Block 0303, lot 001
825 Post St
120 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 9, 2025 | Completed | 825 Post St | Redlog Flooring Services Corp | whole bldg: face maintenence, repair in kind, touch up damaged windows, paint and primer, ext work. all work is exterior. a3 new window max factor. | $90,000 |
| Nov 12, 2025 | Completed | 825 Post St | Au Electric Corporation/Aec Alarms | building has an existing local fire alarm system with manual pull stations,bells & fully sprinklered in all common areas scope of work is to install a new fire alarm system,replacing existing devices on a like-for-like & adding low-frequency sounders in all sleeping areas | $110,000 |
| Apr 1, 2025 | Completed | 825 Post St | B-Side Inc. | unit# 116, #216 & #316 abate nov #20240756. rehabilitate and repair in kind fire damages at each unit. replace floor framing at unit #316 living room | $400,000 |
| Feb 18, 2020 | Never finaled | 825 Post St | Nomellini Construction * Ask For Id * | apt 518: remodel ktichen &b athroom. no structural changes or exterior work work rq. no change to wall layouts. all work within unit. no fire alarm or sprinkler work req. | $25,000 |
| Sep 6, 2019 | Completed | 825 Post St | Nomellini Construction * Ask For Id * | unit 405: kitchen & bath remodel. no structural/no exterior work. all work within unit. no change to wall and opening layout. no fire alram or sprinkler work req. | $30,000 |
| May 30, 2019 | Completed | 825 Post St | Nomellini Construction * Ask For Id * | unit 401: kitchen and bathroom remodel. no structural/no exterior work. no change to wall layout. all work within unit. no fire alarm or sprinkler work required. | $25,000 |
| Mar 27, 2019 | Completed | 825 Post St | Nomellini Construction * Ask For Id * | unit 303. kitchen and bathroom remodel. neither exterior nor structural work done. all work done within unit. no change in wall layout. no fire sprinkler work req. kitchen 72 sq ft, bath 40 sq ft | $25,000 |
| Jan 8, 2019 | Completed | 825 Post St | Nomellini Construction * Ask For Id * | kitchen and bath remodel. no structural, no ext work no change in wall layout. all work within unit no fire alarm or sprinkler work req | $25,000 |
| Dec 13, 2018 | Completed | 825 Post St | Nomellini Construction * Ask For Id * | unit#322 - replace (e) kitchen cabinets. unit #324 - add new gfo to counter, replace kitchen cabinets, paint ceiling in bathroom. replace damaged drywall btw both units and paint both kitchens. 5/8" drywall type x for unit seperation | $25,000 |
| Nov 13, 2018 | Completed | 825 Post St | Nomellini Construction * Ask For Id * | unit 501: kitchen and bathroom remodel. no structural/no exterior work. no change in layout. all work within unit. no fire alarm or sprinker work. no wall modification. | $25,000 |
| Jul 5, 2018 | Completed | 825 Post St | Nomellini Construction * Ask For Id * | unit 218: kitchen & bath remodel, no structural changes, no exterior work | $25,000 |
| Apr 11, 2018 | Completed | 825 Post St | unit #111: kitchen and bathroom remodel/no structural changes. lighting per cec 150.0 (k) | $25,000 | |
| Mar 2, 2018 | Completed | 825 Post St | Nomellini Construction * Ask For Id * | unit 225: kitchen and (1) bathroom remodel. no structural changes. no change in walls, openings and layout | $25,000 |
| Feb 1, 2017 | Completed | 825 Post St | Nomellini Construction * Ask For Id * | #125- renovation kitchen and bathroom, no structural changes, using correct layout. | $25,000 |
| Jan 10, 2017 | Completed | 825 Post St | Nomellini Construction * Ask For Id * | #425. 1. kitchen and 1 bath remodel as like. no alteration of wall, window and door. | $25,000 |
| Dec 9, 2016 | Completed | 825 Post St | Nomellini Construction * Ask For Id * | apt 512: kitchen & bathroom renovation. using current layout. no structural changes. | $25,000 |
