Block 0273, lot 001
655 Powell St
- City’s use
- Multi-Family Residential
- Built
- 1923
- Stories
- 6
- Units
- 48
- Rooms
- 48 bathrooms
- Building
- 31,790 sq ft
- Lot
- 6,250 sq ft
- Zoning
- RM4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
60 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 19, 2025 | Completed final sign-off Mar 2026 | 655 Powell St | Redlog Flooring Services Corp | make repairs, facade maintenance, remove, prep, and recoat loose and falling concrete throughout exterior facades. coating will match existing adjacent surfaces. touch ups on windows for any loose paint coats. exterior. repair is in kind.Details
make repairs, facade maintenance, remove, prep, and recoat loose and falling concrete throughout exterior facades. coating will match existing adjacent surfaces. touch ups on windows for any loose paint coats. exterior. repair is in kind. | $80,000 |
| Nov 19, 2024 | Completed final sign-off Jan 2025 | 655 Powell St | Au Electric Corporation/Aec Alarms | refer to adu approved ref pa 202010156602 add low frequency sounders in all new adu sleeping areas & replace the existing fa system on a like for like basisDetails
refer to adu approved ref pa 202010156602 add low frequency sounders in all new adu sleeping areas & replace the existing fa system on a like for like basis | $120,000 |
| Oct 24, 2024 | Expired or cancelled cancelled Jul 2025 | 655 Powell St | Bay Area Activo Inc. | in kind, surface level, repair of facade per san francisco existing building code chapter 5f including epoxy injection of cracked bricks and application of facade coating to match (e) surfacing.Details
in kind, surface level, repair of facade per san francisco existing building code chapter 5f including epoxy injection of cracked bricks and application of facade coating to match (e) surfacing. | $85,450 |
| May 3, 2023 | Completed final sign-off Dec 2024 | 655 Powell St | O'connor Plumbing & Fire Protection | g/f: install (72) new sprinklers throughout, new adu on 2/f per nfpa#13, new 2" underground per nfpa#24. ref bpa#202010156602. sprinkler monitoring per nfpa#72 under separate permit.Details
g/f: install (72) new sprinklers throughout, new adu on 2/f per nfpa#13, new 2" underground per nfpa#24. ref bpa#202010156602. sprinkler monitoring per nfpa#72 under separate permit. | $40,000 |
| Jan 25, 2023 | Completed final sign-off Jan 2025 | 655 Powell St | Doherty Restoration, Inc. | revison to bpa 2020-1015-6602; omit mechanical ventilation at proposed (6) adu.Details
revison to bpa 2020-1015-6602; omit mechanical ventilation at proposed (6) adu. | |
| May 18, 2022 | Completed final sign-off Apr 2023 | 655 Powell St | Axel8 Construction | #607: convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. install washer & dryer.Details
#607: convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. install washer & dryer. | $42,000 |
| May 18, 2022 | Completed final sign-off Mar 2023 | 655 Powell St | Axel8 Construction | #505: convert (e) kitchen to study. relocate kitchen. rehabilitate (e) bathroom. install washer & dryer.Details
#505: convert (e) kitchen to study. relocate kitchen. rehabilitate (e) bathroom. install washer & dryer. | $42,000 |
| May 18, 2022 | Completed final sign-off Nov 2022 | 655 Powell St | Axel8 Construction | unit 108: convert (e) kitchen to study. relocate kitchen. rehab bathroom, install washer/dryer.Details
unit 108: convert (e) kitchen to study. relocate kitchen. rehab bathroom, install washer/dryer. | $42,000 |
| May 18, 2022 | Completed final sign-off Feb 2023 | 655 Powell St | Axel8 Construction | remodel unit 406 convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. install 2nd bathroom. install washer & dryer.Details
remodel unit 406 convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. install 2nd bathroom. install washer & dryer. | $47,000 |
| Jan 20, 2022 | Completed final sign-off Apr 2022 | 655 Powell St | Axel8 Construction | commencement of work not started under previoiuly approved permit application pa# 201912170046.Details
