Hrvc Construction Inc
- Based in
- South San Francisco,
- On San Francisco permits
- Oct 2023 to Sep 2026
- Last 24 months
- 29 permits filed
45 permits since 2000: 29 completed, 15 in progress, 1 expired or cancelled.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 30, 2026 | In progress | 1849 Church St | kitchen, bathroom and laundry-elec room remodel. (apartments 1 & 3) all work in-kind, no layout changes and replace all plumbing fixtures. no removal of walls. | $120,240 |
| Aug 27, 2026 | In progress | 2 Fallon Pl | replace chain link fence in-kind. no layout changes. no structural changes. fence is on top of flat garage roof top and is 10'tall. | $30,000 |
| Aug 21, 2026 | In progress | 172 Jerrold Av | bathroom remodel: in kind, no layout change. replacement of all plumbing fixtures and electrical fixtures. (bathroom downstairs) | $28,000 |
| Aug 18, 2026 | In progress | 12 Fair Av | new foot and ankle clinic. new ada door opener at front door. new ada bathroom accessories. | $95,000 |
| Jul 24, 2026 | In progress | 1417 26th Av | one bathroom remodel. all work inkind. interior painting, flooring refinish, main electrical box replacement and subpanel inside, rewire the unit, new lighting, ev charger installation. new lighting for bathroom remodel shall comply with cec 150.0(k)5. no new wall and no existing wall relocation. | $90,000 |
| Jun 11, 2026 | In progress | 975 Cayuga Av | bathroom remodel like for like no layout changes convert tub to walkin shower. replace all plumbing fixture lights, exhaust fan replace (e) window in kind install new tile and paint. this bathroom is on the 2nd floor. | $27,520 |
| Jun 10, 2026 | In progress | 1397 12th Av | revision to 202604240091: adding scope, dryrot repair in front of bldg and repair leak in balcony, replace stucco front and left side of bldg. (correcting work location to the front of the building) | $18,000 |
| Apr 24, 2026 | In progress | 1397 12th Av | deck repairs and some deck boards repairs, repair deck joists, less than 50%, re stucco in kind and water proofing at ledger. all work in back non street facing. | $18,000 |
| Apr 16, 2026 | Completed | 370 Hermann St | bathroom remodel, tub to walk in shower. replace shower valves, tiolet, vanity, tiles, exhaust fan. | $16,000 |
| Mar 10, 2026 | Completed | 2191 33rd Av | kitchen and bathroom remodel, main service panel upgrade 100 amps to 200 amps, over head power, no layout changes. | $60,000 |
| Jan 28, 2026 | Completed | 469 Collingwood St | upper floor: convert existing closet to full bathroom with shower, double vanity and toilet. no wall changes. and upgrade of electrical to 200amp. | $30,000 |
| Jan 9, 2026 | In progress | 172 Jerrold Av | bathroom and kitchen remodel, no layout changes, new kitchen and bathroom fixtures, add one light in closet, one light in bathroom. tub to shower conversion. replace counter tops, sink, cabinets, drywall in kitchen and living room, water damage. | $77,485 |
| Dec 9, 2025 | Completed | 1839 15th St | unit 158: bathroom remodel, like for like. no layout changes, install vanity, shower valve, faucet, toilet, tile, mirror, lights outlets, paint, replace flooring, replace outlets in the condo. replace light fixture in the condo. total of 8 lights, new baseboards. | $35,720 |
| Nov 25, 2025 | Completed | 2250 24th St | unit 231: interior bathroom and kitchen remodel, interior paint, install electrical fixtures, plumbing, cabinets, countertops, shower valves, tub vanity faucets, toilet hood, range exhaust fan. all will be same layout and all like for like. no wall movement. | $57,035 |
| Nov 25, 2025 | Completed | 1067 Sanchez St | removal of installation of 5 front window with no aluminum clad. same height same width. | $5,890 |
| Nov 10, 2025 | Completed | 394 Fair Oaks St | bathroom remodel in unit #2. remove and replace all existing bathroom fixture like for like. no layout changes. new tub, new shower pan new toilet, new shower mixing valve, new vanity faucet, tile, exhaust fan, new electrical fixture and new paint. | $34,000 |
| Sep 26, 2025 | Expired or cancelled | 793 South Van Ness Av | mep deferred. mechanical and electrical drawings and title 24 for bpa 202506279723 | $1,000 |
| Sep 19, 2025 | Completed | 220 Lombard St | unit 517 on 5/f: bathroom remodel. new vanity, sink, toilet, light fixtures. replace tub with shower. new medicine cabinet. tile on walls and floor. | $20,000 |
| Sep 17, 2025 | Completed | 276 Bemis St | remodel of (e) kitchen including new cabinets, counters, sink, energy efficient appliances, light fixture. removal of non-load bearing walls. replacement of (e) window with new sliding window retrofit type. upgrade main electrical panel to 200amp. | $45,000 |