| Sep 27, 2016 | Completed | 825 Post St | Nomellini Construction * Ask For Id * | apt 120: kitchen & bathroom renovation. using (e) layout/no structural changes/work done. no alt of walls, window or door. | $25,000 |
| Jun 13, 2016 | Completed | 825 Post St | High Quality Roofing | reroofing | $20,000 |
| Apr 7, 2016 | Completed | 825 Post St | Pyro-Comm Systems, Inc. | new fire alarm devices added to rooftop deck of an existing building to include: (2) pull stations and (1) bell, roof top dec, ref. 201403170892. | $1,500 |
| Mar 23, 2016 | Completed | 825 Post St | Hon's Construction Inc. | revision to 201403170892; addition of emergency lighting (per inspector's request), revised exterior tile 24 report. | $8,000 |
| Nov 4, 2015 | Never finaled | 825 Post St | streetspace | ||
| Oct 19, 2015 | Never finaled | 825 Post St | street space | ||
| Sep 21, 2015 | Completed | 825 Post St | Nomellini Construction * Ask For Id * | units 209 &123 | $18,000 |
| Sep 21, 2015 | Never finaled | 825 Post St | High Quality Roofing, Rain Defense | reroofing | $75,000 |
| Aug 14, 2015 | Completed | 825 Post St | Hon's Construction Inc. | revision to permit 201403170892; adjustment of light fixtures, new title 24. | |
| Jun 2, 2015 | Completed | 825 Post St | Nomellini Construction * Ask For Id * | unit #521: remove & replace (e) kitchen & bath cabinets,supply plumbing & elec to new areas of remodel supply tile, fixtures, counters, redo hardwood or provide vynl flooring,paint,no structural or wall work. | $18,000 |
| Mar 31, 2015 | Completed | 825 Post St | Nomellini Construction * Ask For Id * | unit 503:remove extg cabinets. install plmg and elect. for extg kitchen and bath. install cabinets and counters. paint apt. install vinyl floor or redo hardwood. | $18,000 |
| Jan 5, 2015 | Never finaled | 825 Post St | street space permit | ||
| Jan 5, 2015 | Never finaled | 825 Post St | street space permit | ||
| Jan 5, 2015 | Never finaled | 825 Post St | street space permit | ||
| Oct 15, 2014 | Completed | 825 Post St | Nomellini Construction * Ask For Id * | unit 102 - remove kitchen cabinets, install new plumbing & electrical to accomodate new kitchen bath remodel. install flooring or redo hardwood. paint apartment | $15,000 |
| Jul 21, 2014 | Completed | 825 Post St | Nomellini Construction * Ask For Id * | to comply with nov 201482781. replace missing ladders for compliance (fire escape ladders) | $7,500 |
| Jun 4, 2014 | Completed | 825 Post St | Nomellini Construction * Ask For Id * | remove existing cabinets, provide plumbing & electrical to new kitchen & bath layout. provide laminate flooring or refinish hardwood floors. paint apartment. lighting control per cec 150(k) unit 408 | $15,000 |
| May 13, 2014 | Completed | 825 Post St | Nomellini Construction * Ask For Id * | unit 515 - remove existing kitchen and bath cabinets, rpovide electrical and plumgin to existing locations, tape and paint, refinish existing hardwood or provide laminate flooring. no changes in layout. no walls moved removed or added | $15,000 |
| Mar 17, 2014 | Completed | 825 Post St | Hon's Construction Inc., Nomellini Construction * Ask For Id * | all exterior main entry doors to be replace in kind. repaint, replace and add surface mtd ceiling lights and recessed wall lightrs in all common hallways. open walls for structure of roof deck. addition of roof deck and stair penthouse. relocate of doors at laundry and garbage room. | $160,000 |
| Jan 10, 2014 | Expired or cancelled | 825 Post St | to erect electric, existing awning / canopy, single faced sign. | $4,500 | |
| Jan 10, 2014 | Completed | 825 Post St | Hon's Construction Inc. | replace 7 exterior lights and 1 canopy. addition of 14 exterior wall mtd lights at street level. altering post street gate & leavenworth side-gate. | $4,000 |