commencement of work not started under previoiuly approved permit application pa# 201912170046. | $36,500 |
| Jan 20, 2022 | Completed final sign-off Apr 2022 | 655 Powell St | Axel8 Construction | recommencement and completion of work approved under pa# 201911157435. #304Details
recommencement and completion of work approved under pa# 201911157435. #304 | $38,000 |
| Apr 21, 2021 | Never finaled issued Apr 2022, no final | 655 Powell St | Axel8 Construction | #504: 1) convert existing kitchen to study. 2)relocate kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryer.Details
#504: 1) convert existing kitchen to study. 2)relocate kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryer. | $40,000 |
| Apr 21, 2021 | Never finaled issued Apr 2022, no final | 655 Powell St | Axel8 Construction | #205: 1) convert existing kitchen to study. 2)relocate kitchen. 3)rehabilitate extg kitchen. 4)install washer and dryer.Details
#205: 1) convert existing kitchen to study. 2)relocate kitchen. 3)rehabilitate extg kitchen. 4)install washer and dryer. | $40,000 |
| Jan 4, 2021 | Completed final sign-off Mar 2023 | 655 Powell St | Axel8 Construction | unit 604. convert (e) dining room to bedroom. relocate kitchen. rehabilitate (e) bathroom. install washer & dryer.Details
unit 604. convert (e) dining room to bedroom. relocate kitchen. rehabilitate (e) bathroom. install washer & dryer. | $40,000 |
| Oct 15, 2020 | Completed final sign-off Jan 2025 | 655 Powell St | Doherty Restoration, Inc. | convert (e) garage, storage & utility rms on 1st & 2nd flr into (6) adu's per ord#162-16, total of (54) units.entire 1st & 2nd flr ceiling assembly to be upgraded to 1-hour rated assembly per info sheet fs-05; fire underground service to be submitted with sprinkler plans;upgrade ground flr to type5aDetails
convert (e) garage, storage & utility rms on 1st & 2nd flr into (6) adu's per ord#162-16, total of (54) units.entire 1st & 2nd flr ceiling assembly to be upgraded to 1-hour rated assembly per info sheet fs-05; fire underground service to be submitted with sprinkler plans;upgrade ground flr to type5a | $320,000 |
| Mar 6, 2020 | Expired or cancelled cancelled Jan 2026 | 655 Powell St | #207: convert (e) dining room to bedroom. rehabilitate (e) kitchen. rehabilitate (e) bathroom. install wasyer & dryer.Details
#207: convert (e) dining room to bedroom. rehabilitate (e) kitchen. rehabilitate (e) bathroom. install wasyer & dryer. | $35,000 | |
| Jan 17, 2020 | Never finaled issued Mar 2020, no final | 655 Powell St | Axel8 Construction | unit #405; convert existing kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer and dryerDetails
unit #405; convert existing kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer and dryer | $40,000 |
| Dec 19, 2019 | Expired or cancelled expired Apr 2022 | 655 Powell St | Axel8 Construction | unit 308 - convert (e) kitchen to study, relocation kitchen, rehabilitate (e) bathroom and install washer & dryerDetails
unit 308 - convert (e) kitchen to study, relocation kitchen, rehabilitate (e) bathroom and install washer & dryer | $36,000 |
| Nov 15, 2019 | Expired or cancelled expired Apr 2022 | 655 Powell St | Axel8 Construction | #304 -convert existing kitchen to bedroom. relocate kitchen. rehabilitate existing bathroom. install washer/dryerDetails
#304 -convert existing kitchen to bedroom. relocate kitchen. rehabilitate existing bathroom. install washer/dryer | $38,000 |
| Nov 14, 2019 | Never finaled issued Jan 2020, no final | 655 Powell St | street spaceDetails
street space | ||
| Nov 13, 2019 | Never finaled issued Nov 2019, no final | 655 Powell St | street space onlyDetails
street space only | ||
| Sep 6, 2019 | Completed final sign-off Apr 2022 | 655 Powell St | Axel8 Construction | apt 507 - convert (e) dining room to sleeping alcove; rehabilitate existing kitchen; rehabilitate (e) bathroom; install washer & dryerDetails
apt 507 - convert (e) dining room to sleeping alcove; rehabilitate existing kitchen; rehabilitate (e) bathroom; install washer & dryer | $33,000 |
