, rehabilitate (e) kitchen, rehabilitate (e) batroom, install washer and dryerDetails
unit # 33: convert (e) kitchen to nook, rehabilitate (e) kitchen, rehabilitate (e) batroom, install washer and dryer | $40,000 |
| Jul 6, 2021 | Completed final sign-off Sep 2021 | 345 Fulton St | B-Side Inc. | #53. remodeling kitchen, remodeling bathroom, no structural works.Details
#53. remodeling kitchen, remodeling bathroom, no structural works. | $30,000 |
| Jul 6, 2021 | Completed final sign-off Sep 2021 | 345 Fulton St | B-Side Inc. | #45. remodeling kitchen, remodeling bathroom, no structural works.Details
#45. remodeling kitchen, remodeling bathroom, no structural works. | $30,000 |
| Jun 16, 2020 | Never finaled issued Jun 2020, no final | 345 Fulton St | street spaceDetails
street space | ||
| Feb 11, 2020 | Completed final sign-off Dec 2020 | 345 Fulton St | Doherty Restoration, Inc. | unit 40: remodel 1 existing kitchen & 1 existing bathroom in kind. remove & replace drywall as necessary to update elec & plumbing. no structural changes. no alteration of wall, window or doorDetails
unit 40: remodel 1 existing kitchen & 1 existing bathroom in kind. remove & replace drywall as necessary to update elec & plumbing. no structural changes. no alteration of wall, window or door | $45,000 |
| Oct 15, 2019 | Completed final sign-off Nov 2019 | 345 Fulton St | Aguilera Construction Company | apt 42: kitchen remodel. r/r bathroom tile floor. unit previously remodedl with plumbing/electrical/building. maher n/a.Details
apt 42: kitchen remodel. r/r bathroom tile floor. unit previously remodedl with plumbing/electrical/building. maher n/a. | $10,000 |
| Oct 15, 2019 | Completed final sign-off Nov 2019 | 345 Fulton St | Aguilera Construction Company | apt 44: kitchen floor repair & bathroom repair floor tile. repair/replace dryrot if applicable. unit previously remodel with plumbing/electrical/building.Details
apt 44: kitchen floor repair & bathroom repair floor tile. repair/replace dryrot if applicable. unit previously remodel with plumbing/electrical/building. | $7,000 |
| Apr 24, 2019 | Completed final sign-off Jul 2019 | 345 Fulton St | Aguilera Construction Company | kitchen/bath remodel for unit #26. total sqft is 400 only about 75 sq ft remodeled. no structural - no framing alterations.Details
kitchen/bath remodel for unit #26. total sqft is 400 only about 75 sq ft remodeled. no structural - no framing alterations. | $40,000 |
| Mar 5, 2019 | Completed final sign-off Jun 2019 | 345 Fulton St | Axel8 Construction | unit #30: rehabilitate existing kitchen, bathroom and install washer/dryerDetails
unit #30: rehabilitate existing kitchen, bathroom and install washer/dryer | $28,000 |
| Jan 28, 2019 | Completed final sign-off Jun 2019 | 345 Fulton St | Hue & Cry Security System | voluntary upgrade of fire alarm system with additions of low frequency sounders in all sleeping areasDetails
voluntary upgrade of fire alarm system with additions of low frequency sounders in all sleeping areas | $43,804 |
| Aug 27, 2018 | Completed final sign-off Nov 2018 | 345 Fulton St | B-Side Inc. | apt 32: opening dry walls, rough electrical and final, closing back dry wall when all done. maher n/a.Details
apt 32: opening dry walls, rough electrical and final, closing back dry wall when all done. maher n/a. | $8,000 |
| Apr 24, 2018 | Completed final sign-off Jun 2018 | 345 Fulton St | Rain Defense | re-roofingDetails
re-roofing | $69,000 |
| Jan 29, 2018 | Completed final sign-off Apr 2018 | 345 Fulton St | Brighter Bay Builders Inc | #20: revision to pa #201801128557, to reduce scope of work, plumbing - replace bathroom faucet removing description of work for kitchen remodel, dishwasher, garbage disposal, range, 2 smoke detectors.Details
#20: revision to pa #201801128557, to reduce scope of work, plumbing - replace bathroom faucet removing description of work for kitchen remodel, dishwasher, garbage disposal, range, 2 smoke detectors. | |
| Jan 12, 2018 | Completed final sign-off Mar 2018 | 345 Fulton St | Brighter Bay Builders Inc | kitchen remodl, no chang in wall & opening lyaout. local wall opening and patch up associated with upgrade.Details
kitchen remodl, no chang in wall & opening lyaout. local wall opening and patch up associated with upgrade. | $40,000 |
