Block 0463A, lot 033
25 Capra Way
- City’s use
- Multi-Family Residential
- Built
- 1927
- Stories
- 3
- Units
- 17
- Rooms
- 6 bedrooms, 17 bathrooms
- Building
- 13,425 sq ft
- Lot
- 6,175 sq ft
- Zoning
- RM3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
20 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 9, 2025 | Completed final sign-off Nov 2025 | 25 Capra Wy | Redlog Flooring Services Corp | unit #105 plaster repairs in living room, 2 bedrooms and partial repairs in kitchen. interior.Details
unit #105 plaster repairs in living room, 2 bedrooms and partial repairs in kitchen. interior. | $15,000 |
| Oct 5, 2023 | Completed final sign-off Jan 2025 | 25 Capra Wy | Scale-Corp | dryrot repair at south wall elevationDetails
dryrot repair at south wall elevation | $15,000 |
| Sep 26, 2023 | Completed final sign-off Dec 2023 | 25 Capra Wy | Generation Builders Inc | south siding replacementDetails
south siding replacement | $68,000 |
| Jun 8, 2023 | Completed final sign-off Jun 2023 | 25 Capra Wy | Architectural Fenestration & Restoration | this permit to furnish and install (28) double hung wood windows in kind to (e) front openings w/ wood sashes customer pella reserve w/ intergral ogee lugs - removing vinyl windows per nov below street facing. u=0.3max note: enforcement case 2020-010657enfDetails
this permit to furnish and install (28) double hung wood windows in kind to (e) front openings w/ wood sashes customer pella reserve w/ intergral ogee lugs - removing vinyl windows per nov below street facing. u=0.3max note: enforcement case 2020-010657enf | $42,500 |
| May 4, 2023 | Expired or cancelled cancelled Jan 2026 | 25 Capra Wy | demo entry & exit doors (3 levels) instllnew doors/hardware same locationDetails
demo entry & exit doors (3 levels) instllnew doors/hardware same location | $45,000 | |
| Nov 1, 2022 | Completed final sign-off Feb 2023 | 25 Capra Wy | B-Side Inc. | unit 206: install 1 new clothes washer and dryer. no structural wall demoDetails
unit 206: install 1 new clothes washer and dryer. no structural wall demo | $3,500 |
| Feb 25, 2021 | Completed final sign-off Dec 2021 | 25 Capra Wy | Au Electric Corporation/Aec Alarms | upgrade the existing fire alarm system to comply with sffc 1103.7.6.1 & nfpa 72. install low frequency sounders in sleeping areas, replace smoke, pull station & horn/strobe (like for like) in common areas.Details
upgrade the existing fire alarm system to comply with sffc 1103.7.6.1 & nfpa 72. install low frequency sounders in sleeping areas, replace smoke, pull station & horn/strobe (like for like) in common areas. | $35,000 |
| Dec 17, 2020 | Completed final sign-off Jun 2021 | 25 Capra Wy | Axel8 Construction | #301: convert existing kitchen to bedroom. relocate kitchen. rehabilitate existing bathroom. install washer & dryer.Details
#301: convert existing kitchen to bedroom. relocate kitchen. rehabilitate existing bathroom. install washer & dryer. | $40,000 |
| Dec 16, 2020 | Completed final sign-off Aug 2021 | 25 Capra Wy | Axel8 Construction | apt #303: convert existing kitchen to bedroom. relocate kitchen. rehabilitate existing bathroom. install washer & dryer.Details
apt #303: convert existing kitchen to bedroom. relocate kitchen. rehabilitate existing bathroom. install washer & dryer. | $40,000 |
| Dec 11, 2020 | Completed final sign-off Nov 2021 | 25 Capra Wy | Axel8 Construction | unit 304. convert (e) kitchen to bedroom. relocate kitchen. rehab (e) bathroom. install half bathroom. install washer and dryerDetails
unit 304. convert (e) kitchen to bedroom. relocate kitchen. rehab (e) bathroom. install half bathroom. install washer and dryer | $42,000 |
| Nov 30, 2020 | Completed final sign-off Nov 2021 | 25 Capra Wy | Axel8 Construction | unit 104 - convert existing kitchen to study rm, relocate kitchen, rehabilitate existing bathroom, add half bath, install washer/dryerDetails
unit 104 - convert existing kitchen to study rm, relocate kitchen, rehabilitate existing bathroom, add half bath, install washer/dryer | $40,000 |
| Nov 30, 2020 | Never finaled issued Jan 2021, no final | 25 Capra Wy | Axel8 Construction | unit #306: convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. install washer/dryer.Details
unit #306: convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. install washer/dryer. | $40,000 |
| Nov 5, 2020 | Completed final sign-off Jul 2021 | 25 Capra Wy | Axel8 Construction, Axa Construction | apt 305: convert (e) kitchen to bedroom, relocate kitchen, rehab (e) bathroom, install 1/2 bathroom, & install washer/dryer. maher n/a.Details
apt 305: convert (e) kitchen to bedroom, relocate kitchen, rehab (e) bathroom, install 1/2 bathroom, & install washer/dryer. maher n/a. | $40,000 |
| Nov 5, 2020 | Never finaled issued Dec 2020, no final | 25 Capra Wy | Axel8 Construction, Axa Construction | apt 302: convert (e) kitchen to bedroom, relocate kitchen, rehab (e) bathroom, install washer/dryer. maher n/a.Details
apt 302: convert (e) kitchen to bedroom, relocate kitchen, rehab (e) bathroom, install washer/dryer. maher n/a. | $40,000 |
| Nov 5, 2020 | Completed final sign-off Jun 2021 | 25 Capra Wy | Axel8 Construction, Axa Construction | apt 201: convert (e) kitchen to bedroom, relocate kitchen, rehab (e) bathroom, install washer/dryer. maher n/a.Details
apt 201: convert (e) kitchen to bedroom, relocate kitchen, rehab (e) bathroom, install washer/dryer. maher n/a. | $40,000 |
| Nov 5, 2020 | Completed final sign-off Aug 2021 | 25 Capra Wy | Axel8 Construction | apt 204: convert (e) kitchen to study. relocate kitchen, rehab (e) bathroom, install 1/f bathroom, install washer/dryer. maher n/a.Details
apt 204: convert (e) kitchen to study. relocate kitchen, rehab (e) bathroom, install 1/f bathroom, install washer/dryer. maher n/a. | $40,000 |
| Nov 5, 2020 | Completed final sign-off Jul 2021 | 25 Capra Wy | Axel8 Construction | apt 205: convert (e) kitchen to study. relocate kitchen, rehab (e) bathroom, install 1/f bathroom, install washer/dryer. maher n/a.Details
apt 205: convert (e) kitchen to study. relocate kitchen, rehab (e) bathroom, install 1/f bathroom, install washer/dryer. maher n/a. | $40,000 |
| Sep 1, 2016 | Completed final sign-off Feb 2017 | 25 Capra Wy | Theodore Design & Constr | soft story retrofit per sfbc chapter 34b 2012 iebc appendix a-4 and other rational design.Details
soft story retrofit per sfbc chapter 34b 2012 iebc appendix a-4 and other rational design. | $45,000 |
| Jul 29, 2016 | Completed final sign-off Feb 2017 | 25 Capra Wy | Theodore Design & Constr | exploratory for pre- work first floor only in garage area.Details
exploratory for pre- work first floor only in garage area. | $1,000 |
| Mar 8, 2002 | Completed final sign-off Apr 2002 | 25 Capra Wy | Tom Lee Roofing Inc. | reroofingDetails
reroofing | $19,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.