Block 1442, lot 008
337 10th Ave
- City’s use
- Multi-Family Residential
- Built
- 1926
- Stories
- 4
- Units
- 15
- Rooms
- 8 bedrooms, 15 bathrooms
- Building
- 9,669 sq ft
- Lot
- 4,200 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
24 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 1, 2025 | Completed final sign-off Aug 2025 | 337 10th Av | Redlog Flooring Services Corp | 2 4x4 post replacement in kind, hardware installation on joists at rear deck.Details
2 4x4 post replacement in kind, hardware installation on joists at rear deck. | $8,000 |
| Aug 3, 2022 | Completed final sign-off Aug 2022 | 337 10th Av | Au Electric Corporation/Aec Alarms | adu as built for approved bpa#202204132105, add (1) smoke detector, (1) pull station, (2) monitor modulesDetails
adu as built for approved bpa#202204132105, add (1) smoke detector, (1) pull station, (2) monitor modules | $1,000 |
| Apr 13, 2022 | Completed final sign-off Aug 2022 | 337 10th Av | Au Electric Corporation/Aec Alarms | these are as builts drawsing for approved fire plan 201808177641. the scope of work is to install add'l fire devices on ground level adu units. install one smoke detector in hallway, (5) lfs at #a #b #c approved adu plan 202003066430Details
these are as builts drawsing for approved fire plan 201808177641. the scope of work is to install add'l fire devices on ground level adu units. install one smoke detector in hallway, (5) lfs at #a #b #c approved adu plan 202003066430 | $3,000 |
| Jun 10, 2021 | Completed final sign-off Aug 2022 | 337 10th Av | Control Fire Inc. | fire sprinklers per nfpa 13 and underground per nfpa 24. 3 new units on 1st floor as well as outdoor pathway per approved permit # 2020-306-6430. fire only water service, back-flow/underground pipng. control fire work starts at curb. total=50 heads.Details
fire sprinklers per nfpa 13 and underground per nfpa 24. 3 new units on 1st floor as well as outdoor pathway per approved permit # 2020-306-6430. fire only water service, back-flow/underground pipng. control fire work starts at curb. total=50 heads. | $14,962 |
| Nov 6, 2020 | Never finaled issued Nov 2020, no final | 337 10th Av | B-Side Inc. | unit#4:replace washer/dryer, upgrade same lines, no structural work, no moving walls.Details
unit#4:replace washer/dryer, upgrade same lines, no structural work, no moving walls. | $5,000 |
| Sep 14, 2020 | Never finaled issued Sep 2020, no final | 337 10th Av | B-Side Inc. | #4: rehab kitchen and bathroom. replace washer/dryer.Details
#4: rehab kitchen and bathroom. replace washer/dryer. | $20,000 |
| Jul 13, 2020 | Completed final sign-off Sep 2022 | 337 10th Av | Wickman Development And Construction | soft demo of interior of garage, not visible from the street. exploratory testing.Details
soft demo of interior of garage, not visible from the street. exploratory testing. | $2,000 |
| Jul 9, 2020 | Completed final sign-off Sep 2022 | 337 10th Av | Wickman Development And Construction | repair dryrot in garage,not visible from street. no exterior work.Details
repair dryrot in garage,not visible from street. no exterior work. | $500 |
| Mar 6, 2020 | Completed final sign-off Sep 2022 | 337 10th Av | Wickman Development And Construction | per adu ordinance# 162-16, addition of 3 adu on ground floor. 2-one bedrooms & one studio.Details
per adu ordinance# 162-16, addition of 3 adu on ground floor. 2-one bedrooms & one studio. | $235,000 |
| Feb 7, 2020 | Never finaled issued Jun 2020, no final | 337 10th Av | B-Side Inc. | convert e living room to bedroom, rehabilitate e kitchen, rehabilitate e bath, install washer dryer. unit 2.Details
convert e living room to bedroom, rehabilitate e kitchen, rehabilitate e bath, install washer dryer. unit 2. | $37,000 |
