Permit GraphShortlistSan Francisco building permits since 2000

Nathan C. Simpson

License
C37662
Architect
About the California Architects Board
Look the license up with the state (Architects Board)
Listed as
architect
Firm
Nathan Simpson Architect
On San Francisco permits
Jul 2019 to Dec 2024

56 permits since 2000 (architect on 56 permits): 37 completed, 6 in progress, 9 never finaled, 4 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Aguilera Construction Company (10), Brighter Bay Builders Inc (9), Axel8 Construction (7), Ps2 Inc (5), Hon's Construction Inc. (4), Casman Construction Inc (2), Halyard Inc (2), Axa Construction, B-Side Inc., Hrvc Construction Inc
Engineers
Aaron Mcdevitt, William E. Tremayne
Authorized agents
Hugh Vanho

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Dec 20, 2024In progress
issued Dec 2025
395 17th AvHrvc Construction Incupgrade (e) commercial entry per ordinance 51-16 abe program to comply w/accessible entrance program. 395 17th st abe # 201902135146.install new door and repair bricks per nov #202533173.
Details
Permit
202412207249
Permit issued
Dec 5, 2025

upgrade (e) commercial entry per ordinance 51-16 abe program to comply w/accessible entrance program. 395 17th st abe # 201902135146.install new door and repair bricks per nov #202533173.

Open the permit page

$15,000
Oct 15, 2024In progress
issued Feb 2025
3004 16th Stupgrade (e) commericial entries per ordiance 51-16 abe program to comply with accesible entrance program. abe #202410160267 1. reconfigure security gate 2. replace threshhold 3. relocate power door operation.
Details
Permit
202410153001
Permit issued
Feb 20, 2025

upgrade (e) commericial entries per ordiance 51-16 abe program to comply with accesible entrance program. abe #202410160267 1. reconfigure security gate 2. replace threshhold 3. relocate power door operation.

Open the permit page

$1,800
Jul 31, 2024In progress
filed Jul 2024, not yet issued
4900 03rd Stupgrade (e) commercial entries per ordiance 51-16 abe program to comply with accessible entrance program: abe #201812183123. install power door operator.
Details
Permit
202407317675

upgrade (e) commercial entries per ordiance 51-16 abe program to comply with accessible entrance program: abe #201812183123. install power door operator.

Open the permit page

$1,200
Mar 1, 2024Completed
final sign-off Jul 2025
5300 Geary BlBrighter Bay Builders Increvision to pa# 202309257353, installation of sign over the door to read "door to remain unlocked during regular business hours", power operator to be install on left side outside.
Details
Permit
202403016946
Permit issued
Jun 25, 2025
Final sign-off
Jul 3, 2025

revision to pa# 202309257353, installation of sign over the door to read "door to remain unlocked during regular business hours", power operator to be install on left side outside.

Open the permit page

Oct 10, 2023Completed
final sign-off Apr 2024
2356 Polk StAxel8 Constructionrevision to 202307212689 and 202308305592 to include in scope: build new drop ceiling throughout retail space.add new lighting to the ceiling. adding electrical outlets
Details
Permit
202310108285
Permit issued
Feb 8, 2024
Final sign-off
Apr 17, 2024

revision to 202307212689 and 202308305592 to include in scope: build new drop ceiling throughout retail space.add new lighting to the ceiling. adding electrical outlets

Open the permit page

Oct 3, 2023Completed
final sign-off Jul 2024
1898 Union Stto comply with abe ord 51-16 202210245105 install power door operator and install new door
Details
Permit
202310037922
Permit issued
Nov 9, 2023
Final sign-off
Jul 11, 2024

to comply with abe ord 51-16 202210245105 install power door operator and install new door

Open the permit page

$4,000
Oct 3, 2023In progress
issued Feb 2024
2886 16th Stupgrade (e) commercial entrance per ordinance 51-16 abe program. abe # 201903185545. replace entrance slope, install power door operator
Details
Permit
202310037959
Permit issued
Feb 15, 2024

upgrade (e) commercial entrance per ordinance 51-16 abe program. abe # 201903185545. replace entrance slope, install power door operator