| Jan 8, 2014 | Never finaled | 825 Post St | Nomellini Construction * Ask For Id * | demo exisitng kitchen & bathrooms, install plumbing & electrical to these areas, paint,install new kitchen cabinets, tile floora reuse existing clawfoot tub, paint apt. in units 412 & 117 | $20,000 |
| Apr 11, 2012 | Never finaled | 825 Post St | Rayco Development Solutions Inc | #301: installing toilet, vanity sink and faucet, kitchen sink and faucet, kitchen disposal, wall switches | $5,000 |
| Feb 19, 2010 | Completed | 825 Post St | Make Ready Maintenance Inc | unit # 216: remodel kitchen w/new cabinets, counter top, like for like plumbing and electrical upgrade, new lighting per cec 150(k) no change to exhaust system, no structural work | $7,500 |
| Jun 8, 2009 | Completed | 825 Post St | Pankow Special Projects Lp | structural repair of (e) front masonry stairs. new material to match (e) marble. | $5,000 |
| Jan 6, 2009 | Completed | 825 Post St | F B E And Sons General Const | work on apt#120. replace kitchen counter and sink. replace floor tile on existing floor-replace bathroom pedestal sink and faucet. no structural work -no lighting work. | $6,500 |
| Oct 1, 2008 | Never finaled | 825 Post St | street space permit only. | ||
| Sep 25, 2008 | Completed | 825 Post St | F B E And Sons General Const | apt#109. kitchen and bathroom remodel . remove and replace cabinet, counter, floor & wall tiles. no structural work, no lighting work. replace window bathroom lightwell in kind. | $15,000 |
| Jul 31, 2008 | Completed | 825 Post St | F B E And Sons General Const | work @ unit# 524 only. amended pa# 2008/06/13/4358. incorrect apartment# 401. correct apartment# 524. kitchen & bathroom remodel. no structural work. no lighting work. | |
| Jul 18, 2008 | Never finaled | 825 Post St | street space permit. ref 200806134358. | ||
| Jun 13, 2008 | Completed | 825 Post St | F B E And Sons General Const | work @ apt# 310, # 312 & # 401 only. kitchen & bathroom remodel. no structural work. no lighting work. replace window bathroom in the lightwell. | $45,000 |
| May 22, 2008 | Completed | 825 Post St | F B E And Sons General Const | work @ apt# 121 only. kitchen & bathroom remodel. no structural work. no lighting work. remove & replace cabinet, counter, front wall tile. replace window, bathroom lightwell. same size & location. | $15,000 |
| May 8, 2008 | Never finaled | 825 Post St | street space | ||
| Apr 28, 2008 | Completed | 825 Post St | F B E And Sons General Const | apt#414. ktichen & bathroom remodel. no structural work. no lightning work. remove & replace cabinet counter floor & wall tiles. replace window bathroom lightwell in kind. | $15,000 |
| Mar 5, 2008 | Completed | 825 Post St | F B E And Sons General Const | apt#520- revision to 200712059679, change apt number from 205 to 520 instead. | |
| Mar 5, 2008 | Completed | 825 Post St | F B E And Sons General Const | apt 215- kitchen and bathroom remodel. no structural work, no lighting, replace bathroom window in lightwell, replace kitchen cabinet, counter, floor & wall tiles. | $15,000 |
| Feb 5, 2008 | Never finaled | 825 Post St | street space | ||
| Jan 30, 2008 | Never finaled | 825 Post St | street space permit only. | ||
| Jan 23, 2008 | Completed | 825 Post St | On-Site Maintenance | renew pa #200704027762 & #200707035919 for unit 407 & 417 for final inspection. | |
| Jan 23, 2008 | Completed | 825 Post St | On-Site Maintenance | renew pa #200702234757 & #200705020189 for final inspection at unit #115 & 119. | |
| Jan 23, 2008 | Never finaled | 825 Post St | On-Site Maintenance | renew pa#200706143958 at unit 506 for final inspection. | |
| Dec 28, 2007 | Completed | 825 Post St | F B E And Sons General Const | work @ apt# 303, # 402, # 406, # 419, # 422, # 516, & # 517 only. 7 kitchens & 7 bathrooms remodel. no structural work. no lighting work. replace window, bathroom lightwell. | $101,500 |