| Aug 19, 2019 | Never finaled issued Aug 2019, no final | 655 Powell St | street spaceDetails
street space | ||
| Jul 31, 2019 | Completed final sign-off Dec 2019 | 655 Powell St | Axel8 Construction | unit #403 - convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom. install w/dDetails
unit #403 - convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom. install w/d | $45,000 |
| Jun 20, 2019 | Never finaled issued Jun 2019, no final | 655 Powell St | street spaceDetails
street space | ||
| May 22, 2019 | Completed final sign-off Oct 2019 | 655 Powell St | Axel8 Construction | unit #201 - convert (e) kitchen to office. relocate kitchen, rehabilitate (e) bathroom. install w/dDetails
unit #201 - convert (e) kitchen to office. relocate kitchen, rehabilitate (e) bathroom. install w/d | $36,000 |
| Mar 26, 2019 | Completed final sign-off Nov 2019 | 655 Powell St | Axel8 Construction | #503: 1)convert extg kitchen to bedroom. 2)relocate kitchen. 3)rehabilitate extg bathroom. 4)install 2nd bathroom. 5)install washer and dryer. 6) install (3) ext ventsDetails
#503: 1)convert extg kitchen to bedroom. 2)relocate kitchen. 3)rehabilitate extg bathroom. 4)install 2nd bathroom. 5)install washer and dryer. 6) install (3) ext vents | $40,000 |
| Feb 20, 2019 | Completed final sign-off Aug 2019 | 655 Powell St | unit #306: 1)convert extg kitchen to bedroom. 2) relocate kitchen. 3)rehabilitate extg bathroom. 4) install 2nd bathroom.Details
unit #306: 1)convert extg kitchen to bedroom. 2) relocate kitchen. 3)rehabilitate extg bathroom. 4) install 2nd bathroom. | $45,000 | |
| Feb 20, 2019 | Completed final sign-off Aug 2019 | 655 Powell St | Axel8 Construction | unit #202: 1)convert extg kitchen to bedroom. 2) relocate kitchen. 3)rehabilitate extg bathroom. 4) install washer and dryer.Details
unit #202: 1)convert extg kitchen to bedroom. 2) relocate kitchen. 3)rehabilitate extg bathroom. 4) install washer and dryer. | $38,000 |
| Feb 20, 2019 | Completed final sign-off Aug 2019 | 655 Powell St | Axel8 Construction | unit #606: 1)convert extg kitchen to bedroom. 2) relocate kitchen. 3)rehabilitate extg bathroom. 4) install 2nd bathroom. 5) install washer and dryerDetails
unit #606: 1)convert extg kitchen to bedroom. 2) relocate kitchen. 3)rehabilitate extg bathroom. 4) install 2nd bathroom. 5) install washer and dryer | $45,000 |
| Jan 3, 2019 | Completed final sign-off Nov 2019 | 655 Powell St | Palmera Construction Co | unit 206. convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install second bathroomDetails
unit 206. convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install second bathroom | $45,000 |
| Oct 9, 2018 | Expired or cancelled cancelled Oct 2018 | 655 Powell St | B-Side Inc. | apt 407: provide final plumbing and electrical work for in-unit. new fixtures. maher n/a.Details
apt 407: provide final plumbing and electrical work for in-unit. new fixtures. maher n/a. | $3,000 |
| Oct 9, 2018 | Never finaled issued Oct 2018, no final | 655 Powell St | B-Side Inc. | apt 207: provide final plumbing and electrical work for in-unit. new fixtures. maher n/a.Details
apt 207: provide final plumbing and electrical work for in-unit. new fixtures. maher n/a. | $3,000 |
| Oct 3, 2018 | Completed final sign-off Apr 2019 | 655 Powell St | Palmera Construction Co | #603: 1)convert extg kitchen to bedroom. 2)relocate kitchen. 3) rehabilitate extg bathroom. 4)install 2nd bathroom, 5)install washer and dryer.Details
#603: 1)convert extg kitchen to bedroom. 2)relocate kitchen. 3) rehabilitate extg bathroom. 4)install 2nd bathroom, 5)install washer and dryer. | $45,000 |
| Oct 2, 2018 | Never finaled issued Oct 2018, no final | 655 Powell St | B-Side Inc. | to obtain final inspection for work approved under pa#201612134838 & 201612134836. all work is complete.Details
to obtain final inspection for work approved under pa#201612134838 & 201612134836. all work is complete. | |
| Sep 11, 2018 | Never finaled issued Sep 2018, no final | 655 Powell St | Palmera Construction Co | unit 508: remodel existing kitchen 8x5 and bathroom 5x8. no walls to be moved or added. no change to layoutDetails