Open the permit page

$2,500
Sep 25, 2023Completed
final sign-off Jun 2024
5050 Geary Blupgrade existing commerical entries per ordiance 51-16 abe program to comply with accessible business entrance program ord 51-16. ref abe 201902135149. install power door operator botton at interior and exterior. install signage for power operator.
Details
Permit
202309257359
Permit issued
Feb 28, 2024
Final sign-off
Jun 14, 2024

upgrade existing commerical entries per ordiance 51-16 abe program to comply with accessible business entrance program ord 51-16. ref abe 201902135149. install power door operator botton at interior and exterior. install signage for power operator.

Open the permit page

$1,800
Sep 25, 2023Completed
final sign-off Jul 2025
5300 Geary Blupgrade (e) commerical entries per ordiance 51-16 abe program to comply with accessible business entrance program ord 51-16. ref abe 201905105759. install power door operator.
Details
Permit
202309257353
Permit issued
Nov 15, 2023
Final sign-off
Jul 3, 2025

upgrade (e) commerical entries per ordiance 51-16 abe program to comply with accessible business entrance program ord 51-16. ref abe 201905105759. install power door operator.

Open the permit page

$600
Aug 30, 2023Completed
final sign-off Apr 2024
2356 Polk StAxel8 Constructionrevision to pa# 202307212689. to include scope: demo (e) hardlid ceiling throughout retail space and replace bathroom exhaust fan.
Details
Permit
202308305592
Permit issued
Sep 1, 2023
Final sign-off
Apr 17, 2024

revision to pa# 202307212689. to include scope: demo (e) hardlid ceiling throughout retail space and replace bathroom exhaust fan.

Open the permit page

$1,500
Aug 10, 2023In progress
issued Mar 2024
833 22nd StAguilera Construction Companyupgrade (e) commercial entry per ordinance 51-16 be program to comply w/accessible entrance program abe 202002111973 new power door opener
Details
Permit
202308104181
Permit issued
Mar 15, 2024

upgrade (e) commercial entry per ordinance 51-16 be program to comply w/accessible entrance program abe 202002111973 new power door opener

Open the permit page

$5,000
Aug 9, 2023In progress
issued Mar 2024
1001 Minnesota StAguilera Construction Companyupgrade existing commercial entries per ordinance 51-16 abe program to comply w/accessible entrance program. modify threshold, remove hold-open. abe202002051721.
Details
Permit
202308094088
Permit issued
Mar 15, 2024

upgrade existing commercial entries per ordinance 51-16 abe program to comply w/accessible entrance program. modify threshold, remove hold-open. abe202002051721.

Open the permit page

$500
Jul 21, 2023Completed
final sign-off Apr 2024
2356 Polk StAxel8 Constructionpatch walls, remove tiled floors and countertop replace (e) plumbing and electrical fixtures in-kind. no ceiling work.
Details
Permit
202307212689
Permit issued
Jul 27, 2023
Final sign-off
Apr 17, 2024

patch walls, remove tiled floors and countertop replace (e) plumbing and electrical fixtures in-kind. no ceiling work.

Open the permit page

$15,000
Jun 29, 2023Never finaled
issued Nov 2023, no final
1892 Union Stupgrade (e) commercial entries per ordiance 51-16 abe programe to comply w/accessible entrance program. 1892 union: abe 201808232030 replace door, add constrast stripes to stairs, lower intercom.
Details
Permit
202306291209
Permit issued
Nov 9, 2023

upgrade (e) commercial entries per ordiance 51-16 abe programe to comply w/accessible entrance program. 1892 union: abe 201808232030 replace door, add constrast stripes to stairs, lower intercom.

