Block 0779, lot 014
990 Fulton St
56 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 3, 2025 | Completed | 990 Fulton St | G T M Works Llc Dba Greentree Maint | unit 406: repair approx. 3x6ft area of hardwood flooring. perform all repairs in the bathroom and living room (approx. 90 sqft total). install 3-piece quartz panel set on tub walls. | $27,620 |
| Aug 6, 2025 | Completed | 990 Fulton St | Axel8 Construction | at 1st to 6th floors back stairway: replace plaster on walls in kind with sheetrock, typical 25 sq ft on each floor. | $20,000 |
| Feb 21, 2025 | Expired or cancelled | 990 Fulton St | Redlog Flooring Services Corp | 1st to 5th floors.- replacement of plaster in kind, hallway will have new plaster. 25 sqft wide typical on each floor. replace plaster in kind. | $20,000 |
| Aug 2, 2023 | Completed | 990 Fulton St | B-Side Inc. | unit 502: covert (e) kitchen to study. relocate kitchen. rehabilitate existing bathroom. install washer and dryer. | $60,000 |
| Sep 1, 2022 | Expired or cancelled | 990 Fulton St | B-Side Inc. | unit #402: convert (e) kitchen to study, relocate kitchen, rehabilitate (e) bathroom, install washer and dryer | $38,000 |
| Dec 6, 2021 | Completed | 990 Fulton St | B-Side Inc. | unit 505: rehabilitate existing bathroom. install washer and dryer. no removal of structural walls. | $16,000 |
| Oct 7, 2021 | Completed | 990 Fulton St | #404:convert extg kitchen to study. relocate kitchen. rehab extg bathroom. install washer and dryer. | $40,000 | |
| Jul 19, 2021 | Completed | 990 Fulton St | B-Side Inc. | unit #506: convert (e0 kitchen and dining to study, relocate kitchen, rehabilitate (e) bathroom, install washer and dryer | $42,000 |
| Jul 2, 2021 | Completed | 990 Fulton St | B-Side Inc. | unit #305: 1) revision to app202104098240(kitchen & bath only- no plans). 2)convert extg kitchen to study. 3) relocate kitchen. 4)rehabilitate extg bathroom. 5)install washer and dryer | $25,000 |
| Jun 15, 2021 | Never finaled | 990 Fulton St | B-Side Inc. | unit #506:bath and kitchen remodel,like for like. no removing any walls. | $36,000 |
| Apr 9, 2021 | Never finaled | 990 Fulton St | B-Side Inc. | #305, rehab kitchen (1). rehab bathroom (1). no new or existing wall relocation. like for like. new lighting shall comply with 150.0 (k) 3a(k) 5 | $25,000 |
| Sep 5, 2019 | Expired or cancelled | 990 Fulton St | Au Electric Corporation/Aec Alarms | upgrade existing fire alarm to comply with sffc 1103.7.6.1 & nfpa 72. permit #201806151989. 1st as build #201902273913 | |
| May 22, 2019 | Expired or cancelled | 990 Fulton St | Architectural Fenestration & Restoration | at units 102, 202 & 303, replace 8 windows per unit (24 total) at corner w/double-hung wood windows w/integrated ogees and true divided lites to match original. all w/in (e) openings. no other work. | $22,800 |
| Mar 29, 2019 | Completed | 990 Fulton St | Axel8 Construction | rehabilitate (e) kitchen, rehabilitae (e) bathroom,install washer & dryer | $36,000 |
| Feb 27, 2019 | Completed | 990 Fulton St | Au Electric Corporation/Aec Alarms | as-builts for approved pa #201806151989. upgrade (e) fire alarm to compy with sffc 1103.7.6.1 | |
| Oct 9, 2018 | Completed | 990 Fulton St | Casman Construction Inc | unit #504: trehabilitate (e) kitchen and bathroom. install w/d | $32,000 |
| Jun 20, 2018 | Never finaled | 990 Fulton St | street space | ||
| Jun 15, 2018 | Completed | 990 Fulton St | Au Electric Corporation/Aec Alarms | upgrade extg fire alarm to comply with 1103.7.6.1 | $35,000 |
| May 9, 2018 | Completed | 990 Fulton St | Brighter Bay Builders Inc | unit #203: 1) rehabilitate extg kitchen. 2) rehabilitate extg bathroom. 3)install washer and dryer | $35,000 |
| May 9, 2018 | Completed | 990 Fulton St | Brighter Bay Builders Inc | unit #403: 1) rehabilitate extg kitchen. 2) rehabilitate extg bathroom. 3)install washer and dryer | $35,000 |
| Mar 15, 2018 | Never finaled | 990 Fulton St | street space | ||
| Feb 14, 2018 | Never finaled | 990 Fulton St | street space | ||
| Jan 25, 2018 | Never finaled | 990 Fulton St | street space | ||
| Nov 30, 2017 | Never finaled | 990 Fulton St | street space permit | ||
| Nov 10, 2017 | Completed | 990 Fulton St | Brighter Bay Builders Inc | work in unit # 101, convert existing kitchen to bedroom - relocate kitchen, rehabilitate existing bathroom and install washer & dryer | $33,000 |
| Sep 20, 2017 | Never finaled | 990 Fulton St | street space | ||
| Aug 31, 2017 | Never finaled | 990 Fulton St | street space | ||
| Aug 15, 2017 | Completed | 990 Fulton St | Brighter Bay Builders Inc | unit #207: convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom. install washer & dryer. no exterior changes udner this permit. | $28,000 |