| Dec 5, 2007 | Completed | 825 Post St | F B E And Sons General Const | work @ apt# 105, # 106, # 123, # 205, # 222 & # 307 only. 6 kitchen & 6 bathroom remodel. no structural work. no lighting work. replace window bathroom lightwell. | $90,000 |
| Dec 3, 2007 | Never finaled | 825 Post St | street space only | ||
| Nov 29, 2007 | Never finaled | 825 Post St | street space permit | ||
| Nov 20, 2007 | Completed | 825 Post St | On-Site Maintenance | work on unit#306. revise permit app#200702264855 to include (3) new windos, interior finishes all electrical upgrade 1 bathroom (1) window & (2) kitchen. all windows to be replaced in kind. | $15,000 |
| Nov 19, 2007 | Expired or cancelled | 825 Post St | repair/add 1-hr roof to lightwell in units 115 & 119. repair lightwell wall as req'd from ground floor to first floor. | $3,000 | |
| Nov 8, 2007 | Completed | 825 Post St | On-Site Maintenance | work on unit#308: kitchen & bath remodel in kind. no structural changes. kitchen + bath fluorescent lighting or motion control sensor. | $15,000 |
| Sep 27, 2007 | Completed | 825 Post St | F B E And Sons General Const | work @ apt# 103, # 203, # 206, # 221, # 411, # 511 & # 514 only. kitchen & bathroom remodel. lighting to remain. no structural work. replace bath windows. not visible from the street. | $105,000 |
| Sep 11, 2007 | Never finaled | 645 Leavenworth St | street space permit | ||
| Sep 6, 2007 | Never finaled | 825 Post St | street space | ||
| Aug 31, 2007 | Completed | 825 Post St | On-Site Maintenance | unit#314.rernew pa#200702264859 for final inspection. | |
| Aug 31, 2007 | Completed | 825 Post St | On-Site Maintenance | unit#315.rernew pa#2006702264860 for final inspection. | |
| Aug 23, 2007 | Completed | 825 Post St | F B E And Sons General Const | work @ apt# 108, # 202, # 210, # 211 & # 207. kitchen & bathroom remodel in kind. no structural changes. no lighting changes. replace bathroom window in lightwell. | $75,000 |
| Aug 23, 2007 | Completed | 825 Post St | F B E And Sons General Const | work @ apt# 510, #518, #519, #522 & #525 only. kitchen & bathroom remodel in kind. no structural changes. no lighting changes. replace bathroom window in lightwell. | $75,000 |
| Aug 23, 2007 | Completed | 825 Post St | F B E And Sons General Const | work @ apt# 403, # 409, #410, #418 & #311 only. kitchen & bathroom remodel in kind. no structural changes. no lighting changes. replace bathroom window in lightwell. 50% of wattage of kitchen lighting to be fluorescant. bathroom lighting to be fluorescant or on sensor. no structural work. | $75,000 |
| Aug 22, 2007 | Never finaled | 825 Post St | repair dry rot in unit #115. revision to permit # 2007/05/02/0189 and # 2007/07/12/6587 | $2,500 | |
| Aug 22, 2007 | Never finaled | 825 Post St | street space | ||
| Aug 17, 2007 | Never finaled | 825 Post St | street space | ||
| Aug 7, 2007 | Never finaled | 645 Leavenworth St | street space permit | ||
| Aug 7, 2007 | Completed | 825 Post St | On-Site Maintenance | #318- kitchen/bathroom remodel in kind.no structural chagnes.no window door or wall alterations. kitchen at least 50%of lighting wattage must be fluorescent. bath fluorescent or motion controlled sensor.exhaust termination 3'min.from property line & bldg. opening. | $15,000 |
| Aug 7, 2007 | Completed | 825 Post St | On-Site Maintenance | #201- kitchen/bath remodel in kind. no structural changes. no window door or wall alteration. kitchen at least 50% of lieghting wattage must be fluorescent. bath fluorescent or motion controlled sensor.exhaust termination 3'min.from property line & bldg. openings. | $15,000 |
| Jul 12, 2007 | Never finaled | 825 Post St | demo non-bearing walls in unit #115. bldg not sprinklered | $500 | |
| Jul 9, 2007 | Never finaled | 645 Leavenworth St | streetspace | ||
| Jul 3, 2007 | Never finaled | 825 Post St | On-Site Maintenance | work @ unit# 417 only. amend pa# 2007/06/14/3957 for unit # change from # 419 to unit# 417 only. no new work. | |