Open the permit page

$1,300
May 4, 2023Expired or cancelled
cancelled Jan 2026
25 Capra Wydemo entry & exit doors (3 levels) instllnew doors/hardware same location
Details
Permit
202305047156

demo entry & exit doors (3 levels) instllnew doors/hardware same location

Open the permit page

$45,000
Mar 31, 2023Expired or cancelled
withdrawn Jan 2025
1655 Market Streplace storefront walls, windows, entrance. no structural modification. storefront preservation design standars have been reviewed/incorporate where applicable
Details
Permit
202303314868

replace storefront walls, windows, entrance. no structural modification. storefront preservation design standars have been reviewed/incorporate where applicable

Open the permit page

$20,000
Mar 31, 2023Completed
final sign-off Jul 2025
1649 Market StAxel8 Constructionreplace storefront walls, windows, entrance. no structural modification. storefront preservation design standards have been reviewed/incorporated where applicable
Details
Permit
202303314869
Permit issued
Jan 17, 2025
Final sign-off
Jul 17, 2025

replace storefront walls, windows, entrance. no structural modification. storefront preservation design standards have been reviewed/incorporated where applicable

Open the permit page

$20,000
Feb 10, 2023Completed
final sign-off Dec 2024
1649 Market StAxel8 Constructionground flr - barrier removal project, demo (e) restroom/build new accessible single occupancy restroom on ground floor of (e) vacant commercial space.
Details
Permit
202302101797
Permit issued
Jul 17, 2023
Final sign-off
Dec 19, 2024

ground flr - barrier removal project, demo (e) restroom/build new accessible single occupancy restroom on ground floor of (e) vacant commercial space.

Open the permit page

$20,000
Jan 10, 2023Completed
final sign-off Apr 2023
630 Alvarado Stpermit to legalize original unit count (27). unit 305 & 306 demised to origianl unit confifuration and count (27). these units were combined without permit & have since been restored to their original configuration per approved use under pa#311252/15.
Details
Permit
202301109975
Permit issued
Feb 28, 2023
Final sign-off
Apr 19, 2023

permit to legalize original unit count (27). unit 305 & 306 demised to origianl unit confifuration and count (27). these units were combined without permit & have since been restored to their original configuration per approved use under pa#311252/15.

Open the permit page

Aug 26, 2022Never finaled
issued Sep 2022, no final
355 Fulton Stremove (8) (e) non fire rated interior doors in the building common areas and replace w/new fire rated doors.
Details
Permit
202208261371
Permit issued
Sep 14, 2022

remove (8) (e) non fire rated interior doors in the building common areas and replace w/new fire rated doors.

Open the permit page

$8,000
Mar 15, 2022Completed
final sign-off Sep 2022
65 Taylor StPs2 Incdemo of (e) restroom and building (n) single occupancy restroom on ground floor of (e) vacant commercial space.
Details
Permit
202203150069
Permit issued
May 19, 2022
Final sign-off
Sep 13, 2022

demo of (e) restroom and building (n) single occupancy restroom on ground floor of (e) vacant commercial space.

Open the permit page

$20,000
Feb 23, 2022Completed
final sign-off Nov 2025
2600 Van Ness AvHalyard Inc, Aguilera Construction Companylegalize a dwelling unit on the first floor of an existing 32 unit, 6 story residential building, per section 207.3 (ord. 43-14). all work located within existing building envelope at first floor. egress for existing units to be maintained.
Details
Permit
202202238510
Permit issued
Sep 27, 2023
Final sign-off
Nov 3, 2025

legalize a dwelling unit on the first floor of an existing 32 unit, 6 story residential building, per section 207.3 (ord. 43-14). all work located within existing building envelope at first floor. egress for existing units to be maintained.

Open the permit page

$90,000
Nov 19, 2021Completed
final sign-off Sep 2023
2619 Mission StCasman Construction Incdemo (e) restroom & build (n) accessible single occupancy restroom within (e)retail space.
Details
Permit
202111192778
Permit issued
Feb 28, 2022
Final sign-off
Sep 15, 2023

demo (e) restroom & build (n) accessible single occupancy restroom within (e)retail space.

Open the permit page

$20,000
Nov 9, 2021Completed
final sign-off Apr 2022
3416 22nd StAguilera Construction Companytenant improvement: installation of new plumbing and electrical fixtures for hair salon and new washer and dryer.
Details
Permit
202111092127
Permit issued
Dec 21, 2021
Final sign-off
Apr 19, 2022

tenant improvement: installation of new plumbing and electrical fixtures for hair salon and new washer and dryer.