unit 508: remodel existing kitchen 8x5 and bathroom 5x8. no walls to be moved or added. no change to layout | $29,000 |
| Aug 3, 2018 | Expired or cancelled cancelled Aug 2023 | 655 Powell St | Fault Line Plumbing Inc | installation of sprinklers over garage bins.Details
installation of sprinklers over garage bins. | $3,800 |
| Jul 31, 2018 | Completed final sign-off Jan 2019 | 655 Powell St | Palmera Construction Co | #702 -convert (e) dining to study. rehabilitate (e) kitchen. rehabilitate (e) bathroom. install w/dDetails
#702 -convert (e) dining to study. rehabilitate (e) kitchen. rehabilitate (e) bathroom. install w/d | $30,000 |
| Jul 31, 2018 | Never finaled issued Aug 2018, no final | 655 Powell St | Palmera Construction Co | #608 -convert (e) kitchen into bedroom relocate kitchen. rehabilitate (e) bathroom. install w/dDetails
#608 -convert (e) kitchen into bedroom relocate kitchen. rehabilitate (e) bathroom. install w/d | $38,000 |
| Jul 9, 2018 | Never finaled issued Aug 2018, no final | 655 Powell St | Palmera Construction Co | 6th floor unit 602 - convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. inatall w/d. fire alarm system notification upgrade required under separate applicationDetails
6th floor unit 602 - convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. inatall w/d. fire alarm system notification upgrade required under separate application | $40,000 |
| Jun 25, 2018 | Completed final sign-off Nov 2018 | 655 Powell St | Palmera Construction Co | unit #404 convert (e) kitchen to bedroom. rehabilitate (e) bathroom & (e) kitchen. install w/d. no exterior work.Details
unit #404 convert (e) kitchen to bedroom. rehabilitate (e) bathroom & (e) kitchen. install w/d. no exterior work. | $38,000 |
| Jun 19, 2018 | Never finaled issued Jul 2018, no final | 655 Powell St | Palmera Construction Co | unit 704: rehabilitate existing kitchen & bathroom, install washier/dryerDetails
unit 704: rehabilitate existing kitchen & bathroom, install washier/dryer | $36,000 |
| Jun 15, 2018 | Completed final sign-off Sep 2018 | 655 Powell St | Au Electric Corporation/Aec Alarms | upgrade extg fire alarm to comply with 1103.7.6.1Details
upgrade extg fire alarm to comply with 1103.7.6.1 | $25,000 |
| May 29, 2018 | Never finaled issued Jun 2018, no final | 655 Powell St | Palmera Construction Co | unit 605 - convert (e) kitchen to bedroom; relocate kitchen, rehabilitate (e) bathroom and install washer/dryerDetails
unit 605 - convert (e) kitchen to bedroom; relocate kitchen, rehabilitate (e) bathroom and install washer/dryer | $36,000 |
| May 7, 2018 | Never finaled issued Jun 2018, no final | 655 Powell St | Palmera Construction Co | unit #506: 1)convert extg kitchen to bedroom. 2) relocate kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryer.Details
unit #506: 1)convert extg kitchen to bedroom. 2) relocate kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryer. | $40,000 |
| Feb 15, 2018 | Never finaled issued Apr 2018, no final | 655 Powell St | Palmera Construction Co | unit #501: 1)rehabilitating extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer.Details
unit #501: 1)rehabilitating extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer. | $29,000 |
| Feb 12, 2018 | Completed final sign-off Aug 2018 | 655 Powell St | Palmera Construction Co | unit #307: 1) rehabilitate extg kitchen. 2)rehabilitate extgf bathroom. 3) install washer and dryer. 4) create new study room.Details
unit #307: 1) rehabilitate extg kitchen. 2)rehabilitate extgf bathroom. 3) install washer and dryer. 4) create new study room. | $29,000 |
| Jan 30, 2018 | Never finaled issued Feb 2018, no final | 655 Powell St | Fault Line Plumbing Inc | repair existing class ii standpipe (wet-type) system. install new 3in backflow preventer.Details
repair existing class ii standpipe (wet-type) system. install new 3in backflow preventer. | $35,000 |
| Jan 18, 2018 | Never finaled issued Feb 2018, no final | 655 Powell St | Palmera Construction Co | unit #502 - rehabilitate (e) kitchen & bathroom. install w/d maher naDetails