| Jul 2, 2007 | Expired or cancelled | 825 Post St | revision to app 200706143957.work to be done in unit#419 not #414. | ||
| Jun 14, 2007 | Expired or cancelled | 825 Post St | On-Site Maintenance | #323-1 kitchen,1 bathroom remodel in kind.no structural changes.building,plumbing & electrical code upgrades.no window,door or wall alterations.kitchen:at least 50% of lighting wattage must be fluorescent.bath:fluorescent or motion controlled sensor.exhaust termination 3'min.for pl & bldg.opening. | $15,000 |
| Jun 14, 2007 | Never finaled | 825 Post St | On-Site Maintenance | #506-1 kitchen,1 bathroom remodel in kind.no structural changes.building,plumbing & electrical code upgrades.no window,door or wall alterations.kitchen:at least 50% of lighting wattage must be fluorescent.bath:flourescent or motion controlled sensor.exhaust termination 3'min.from pl & bldg. opening | $15,000 |
| Jun 14, 2007 | Never finaled | 825 Post St | On-Site Maintenance | #419-1 kitchen,1 bathroom remodel in kind.no structural changes.building,plumbing & electrical code upgrades.no window,wall or door alterations.kitchen at least 50%of lighting wattage must be fluorescent.bath:fluorescent or motion controlled sensor.exhaust termination 3'min from pl & bldg. opening. | $15,000 |
| Jun 14, 2007 | Never finaled | 825 Post St | On-Site Maintenance | #119-1 kitchen,1bathroom remodel in kind.no structural changes.building,plumbing & electrical code upgrades.no window,door or wall alterations.kitchen:at least 50% of lighting wattage must be fluorescent.bath:fluorescent or motion controlled sensor.exhaust termination 3'min.from pl & bldg. opening. | $15,000 |
| Jun 14, 2007 | Never finaled | 825 Post St | On-Site Maintenance | #407-1 kitchen,1 bathroom remodel in kind.no structural changes.buildign,plumbing & electrical code upgrades.no window,door or wall alterations.kitchen:at least 50% of lighting wattage must be fluorescent.bath:fluorescent or motion controlled sensor.exhaust termination 3'min.from pl & bldg. opening. | $15,000 |
| May 30, 2007 | Never finaled | 645 Leavenworth St | street space permit | ||
| May 23, 2007 | Never finaled | 825 Post St | street space | ||
| May 21, 2007 | Never finaled | 825 Post St | street space | ||
| May 2, 2007 | Never finaled | 825 Post St | remove bearing walls in unit #115 & 201, install new posts & beam. remove non bearing walls in indicated untis. replace fire damaged members in unit #119. | $19,000 | |
| Apr 30, 2007 | Completed | 825 Post St | On-Site Maintenance | kitchne /bath remodel in kind. no structural changes. building plumbing & electrical code upgrades.no window door or wall alterations. kitchen: at least 50% of lighting wattage must be flourescent. bath: flourescent of montion controlled sensor. | $15,000 |
| Apr 30, 2007 | Never finaled | 825 Post St | On-Site Maintenance | kitchne /bath remodel in kind. no structural changes. building plumbing & electrical code upgrades.no window door or wall alterations. kitchen: at least 50% of lighting wattage must be flourescent. bath: flourescent of montion controlled sensor. | $15,000 |
| Apr 30, 2007 | Completed | 825 Post St | On-Site Maintenance | kitchne /bath remodel in kind. no structural changes. building plumbing & electrical code upgrades.no window door or wall alterations. kitchen: at least 50% of lighting wattage must be flourescent. bath: flourescent of montion controlled sensor. | $15,000 |
| Apr 30, 2007 | Expired or cancelled | 825 Post St | On-Site Maintenance | kitchne /bath remodel in kind. no structural changes. building plumbing & electrical code upgrades.no window door or wall alterations. kitchen: at least 50% of lighting wattage must be flourescent. bath: flourescent of montion controlled sensor. | $15,000 |