Open the permit page

$20,000
Sep 22, 2021Completed
final sign-off Dec 2022
1369 Hyde StHon's Construction Inc.construction (n) exit acess stairwell between levels 6:7 remodel units 72 and 65 to accomodate (n) stair unit 65 to receive remodeled ktichen and (n) washer/dryer.
Details
Permit
202109228925
Permit issued
Oct 13, 2021
Final sign-off
Dec 16, 2022

construction (n) exit acess stairwell between levels 6:7 remodel units 72 and 65 to accomodate (n) stair unit 65 to receive remodeled ktichen and (n) washer/dryer.

Open the permit page

$50,000
Aug 19, 2021Completed
final sign-off Mar 2022
605 Jones StCasman Construction Incbuild out (n) ada restroom. add (n) power assisted door operator and reconfigure rise/run of (e) ground level stairs. mep deferred.
Details
Permit
202108196737
Permit issued
Sep 14, 2021
Final sign-off
Mar 14, 2022

build out (n) ada restroom. add (n) power assisted door operator and reconfigure rise/run of (e) ground level stairs. mep deferred.

Open the permit page

$20,000
Jun 15, 2021Completed
final sign-off Jan 2022
1369 Hyde StBrighter Bay Builders Incapt 66: relocate (e) kitchen, build (n) full bathroom.install washer/dryer and convert (e) dining to bedroom. maher n/a.
Details
Permit
202106152487
Permit issued
Jul 14, 2021
Final sign-off
Jan 28, 2022

apt 66: relocate (e) kitchen, build (n) full bathroom.install washer/dryer and convert (e) dining to bedroom. maher n/a.

Open the permit page

$15,000
Jun 15, 2021Completed
final sign-off Jan 2022
1369 Hyde StBrighter Bay Builders Incapt 25: relocate (e) kitchen, build (n) full bathroom.install washer/dryer and convert (e) dining to bedroom. maher n/a.
Details
Permit
202106152494
Permit issued
Jul 14, 2021
Final sign-off
Jan 21, 2022

apt 25: relocate (e) kitchen, build (n) full bathroom.install washer/dryer and convert (e) dining to bedroom. maher n/a.

Open the permit page

$15,000
Jun 15, 2021Completed
final sign-off Feb 2022
1369 Hyde StBrighter Bay Builders Incapt 16: relocate (e) kitchen, build (n) full bathroom.install washer/dryer and convert (e) dining to bedroom. maher n/a.
Details
Permit
202106152492
Permit issued
Jul 14, 2021
Final sign-off
Feb 8, 2022

apt 16: relocate (e) kitchen, build (n) full bathroom.install washer/dryer and convert (e) dining to bedroom. maher n/a.

Open the permit page

$15,000
Jun 14, 2021Completed
final sign-off Feb 2022
1369 Hyde StBrighter Bay Builders Increnovate (e) unit 6; relocate kitchen and bath, install washer/dryer, and expand unit into corridor, relocate unit entrance.
Details
Permit
202106142379
Permit issued
Jul 14, 2021
Final sign-off
Feb 8, 2022

renovate (e) unit 6; relocate kitchen and bath, install washer/dryer, and expand unit into corridor, relocate unit entrance.

Open the permit page

$15,000
Jun 7, 2021Never finaled
issued Jul 2021, no final
1369 Hyde StBrighter Bay Builders Incunit #15 - 1st flr: renovate (1) existing dwelling unit within an existing bldg at first fl. renovation scope includes remodeling (e) kitchen & bath, installing washer/dryer and converting (e) living to bedroom. must comply w/sffc 1103.7.6.1. fire alarm under sep permit.
Details
Permit
202106071801
Permit issued
Jul 7, 2021

unit #15 - 1st flr: renovate (1) existing dwelling unit within an existing bldg at first fl. renovation scope includes remodeling (e) kitchen & bath, installing washer/dryer and converting (e) living to bedroom. must comply w/sffc 1103.7.6.1. fire alarm under sep permit.