| Jul 1, 2025 | Completed | 394 Fair Oaks St | kitchen remodel installation of new cabinet, countertop, floor light fixture, paint sink, faucet, appliances, garbage disposal in kind | $60,000 |
| Jun 27, 2025 | In progress | 793 South Van Ness Av | interior remodel of beauty salon installation of floor, electrical barber station, pedicure station, nail station, install service sink and cashier station, lights outlet work to be performed at 793 s van ness suite c. mep defer. | $80,000 |
| May 30, 2025 | Completed | 631 Ofarrell St | removal of non bearing wall between kitchen and living room. removing to create a small top for a kitchen table. no plumbing, electrical. | $4,300 |
| May 16, 2025 | Completed | 65 Venus St | framing dry rot repair in about 15 x 20 front area of building with new stucco to the disturbed area and paint the front of the building. | $32,380 |
| Mar 4, 2025 | Completed | 531 Munich St | upper unit. interior remodel of bathroom (in kind), flooring, kitchen countertops, electrical fixtures (switches, outlets and fixtures). interior painting, exterior painting, siding-dry rot repair at back of building (approx. 660 ft). no moving walls. no layout changes. | $136,000 |
| Mar 4, 2025 | Completed | 44 Madrone Av | in kind framing repair in kitchen wall, relocation of vent line and furnace and water heater flu line, rewire all vent rooms, bathroom and hallway. not street visible. gas vent shall comply cmc 802.6 and sfmc 802.6.2 | $26,400 |
| Feb 26, 2025 | In progress | 435 Parker Av | replace existing wood rotted upper and lower balconies. no change to the design. structural requires beams to be connected to structural floor joist. floors to be removed and replaced for access to the joist. | $70,000 |
| Feb 18, 2025 | Completed | 44 Madrone Av | kitchen remodel, main panel 200 amp upgrade. installation of 100amp subpanel, floor installation in kitchen and dining room. painting in kitchen. | $72,670 |
| Dec 20, 2024 | In progress | 395 17th Av | upgrade (e) commercial entry per ordinance 51-16 abe program to comply w/accessible entrance program. 395 17th st abe # 201902135146.install new door and repair bricks per nov #202533173. | $15,000 |
| Oct 8, 2024 | In progress | 319 Divisadero St | dryrot repair in front of building in window trim and picture modling and paint. repair in kind. | $15,000 |
| Sep 18, 2024 | Completed | 60 Melrose Av | interior bathroom and kitchen remodel like for like. remove and replace plumbing fixtures, doors, baseboards, floor finishes and trim, paint walls and ceiling, remove and replace (e) skylights. no wall demolition or construction | $97,580 |
| Aug 22, 2024 | Completed | 2459 41st Av | rev 2024-0612-4264: change location of water heater, change orientaion of w&d hookups, remove (1) shower head and remove pony walls for (n) bathroom. | |
| Aug 12, 2024 | Completed | 1221 Sunnydale Av | dry rot repair located at roof. replace rafters and sheeting in kind. approx. 400 sq. ft.(not to exceed 50%). re-roofing shall not exceed 25%. | $13,000 |
| Aug 1, 2024 | Completed | 2507 30th Av | revision to #202407116296: legalize and convert (e) storage to (n) wet bar downstair with sink and cabinets. no layout change | $20,000 |
| Jul 24, 2024 | Completed | 2574 28th Av | bathroom renovation like for like no layout changes. | $14,395 |
| Jul 11, 2024 | Completed | 2507 30th Av | interior 3 bathroom remodel and kitchen countertop sink faucet like for like no layout changes. | $62,050 |
| Jun 12, 2024 | In progress | 2459 41st Av | adding a bathroom in the existing garage area. 91 sq.ft will be added within the envelope of the house. moving the door to the backyard. replacing furnace. | $80,000 |
| May 23, 2024 | Completed | 657 18th Av | kitchen remodel like for like. | $30,000 |
| May 23, 2024 | Completed | 655 18th Av | kitchen and bathroom remodel like for like. | $65,000 |
| May 21, 2024 | Completed | 655 18th Av | to comply w/ physical inspection report # cc-8674 | $7,225 |
| Jan 17, 2024 | In progress | 608 Santiago St | repair and replace tile near roof area in kind | $10,000 |
| Nov 30, 2023 | Completed | 1067 Sanchez St | replace existing front entry stair to ameliorate safety issues such as rotting stair structure, overly large opening in guardrail, etc | $20,000 |
| Nov 30, 2023 | Completed | 25 Beideman St | siding and framing dry rot repair in back and right side of bulding and paint areas were repair was performed approx 100sf | $7,000 |
| Oct 18, 2023 | Completed | 199 Parnassus Av | reroofing (repair work under pa# 202310188934) | $15,000 |
| Oct 18, 2023 | Completed | 165 Texas St | siding dryrot repair throghout the building and repair in roof area plus paint throughout the building. | $58,968 |
| Oct 18, 2023 | Completed | 199 Parnassus Av | reroofing throughout the building. | $20,000 |