| Aug 16, 2017 | Completed final sign-off Oct 2017 | 345 Fulton St | Brighter Bay Builders Inc | apt 33: remodel kitchen, bathroom, no changes to wall locations. update electrical & plumbing to code.Details
apt 33: remodel kitchen, bathroom, no changes to wall locations. update electrical & plumbing to code. | $25,000 |
| Aug 3, 2017 | Completed final sign-off Nov 2017 | 345 Fulton St | Brighter Bay Builders Inc | unit #24: rehabilitate kitchen & bathroom. update electrical and plumbing to code. maher naDetails
unit #24: rehabilitate kitchen & bathroom. update electrical and plumbing to code. maher na | $35,000 |
| Jun 19, 2017 | Completed final sign-off Dec 2017 | 345 Fulton St | Brighter Bay Builders Inc | unit #53 & #23: rehabilitate kitchen, rehabilitate bathroom, update electrical to code & update plumbing to code. no structural work. all walls to remain.Details
unit #53 & #23: rehabilitate kitchen, rehabilitate bathroom, update electrical to code & update plumbing to code. no structural work. all walls to remain. | $21,599 |
| May 17, 2017 | Completed final sign-off Aug 2017 | 345 Fulton St | Brighter Bay Builders Inc | #25, 35, 44, 45, 46, 56- remodel 6 kitchens & (6) baths, update electrical & plumbing. paint common areas.Details
#25, 35, 44, 45, 46, 56- remodel 6 kitchens & (6) baths, update electrical & plumbing. paint common areas. | $50,000 |
| May 8, 2017 | Completed final sign-off Aug 2017 | 345 Fulton St | Boss Construction Inc. | upgrade electrical in unit 42 remodel bathroomDetails
upgrade electrical in unit 42 remodel bathroom | $15,000 |
| Jul 7, 2015 | Expired or cancelled cancelled Jul 2022 | 345 Fulton St | a remodel of the 1st floor to include 2 new studio units to the rear. relocation of the boiler room & laundry room, gas meters & electrical meters. entire 1st floor must be sprinklered to nfpa 13. fire alarm and sprinkler system under separate applicationsDetails
a remodel of the 1st floor to include 2 new studio units to the rear. relocation of the boiler room & laundry room, gas meters & electrical meters. entire 1st floor must be sprinklered to nfpa 13. fire alarm and sprinkler system under separate applications | $125,000 | |
| May 17, 2013 | Never finaled issued May 2013, no final | 345 Fulton St | Malagic Construction | revision to permit # 201304084019, install new bathroom window (replace old window) in # 41 & #52 ( not visible from the street)Details
revision to permit # 201304084019, install new bathroom window (replace old window) in # 41 & #52 ( not visible from the street) | $1,500 |
| Apr 8, 2013 | Never finaled issued Apr 2013, no final | 345 Fulton St | Malagic Construction | work at unit #41 & #52: replace old kitchen cabinets with new, new counter & tiles, new bathroom tile floor & tub surround. no new wall and no wall relocation. lighting in kitchen and bathroom remodel shall comply with cec 150(k)8 & 150(k)10 respectively.Details
work at unit #41 & #52: replace old kitchen cabinets with new, new counter & tiles, new bathroom tile floor & tub surround. no new wall and no wall relocation. lighting in kitchen and bathroom remodel shall comply with cec 150(k)8 & 150(k)10 respectively. | $34,000 |
| Oct 23, 2007 | Expired or cancelled expired Aug 2009 | 345 Fulton St | Cardona Construction | work on unit#22. kitchen upgrade, kitchen cabinet, sink, countertop, flooring. bathroom upgrade tub tile, 1 flooring and minor drywall repair. no structural work -50% fluorescent lighting, kitchen fluorescent bath or manual on auto off switch.Details
work on unit#22. kitchen upgrade, kitchen cabinet, sink, countertop, flooring. bathroom upgrade tub tile, 1 flooring and minor drywall repair. no structural work -50% fluorescent lighting, kitchen fluorescent bath or manual on auto off switch. | $15,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Brighter Bay Builders Inc (6), B-Side Inc. (5), Aguilera Construction Company (3), Malagic Construction (2), Axa Construction, Axel8 Construction, Boss Construction Inc., Cardona Construction, Doherty Restoration, Inc., Hue & Cry Security System, Rain Defense, Redlog Flooring Services Corp, S L M Development Inc.
- Architects
- John T. Hood
- Engineers
- Joe Win Kon (2), Jefferson Chen, Jo Kon