Open the permit page

$60,000
Jun 1, 2021Never finaled
issued Jun 2021, no final
645 Stockton StPs2 Incapt 701: rev to pa202011128096: remodel kitchen by add non-load bearing wall. new fixture layout in (e) bathroom. maher n/a
Details
Permit
202106011390
Permit issued
Jun 1, 2021

apt 701: rev to pa202011128096: remodel kitchen by add non-load bearing wall. new fixture layout in (e) bathroom. maher n/a

Open the permit page

May 28, 2021Never finaled
issued Jun 2021, no final
994 Guerrero StAguilera Construction Companydemolition of e restroom and construction of new ada compliant single occupancy restroom. install hookup up for washer and gas dryer. gas dryer install under sep permit.
Details
Permit
202105281302
Permit issued
Jun 9, 2021

demolition of e restroom and construction of new ada compliant single occupancy restroom. install hookup up for washer and gas dryer. gas dryer install under sep permit.

Open the permit page

$12,000
Apr 8, 2021Completed
final sign-off Nov 2021
1369 Hyde StBrighter Bay Builders Incunit 17 - install new ventless washer and dryer at existing closet
Details
Permit
202104088207
Permit issued
May 17, 2021
Final sign-off
Nov 8, 2021

unit 17 - install new ventless washer and dryer at existing closet

Open the permit page

$6,000
Apr 8, 2021Never finaled
issued May 2021, no final
1369 Hyde StBrighter Bay Builders Incunit 60 - rehabilitate existing kitchen (1) and bathroom (1) install new ventless stackable washer and dryer at existing closet
Details
Permit
202104088204
Permit issued
May 17, 2021

unit 60 - rehabilitate existing kitchen (1) and bathroom (1) install new ventless stackable washer and dryer at existing closet

Open the permit page

$35,000
Mar 31, 2021Expired or cancelled
cancelled Jan 2026
50 Fell Stinstall a new child's restroom in an existing classroom on 1st floor. install a new child's counter and sink in same classroom.
Details
Permit
202103317597

install a new child's restroom in an existing classroom on 1st floor. install a new child's counter and sink in same classroom.

Open the permit page

$5,000
Mar 31, 2021Completed
final sign-off Feb 2022
1450 Golden Gate AvBrighter Bay Builders Incunits 101, 103, 203 (1st/2nd flrs): renovate 3 (e) dwelling units. 2 of 3 units have same floor plan. convert (e) kitchen to bedroom, relocate kitchen. install washer/dryer.
Details
Permit
202103317603
Permit issued
Oct 25, 2021
Final sign-off
Feb 25, 2022

units 101, 103, 203 (1st/2nd flrs): renovate 3 (e) dwelling units. 2 of 3 units have same floor plan. convert (e) kitchen to bedroom, relocate kitchen. install washer/dryer.

Open the permit page

$120,000
Mar 3, 2021Completed
final sign-off May 2021
510 Stockton StPs2 Incapt 9: revision to pa202009023342 - removal of non-load bearing partition between kitchen & living room (open kitchen).
Details
Permit
202103035753
Permit issued
May 10, 2021
Final sign-off
May 13, 2021

apt 9: revision to pa202009023342 - removal of non-load bearing partition between kitchen & living room (open kitchen).

Open the permit page

Mar 3, 2021Completed
final sign-off May 2021
510 Stockton StPs2 Incapt 7: revision to pa202010166644 - removal of non-load bearing partition between kitchen & living room (open kitchen).
Details
Permit
202103035752
Permit issued
May 10, 2021
Final sign-off
May 13, 2021

apt 7: revision to pa202010166644 - removal of non-load bearing partition between kitchen & living room (open kitchen).

Open the permit page

Mar 3, 2021Completed
final sign-off May 2021
510 Stockton StPs2 Incapt 11: revision to pa202010166644 - removal of non-load bearing partition between kitchen & living room (open kitchen).
Details
Permit
202103035754
Permit issued
May 10, 2021
Final sign-off
May 13, 2021

apt 11: revision to pa202010166644 - removal of non-load bearing partition between kitchen & living room (open kitchen).