| Aug 15, 2017 | Completed | 990 Fulton St | Brighter Bay Builders Inc | unit #104: rehabilitate (e) kitchen & bathroom, install nook, install washer & dryer. no exterior work under this permit. | $35,000 |
| Jun 27, 2017 | Never finaled | 990 Fulton St | street space permit | ||
| Apr 27, 2017 | Never finaled | 990 Fulton St | Boss Construction Inc. | unit 401 -convert existing kitchen to bedroom; relocate kitchen, rehabilitate existing bathroom, install washer/dryer. maher na | $40,000 |
| Oct 21, 2016 | Never finaled | 990 Fulton St | street space | ||
| Aug 5, 2016 | Never finaled | 990 Fulton St | street space | ||
| Jun 14, 2016 | Expired or cancelled | 990 Fulton St | unit #507: revision to ref pa 2016 0224 0373: move w.d. reconfigure kitchen - remove peninsula | ||
| May 20, 2016 | Never finaled | 990 Fulton St | street space | ||
| Feb 24, 2016 | Completed | 990 Fulton St | Shen Hao Construction Inc | #405 - revision to appl #201512215615 - floor plans layout revision. | $20,000 |
| Feb 24, 2016 | Never finaled | 990 Fulton St | Palmera Construction Co | #507 - relocate kitchen, remodel existing bathroom, convert (e) kitchen to bedroom, add washer & dryer. | $30,000 |
| Feb 10, 2016 | Completed | 990 Fulton St | Shen Hao Construction Inc | #205- revision to pa# 201509116683 revise plan layout @ unit #205 | |
| Jan 22, 2016 | Expired or cancelled | 990 Fulton St | Shen Hao Construction Inc | bath remodel in kind. no change to wall locations of fixture locations. ref 201509116683 | $13,000 |
| Dec 21, 2015 | Never finaled | 990 Fulton St | Palmera Construction Co | remodel unit 501 at 6th fl. remodel existing bath. relocate existing kitchen. add bedroom and washer dryer. remove non-bearing walls. | $25,000 |
| Dec 21, 2015 | Completed | 990 Fulton St | Shen Hao Construction Inc | remodel unit 405 at 5th fl. remodel existing bath. relocate and remodel (e) kitchen. convert existing kitchen to bedroom. add washer dryer. bedroom added to room w/ fire escape vif that access is maintained. no locks on door. | $25,000 |
| Oct 8, 2015 | Never finaled | 990 Fulton St | street space | ||
| Sep 11, 2015 | Expired or cancelled | 990 Fulton St | Shen Hao Construction Inc | 1)unit #205 at 3rd floor. 2)remodel extg kitchen. 3)add washer and dryer. | $15,000 |
| Sep 11, 2015 | Completed | 990 Fulton St | Shen Hao Construction Inc | 1)unit #107 at 2nd floor. 2)remodel extg kitchen. 3)add washer and dryer. | $15,000 |
| Jun 29, 2015 | Completed | 990 Fulton St | to obtain final inspection for work approved under pa#2006/09/18/2533. all work is complete. | ||
| Oct 2, 2013 | Completed | 990 Fulton St | M H M Construction | revise scope of work appl. #201307242633. remove closet across from kitchen due to structure integrity per building inspector request. | |
| Jul 24, 2013 | Completed | 990 Fulton St | M H M Construction | interior remodel in apt 505: remove non-load bearing walls to relocate kitchen. provide new bedroom. remodel extg bath. electrical and plmg work as necessary. replace lighting with high efficacy lighting. | $20,000 |
| May 16, 2008 | Expired or cancelled | 990 Fulton St | F B E And Sons General Const | apt# 207. renew pa# 2006/09/18/2533. (kitchen & bathroom remodel. no structurl work) | $10,000 |
| Apr 15, 2008 | Expired or cancelled | 990 Fulton St | Schoepp Construction Inc | unit#305. kitchen remodel/bath countertops, cabinets, sink, (b) toilet, sink, vanity. | $15,000 |
| Jan 17, 2008 | Completed | 990 Fulton St | Schoepp Construction Inc | renew pa#200609152419 for final inspection. | |
| Nov 13, 2007 | Expired or cancelled | 990 Fulton St | Schoepp Construction Inc | work @ unit# 406 & unit# 501 only. remodel 2 kitchen, 2 bath, countertops, sink, cabinets kit, sink, toilet bath. | $30,000 |
| Jun 18, 2007 | Completed | 990 Fulton St | Schoepp Construction Inc | work on unit#101. remodel (1) kitchen & (1 ) bath (1) countertops, cabinets. (2) new sink in bathroom. non structural, no lighting. | $15,000 |
| Oct 4, 2006 | Completed | 990 Fulton St | Schoepp Construction Inc | remodel kchn. new cabs, sink, counter top in apt 304/no new lighting | $14,000 |
| Sep 18, 2006 | Expired or cancelled | 990 Fulton St | F B E And Sons General Const | comply with nov 200563195 9-8-05 interior renovation apt. 207 -5/8 type "x" throughout for new work. no structural work. | $10,000 |
| Sep 15, 2006 | Expired or cancelled | 990 Fulton St | Schoepp Construction Inc | demo kitchen, replace cabinets & counter top. | $5,800 |
| Jul 15, 2004 | Never finaled | 990 Fulton St | side walk repair |