| Apr 13, 2007 | Expired or cancelled | 825 Post St | On-Site Maintenance | unit #321- kitchen/bath remodel in kind. no structural changes. building, plumbing & electrical code upgrades. no window door or wall alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath- fluorescent or motion controlled sensor. | $15,000 |
| Apr 13, 2007 | Completed | 825 Post St | On-Site Maintenance | unit #523- 1 kitchen 1 bath remodel in kind. no structural changes. building, plumbing & electrical code upgrades. no window door or wall alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath- fluorescent or motion controlled sensor. | $15,000 |
| Apr 13, 2007 | Completed | 825 Post St | On-Site Maintenance | unit #420- 1 kitchen, 1 bath remodel in kind. no structural chagnes. building, plumbing & electrical code upgrades. no window door or wall alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath- fluorescent or motion controlled sensor. | $15,000 |
| Apr 13, 2007 | Completed | 825 Post St | On-Site Maintenance | unit #423- 1 kitchen, 1 bath remodel in kind. no structural changes. building, plumbing & electrical code upgrades. no window, door or wall alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath- fluorescent or motion controlled sensor. | $15,000 |
| Apr 13, 2007 | Never finaled | 825 Post St | On-Site Maintenance | unit #320- 1 kitchen, 1 bath remodel in kind. no structural changes. building, plumbing & electrical code upgrades. no window door or wall alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath- fluorescent or motion controlled sensor. | $15,000 |
| Apr 13, 2007 | Expired or cancelled | 825 Post St | On-Site Maintenance | unit #225- 1 kitchen 1 bath remodel in kind. no structural changes. building, plumbing & electrical code upgrades. no window door or wall alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath: fluorescent or motion controlled sensor. | $15,000 |
| Apr 6, 2007 | Completed | 825 Post St | On-Site Maintenance | unit #319- kitchen/bath remodel in kind.no structural changes. buildign, plumbing & electrical code upgrades. n o window or door alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath fluorescent or motion controlled sensor. | $15,000 |
| Apr 6, 2007 | Expired or cancelled | 825 Post St | On-Site Maintenance | unit #421- kitchen/bath remodel in kind.no structural changes. building, plumbing & electrical code upgrades. no window or doors alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath fluorescent or motion controlled sensor. | $15,000 |
| Apr 6, 2007 | Completed | 825 Post St | On-Site Maintenance | unit #317- kitchen/bath remodel in kind.no structural changes. building, plumbing & electrical code upgrades. no window or door alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath fluorescent or motion controlled sensor. | $15,000 |
| Apr 6, 2007 | Expired or cancelled | 825 Post St | On-Site Maintenance | unit #107 -kitchen/bathroom remodel in kind. no structural changes. building, plumbing & electrical code upgrades.no window or door alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath flourescent or motion controlled sensor. | $15,000 |
| Apr 2, 2007 | Never finaled | 825 Post St | On-Site Maintenance | unit #407- kitchen/bath remodel in kind. no structural changes. building, plumbing & electrical code upgrades. no window or door alterations. kitchen: at least 50% of lighting wattage must be fluorescent. bath: fluorescent of motion controlled sensor. | $15,000 |
| Apr 2, 2007 | Completed | 825 Post St | On-Site Maintenance | unit #125- kitchen/bath remodel in kind.no structural changes. building, plumbing & electrical code upgrades. no window or door alterations. kitchen: at least 50% of lighting wattage must be fluorescent. bath: fluorescent or motion controlled sensor. | $15,000 |
| Apr 2, 2007 | Expired or cancelled | 825 Post St | On-Site Maintenance | unit #505- kitchen/bath remodel in kind. no structural changes. building, plumbing & electrical code upgrades. no window or door alterations. kitchen: at least 50% of lighting wattage must be fluorescent. bath: fluorescent of motion controlled sensor. | $15,000 |