Open the permit page

Nov 10, 2020Completed
final sign-off Jul 2021
1450 Golden Gate Avrenovate 3 (e) dwelling units. 2 of 3 units have same floor plan. convert (e) kitchen to bedroom, relocate kitchen. install washer/dryer.
Details
Permit
202011108571
Permit issued
Dec 29, 2020
Final sign-off
Jul 9, 2021

renovate 3 (e) dwelling units. 2 of 3 units have same floor plan. convert (e) kitchen to bedroom, relocate kitchen. install washer/dryer.

Open the permit page

$100,000
Nov 9, 2020Completed
final sign-off Sep 2021
1240 Hayes Strenovate 3 (e) dwelling units. all 3 units have same floor plan. convert (e) kitchen to bedroom. relocate kitchen, remodel (e) bathroom. install (n) washer/dryer
Details
Permit
202011098558
Permit issued
Jan 12, 2021
Final sign-off
Sep 30, 2021

renovate 3 (e) dwelling units. all 3 units have same floor plan. convert (e) kitchen to bedroom. relocate kitchen, remodel (e) bathroom. install (n) washer/dryer

Open the permit page

$100,000
Feb 12, 2020Completed
final sign-off Oct 2021
1950 Franklin StAxel8 Constructionunit 4: convert existing 2 bedroom unit to (1) 1 bedroom unit and (1) studio unit for a net increase of (1) dwelling unit. (new unit to be 4a)
Details
Permit
202002124248
Permit issued
Jan 21, 2021
Final sign-off
Oct 1, 2021

unit 4: convert existing 2 bedroom unit to (1) 1 bedroom unit and (1) studio unit for a net increase of (1) dwelling unit. (new unit to be 4a)

Open the permit page

$30,000
Dec 31, 2019Completed
final sign-off Apr 2021
621 Grant AvAguilera Construction Companyg/f: renovate interior commercial space includig (1) bathroom & (1) kitchen, new lighting throughout, new hvac system, replace storefront doors & windows. demo of (e) conditions covered under bpa#201912311080.
Details
Permit
201912311080
Permit issued
Sep 14, 2020
Final sign-off
Apr 28, 2021

g/f: renovate interior commercial space includig (1) bathroom & (1) kitchen, new lighting throughout, new hvac system, replace storefront doors & windows. demo of (e) conditions covered under bpa#201912311080.

Open the permit page

$120,000
Dec 19, 2019Completed
final sign-off Mar 2020
451 Ofarrell StAguilera Construction Companyconstruction of new accessible single occupancy restroom in extg retail space.
Details
Permit
201912199993
Permit issued
Jan 22, 2020
Final sign-off
Mar 12, 2020

construction of new accessible single occupancy restroom in extg retail space.

Open the permit page

$10,000
Nov 27, 2019Completed
final sign-off Nov 2026
2275 BroadwayB-Side Inc.unit 700 renovate an existing 854 sq ft. storage area within an existing building at the 7th flr. create new doorway to connect to existing adjacent unit. install a full bathroom & washer/dryer.
Details
Permit
201911278307
Permit issued
Dec 19, 2019
Final sign-off
Nov 12, 2026

unit 700 renovate an existing 854 sq ft. storage area within an existing building at the 7th flr. create new doorway to connect to existing adjacent unit. install a full bathroom & washer/dryer.

Open the permit page

$15,000
Nov 27, 2019Completed
final sign-off Apr 2021
2459 Larkin StAxa Constructionunit #9: convert existing 2,660 sq ft. 3 bed, 3 bath dwelling to a 4 bed, 3.5 bath unti within the same footprint. renovate existing kitchen & bathrooms, relocate laundry utilities
Details
Permit
201911278306
Permit issued
Jan 28, 2020
Final sign-off
Apr 6, 2021

unit #9: convert existing 2,660 sq ft. 3 bed, 3 bath dwelling to a 4 bed, 3.5 bath unti within the same footprint. renovate existing kitchen & bathrooms, relocate laundry utilities