unit #502 - rehabilitate (e) kitchen & bathroom. install w/d maher na | $29,000 |
| Nov 6, 2017 | Never finaled issued Feb 2018, no final | 655 Powell St | Palmera Construction Co | untit #208: convert existing kitchen to den, relocate existing kitchen, rehabilitate existing bath, install washer and dryerDetails
untit #208: convert existing kitchen to den, relocate existing kitchen, rehabilitate existing bath, install washer and dryer | $25,000 |
| Nov 6, 2017 | Never finaled issued Feb 2018, no final | 655 Powell St | Palmera Construction Co | rehabilitate existing kitchen, rhabilitate existing bath, install washer and dryer, convert dining rm to sleeping nookDetails
rehabilitate existing kitchen, rhabilitate existing bath, install washer and dryer, convert dining rm to sleeping nook | $30,000 |
| Nov 1, 2017 | Never finaled issued Nov 2017, no final | 655 Powell St | Palmera Construction Co | unit #301 - rehabilitate e kitchen, rehabilitate e. bath, install washer dryerDetails
unit #301 - rehabilitate e kitchen, rehabilitate e. bath, install washer dryer | $25,000 |
| Nov 1, 2017 | Never finaled issued Nov 2017, no final | 655 Powell St | Palmera Construction Co | unit #401 - convert e kitchen to bedroom, relocate kitchen, rehabilitate bath, install washer/dryerDetails
unit #401 - convert e kitchen to bedroom, relocate kitchen, rehabilitate bath, install washer/dryer | $30,000 |
| Nov 1, 2017 | Never finaled issued Nov 2017, no final | 655 Powell St | Palmera Construction Co | unit #204 - convert e kitchen to bedroom, relocate e kitchen, rehabilitate e bath, install washer dryerDetails
unit #204 - convert e kitchen to bedroom, relocate e kitchen, rehabilitate e bath, install washer dryer | $18,000 |
| Feb 15, 2017 | Completed final sign-off Jun 2017 | 655 Powell St | D F K Y Construction Inc | #703 - rehabilitate existing bathrom, relocate existing kitchen, convert existing kitchen to bedroom, install bathroom, install washer & dryer.Details
#703 - rehabilitate existing bathrom, relocate existing kitchen, convert existing kitchen to bedroom, install bathroom, install washer & dryer. | $48,000 |
| Dec 13, 2016 | Never finaled issued Dec 2016, no final | 655 Powell St | B-Side Inc. | unit #407. cabinet replacement in kitchen and tile replacement in bathroom. no walls to be opened. no plumbing or electrical. no alteration of wall, window and door.Details
unit #407. cabinet replacement in kitchen and tile replacement in bathroom. no walls to be opened. no plumbing or electrical. no alteration of wall, window and door. | $10,000 |
| Dec 13, 2016 | Never finaled issued Dec 2016, no final | 655 Powell St | B-Side Inc. | unit #207. cabinet replacement in kitchen and tile replacement in bathroom. no walls to be opened. no plumbing or electrical. no alteration of wall, window and door.Details
unit #207. cabinet replacement in kitchen and tile replacement in bathroom. no walls to be opened. no plumbing or electrical. no alteration of wall, window and door. | $10,000 |
| Aug 26, 2016 | Never finaled issued Aug 2016, no final | 655 Powell St | D F K Y Construction Inc | remodel unit 608, 7th floor - remodel (e) bathroom, relocate (e) kitchen, add washer/dryer, convert (e) kitchen to bedroomDetails
remodel unit 608, 7th floor - remodel (e) bathroom, relocate (e) kitchen, add washer/dryer, convert (e) kitchen to bedroom | $35,000 |
| Dec 16, 2013 | Never finaled issued Dec 2013, no final | 655 Powell St | street spaceDetails
street space | ||
| Nov 10, 2009 | Never finaled issued Nov 2009, no final | 655 Powell St | sidewalk repairDetails
sidewalk repair |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Axel8 Construction (18), Palmera Construction Co (18), B-Side Inc. (5), Au Electric Corporation/Aec Alarms (2), D F K Y Construction Inc (2), Doherty Restoration, Inc. (2), Fault Line Plumbing Inc (2), Bay Area Activo Inc., O'connor Plumbing & Fire Protection, Redlog Flooring Services Corp
- Architects
- Joe Kon (2), Joe Won, Serina Calhoun
- Engineers
- Joe Win Kon (4), Joe Kon (2)