| Oct 4, 2019 | Never finaled issued Jan 2020, no final | 337 10th Av | B-Side Inc. | unit 11 - convert existing kitchen to bedroom; relocate kitchen, rehabilitate (e) bathroom and install washer & dryerDetails
unit 11 - convert existing kitchen to bedroom; relocate kitchen, rehabilitate (e) bathroom and install washer & dryer | $40,000 |
| Jun 6, 2019 | Completed final sign-off Dec 2019 | 337 10th Av | Brighter Bay Builders Inc | 9th floor: 1)rehabilitate extg kitchen. 2) rehabilitate extg bathroom. 3)install washer and dryer; add (n)study roomDetails
9th floor: 1)rehabilitate extg kitchen. 2) rehabilitate extg bathroom. 3)install washer and dryer; add (n)study room | $34,000 |
| Jun 4, 2019 | Completed final sign-off Dec 2019 | 337 10th Av | Brighter Bay Builders Inc | convert (e) living rm to bedroom. rehabilitate (e) kitchen & bathrm. install w/dDetails
convert (e) living rm to bedroom. rehabilitate (e) kitchen & bathrm. install w/d | $32,000 |
| Aug 17, 2018 | Completed final sign-off Feb 2019 | 337 10th Av | Au Electric Corporation/Aec Alarms | upgrade existing fire alarm to comply with 1103.7.6.1Details
upgrade existing fire alarm to comply with 1103.7.6.1 | $25,000 |
| Jul 23, 2018 | Never finaled issued Jul 2018, no final | 337 10th Av | streetspaceDetails
streetspace | ||
| Apr 30, 2018 | Never finaled issued Apr 2018, no final | 337 10th Av | street spaceDetails
street space | ||
| Apr 19, 2018 | Completed final sign-off Sep 2018 | 337 10th Av | Holland Brooks Builders Inc | #1: convert existing living room to bedroom. rehabilitate existing kitchen, rehabilitate existing bathroom, install washer/dryer.Details
#1: convert existing living room to bedroom. rehabilitate existing kitchen, rehabilitate existing bathroom, install washer/dryer. | $30,000 |
| Oct 16, 2017 | Completed final sign-off Jun 2018 | 337 10th Av | Gt Home Remodel | work in unit #8: convert e kitchen to bedroom, relocate kitchen, rehabilitate existing bath, install washer dryerDetails
work in unit #8: convert e kitchen to bedroom, relocate kitchen, rehabilitate existing bath, install washer dryer | $35,000 |
| Sep 12, 2017 | Completed final sign-off Oct 2019 | 337 10th Av | Wickman Development And Construction | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. | $60,000 |
| Aug 30, 2017 | Expired or cancelled cancelled Jan 2026 | 337 10th Av | unit #10: convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer & dryer.Details
unit #10: convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer & dryer. | $35,000 | |
| Feb 28, 2017 | Never finaled issued Feb 2017, no final | 337 10th Av | Markoff Structural Pest Control | markoff structural pest termite report # 16462 items 1,2,3,4,5 foundation cap 12"Details
markoff structural pest termite report # 16462 items 1,2,3,4,5 foundation cap 12" | $6,500 |
| Oct 19, 2010 | Never finaled issued Oct 2010, no final | 337 10th Av | street space for scaffoldDetails
street space for scaffold | ||
| Feb 19, 2004 | Completed final sign-off Feb 2004 | 337 10th Av | Bowen Construction-Painting & Waterproof | repair rear stairs - remove dry rotDetails
repair rear stairs - remove dry rot | $1,200 |
| Oct 7, 2002 | Never finaled issued Oct 2002, no final | 337 10th Av | sidewalk permitDetails
sidewalk permit |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- B-Side Inc. (4), Wickman Development And Construction (4), Au Electric Corporation/Aec Alarms (3), Brighter Bay Builders Inc (2), Bowen Construction-Painting & Waterproof, Control Fire Inc., Gt Home Remodel, Holland Brooks Builders Inc, Markoff Structural Pest Control, Redlog Flooring Services Corp
- Architects
- Joe Kon, Mark Hogan
- Engineers
- Joe Kon, Rod Massoudi
- Authorized agent-otherss
- Roger Tsai (2), David Solano