Open the permit page

$100,000
Nov 5, 2019Completed
final sign-off Jan 2020
925 Pierce StHon's Construction Inc.add washer/dryer to existing closet, no structuraal work needed, paint unit and refinish existing hardwood flooring
Details
Permit
201911056441
Permit issued
Nov 5, 2019
Final sign-off
Jan 10, 2020

add washer/dryer to existing closet, no structuraal work needed, paint unit and refinish existing hardwood flooring

Open the permit page

$10,000
Sep 10, 2019Completed
final sign-off Jun 2020
181 Bartlett StHon's Construction Inc.unit #3 and #7 - bathrooms and kitchens remodel in like kind. no change to walls and opening layout. maintain 1 hour separation between units.
Details
Permit
201909101185
Permit issued
Sep 10, 2019
Final sign-off
Jun 25, 2020

unit #3 and #7 - bathrooms and kitchens remodel in like kind. no change to walls and opening layout. maintain 1 hour separation between units.

Open the permit page

$55,000
Aug 30, 2019Completed
final sign-off Dec 2019
181 Bartlett StHon's Construction Inc.unit #9 - remodel (e) dwelling unit on 3rd flr of (e) bldg. convert kitchen to bedroom relocate kitchen, remodel bathroom, install (n) w/d
Details
Permit
201908300292
Permit issued
Sep 10, 2019
Final sign-off
Dec 11, 2019

unit #9 - remodel (e) dwelling unit on 3rd flr of (e) bldg. convert kitchen to bedroom relocate kitchen, remodel bathroom, install (n) w/d

Open the permit page

$20,000
Aug 5, 2019Completed
final sign-off Dec 2019
3414 22nd StAguilera Construction Companyconstruction of (n) ada compliant restroom in place of (e) restroom
Details
Permit
201908057878
Permit issued
Sep 5, 2019
Final sign-off
Dec 2, 2019

construction of (n) ada compliant restroom in place of (e) restroom

Open the permit page

$10,000
Jul 30, 2019Never finaled
issued Feb 2021, no final
691 Ofarrell StAguilera Construction Companyunit legalization ordinance 43-14, on ground floor, unit is 1 bath studio, no change to existing unit or path of egress.
Details
Permit
201907307336
Permit issued
Feb 13, 2021

unit legalization ordinance 43-14, on ground floor, unit is 1 bath studio, no change to existing unit or path of egress.

Open the permit page

$10,000
Jul 30, 2019Expired or cancelled
cancelled Jan 2026
3414 22nd Stconstruction of a (n) ada compliant restroom in (e) restroom.
Details
Permit
201907307348

construction of a (n) ada compliant restroom in (e) restroom.

Open the permit page

$2,000
Jul 24, 2019Never finaled
filed Jul 2019, never issued
1020 Post Stto comply w/ n.o.v 201967881. build translucent cover for (e) lightwell to protect from elements. maintain (e) amounts of natural light and ventilation.
Details
Permit
201907246838

to comply w/ n.o.v 201967881. build translucent cover for (e) lightwell to protect from elements. maintain (e) amounts of natural light and ventilation.

Open the permit page

$200
Jul 17, 2019Never finaled
issued Feb 2021, no final
845 California StHalyard Inc, Aguilera Construction Companylegalize an (e) illegal unit per ordinance #43-14. partial demolition of unit interior & remodel. no change to (e) units of path of egress.
Details
Permit
201907176147
Permit issued
Feb 13, 2021

legalize an (e) illegal unit per ordinance #43-14. partial demolition of unit interior & remodel. no change to (e) units of path of egress.

Open the permit page

$10,000
Jul 5, 2019Completed
final sign-off Oct 2021
1950 Franklin StAxel8 Constructionno new conditioned space added, work includes wall, plumbing, & elec relocations, no changes to exterior. 8/23- convert 4 existing 2 bedrrom unit to 4 1 bedroom units and 4 studio units for a net increase of 4 dwelling units n the property.
Details
Permit
201907055182
Permit issued
Jul 22, 2020
Final sign-off
Oct 5, 2021

no new conditioned space added, work includes wall, plumbing, & elec relocations, no changes to exterior. 8/23- convert 4 existing 2 bedrrom unit to 4 1 bedroom units and 4 studio units for a net increase of 4 dwelling units n the property.

Open the permit page

$20,000