| Mar 30, 2007 | Completed | 825 Post St | On-Site Maintenance | #220- kitchen/bath remodel in kind. no structural changes.building, plumbing & electrical code upgrades. no window or door alterations. kitchen: at least 50% of lighting wattage must be fluorescent. bath: fluorescent or motion controlled sensor. | $15,000 |
| Feb 26, 2007 | Completed | 825 Post St | On-Site Maintenance | unit #415- kitchen/bath remodel in kind. no structural changes. building, plumbing & electrical code upgrades. no window or door changes. 50% of wattage of kitchen lighting to be fluorescent. bathroom lighting to be fluorescent or on occupant sensor. | $15,000 |
| Feb 26, 2007 | Expired or cancelled | 825 Post St | On-Site Maintenance | unit #306- kitchen/bath remodel in kind. no structural chagnes. building, plumbing & electrical code upgrades. no window or door changes. 50% of wattage of kitchen lighting to be fluorescent. bathroom lighting to be fluorescent or on occupant sensor. | $15,000 |
| Feb 26, 2007 | Expired or cancelled | 825 Post St | On-Site Maintenance | unit #509- kitchen/bath remodel. no structural changes. building, plumbing & electrical code upgrades. no w indow or door changes. 50% of wattage of kitchen lighting to be fluorescent. bathroom lighting to be fluorescent or on occupant sensor. | $15,000 |
| Feb 26, 2007 | Expired or cancelled | 825 Post St | On-Site Maintenance | unit #315- kitchen/bath remodel in kind. no structural changes. building, plumbing & electrical code upgrades. no window or door changes. 50% of wattage of kitchen lighting to be fluorescent. bathroom lighting to be fluroescent or on occupant sensor. | $15,000 |
| Feb 26, 2007 | Expired or cancelled | 825 Post St | On-Site Maintenance | unit #314- kitchen/bath remodel in kind. no structural changes. building, plumbing & electrical code upgrades. no window or door change. 50% of wattage of kitchen lighting to be fluorescent. bathroom lighting to be fluorescent or on occupant sensor. | $15,000 |
| Feb 23, 2007 | Never finaled | 825 Post St | street space | ||
| Feb 23, 2007 | Expired or cancelled | 825 Post St | On-Site Maintenance | work @ unit# 104. kitchen / bath remodel in kind. no structural changes. building, plumbing & electrical code upgraded. no window or door work. 50% of wattage of kitchen lighting to be fluorescant. bathroom lighting to be fluorescant or on occupant sensor. | $15,000 |
| Feb 23, 2007 | Never finaled | 825 Post St | On-Site Maintenance | work @ unit@ 201. kitchen / bath remodel in kind. no structural changes. building, plumbing & electrical code upgraded. no window or door work. 50% of wattage of kitchen lighting to be fluorescant. bathroom lighting to be fluorescant or on occupant sensor. | $15,000 |
| Feb 23, 2007 | Completed | 825 Post St | On-Site Maintenance | work @ unit# 304. kitchen / bath remodel in kind. no structural changes. building, plumbing & electrical code upgraded. no window or door work. 50% of wattage of kitchen lighting to be fluorescant. bathroom lighting to be fluorescant or on occupant sensor. | $15,000 |
| Feb 23, 2007 | Completed | 825 Post St | On-Site Maintenance | work @ unit# 305. kitchen / bath remodel in kind. no structural changes. building, plumbing & electrical code upgraded. no window or door work. 50% of wattage of kitchen lighting to be fluorescant. bathroom lighting to be fluorescant or on occupant sensor. | $15,000 |
| Feb 23, 2007 | Never finaled | 825 Post St | On-Site Maintenance | work @ unit# 115. kitchen / bath remodel in kind. no structural changes. building, plumbing & electrical code upgraded. no window or door work. 50% of wattage of kitchen lighting to be fluorescant. bathroom lighting to be fluorescant or on occupant sensor. | $15,000 |