Back to bathroom remodel contractors
Hrvc Construction Inc
- Based in
- South San Francisco,
- On San Francisco permits
- Oct 2023 to Sep 2026
- Last 24 months
- 29 permits filed
45 permits since 2000: 29 completed, 15 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
21 bathroom remodel permits: 14 completed, 7 in progress. Typically 0 days from filing to permit and 86 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 30, 2026 | In progress issued Sep 2026 | 1849 Church St | kitchen, bathroom and laundry-elec room remodel. (apartments 1 & 3) all work in-kind, no layout changes and replace all plumbing fixtures. no removal of walls.Details
kitchen, bathroom and laundry-elec room remodel. (apartments 1 & 3) all work in-kind, no layout changes and replace all plumbing fixtures. no removal of walls. | $120,240 |
| Aug 21, 2026 | In progress issued Aug 2026 | 172 Jerrold Av | bathroom remodel: in kind, no layout change. replacement of all plumbing fixtures and electrical fixtures. (bathroom downstairs)Details
bathroom remodel: in kind, no layout change. replacement of all plumbing fixtures and electrical fixtures. (bathroom downstairs) | $28,000 |
| Aug 18, 2026 | In progress issued Sep 2026 | 12 Fair Av | new foot and ankle clinic. new ada door opener at front door. new ada bathroom accessories.Details
new foot and ankle clinic. new ada door opener at front door. new ada bathroom accessories. | $95,000 |
| Jul 24, 2026 | In progress issued Jul 2026 | 1417 26th Av | one bathroom remodel. all work inkind. interior painting, flooring refinish, main electrical box replacement and subpanel inside, rewire the unit, new lighting, ev charger installation. new lighting for bathroom remodel shall comply with cec 150.0(k)5. no new wall and no existing wall relocation.Details
one bathroom remodel. all work inkind. interior painting, flooring refinish, main electrical box replacement and subpanel inside, rewire the unit, new lighting, ev charger installation. new lighting for bathroom remodel shall comply with cec 150.0(k)5. no new wall and no existing wall relocation. | $90,000 |
| Jun 11, 2026 | In progress issued Jun 2026 | 975 Cayuga Av | bathroom remodel like for like no layout changes convert tub to walkin shower. replace all plumbing fixture lights, exhaust fan replace (e) window in kind install new tile and paint. this bathroom is on the 2nd floor.Details
bathroom remodel like for like no layout changes convert tub to walkin shower. replace all plumbing fixture lights, exhaust fan replace (e) window in kind install new tile and paint. this bathroom is on the 2nd floor. | $27,520 |
| Apr 16, 2026 | Completed final sign-off Jun 2026 | 370 Hermann St | bathroom remodel, tub to walk in shower. replace shower valves, tiolet, vanity, tiles, exhaust fan.Details
bathroom remodel, tub to walk in shower. replace shower valves, tiolet, vanity, tiles, exhaust fan. | $16,000 |
| Mar 10, 2026 | Completed final sign-off May 2026 | 2191 33rd Av | kitchen and bathroom remodel, main service panel upgrade 100 amps to 200 amps, over head power, no layout changes.Details
kitchen and bathroom remodel, main service panel upgrade 100 amps to 200 amps, over head power, no layout changes. | $60,000 |
| Jan 28, 2026 | Completed final sign-off Apr 2026 | 469 Collingwood St | upper floor: convert existing closet to full bathroom with shower, double vanity and toilet. no wall changes. and upgrade of electrical to 200amp.Details
upper floor: convert existing closet to full bathroom with shower, double vanity and toilet. no wall changes. and upgrade of electrical to 200amp. | $30,000 |
| Jan 9, 2026 | In progress issued Jan 2026 | 172 Jerrold Av | bathroom and kitchen remodel, no layout changes, new kitchen and bathroom fixtures, add one light in closet, one light in bathroom. tub to shower conversion. replace counter tops, sink, cabinets, drywall in kitchen and living room, water damage.Details
bathroom and kitchen remodel, no layout changes, new kitchen and bathroom fixtures, add one light in closet, one light in bathroom. tub to shower conversion. replace counter tops, sink, cabinets, drywall in kitchen and living room, water damage. | $77,485 |
| Dec 9, 2025 | Completed final sign-off Feb 2026 | 1839 15th St | unit 158: bathroom remodel, like for like. no layout changes, install vanity, shower valve, faucet, toilet, tile, mirror, lights outlets, paint, replace flooring, replace outlets in the condo. replace light fixture in the condo. total of 8 lights, new baseboards.Details
unit 158: bathroom remodel, like for like. no layout changes, install vanity, shower valve, faucet, toilet, tile, mirror, lights outlets, paint, replace flooring, replace outlets in the condo. replace light fixture in the condo. total of 8 lights, new baseboards. | $35,720 |
| Nov 25, 2025 | Completed final sign-off Feb 2026 | 2250 24th St | unit 231: interior bathroom and kitchen remodel, interior paint, install electrical fixtures, plumbing, cabinets, countertops, shower valves, tub vanity faucets, toilet hood, range exhaust fan. all will be same layout and all like for like. no wall movement.Details
unit 231: interior bathroom and kitchen remodel, interior paint, install electrical fixtures, plumbing, cabinets, countertops, shower valves, tub vanity faucets, toilet hood, range exhaust fan. all will be same layout and all like for like. no wall movement. | $57,035 |
| Nov 10, 2025 | Completed final sign-off Mar 2026 | 394 Fair Oaks St | bathroom remodel in unit #2. remove and replace all existing bathroom fixture like for like. no layout changes. new tub, new shower pan new toilet, new shower mixing valve, new vanity faucet, tile, exhaust fan, new electrical fixture and new paint.Details
bathroom remodel in unit #2. remove and replace all existing bathroom fixture like for like. no layout changes. new tub, new shower pan new toilet, new shower mixing valve, new vanity faucet, tile, exhaust fan, new electrical fixture and new paint. | $34,000 |
| Sep 19, 2025 | Completed final sign-off Jan 2026 | 220 Lombard St | unit 517 on 5/f: bathroom remodel. new vanity, sink, toilet, light fixtures. replace tub with shower. new medicine cabinet. tile on walls and floor.Details
unit 517 on 5/f: bathroom remodel. new vanity, sink, toilet, light fixtures. replace tub with shower. new medicine cabinet. tile on walls and floor. | $20,000 |
| Mar 4, 2025 | Completed final sign-off May 2025 | 531 Munich St | upper unit. interior remodel of bathroom (in kind), flooring, kitchen countertops, electrical fixtures (switches, outlets and fixtures). interior painting, exterior painting, siding-dry rot repair at back of building (approx. 660 ft). no moving walls. no layout changes.Details
upper unit. interior remodel of bathroom (in kind), flooring, kitchen countertops, electrical fixtures (switches, outlets and fixtures). interior painting, exterior painting, siding-dry rot repair at back of building (approx. 660 ft). no moving walls. no layout changes. | $136,000 |
| Mar 4, 2025 | Completed final sign-off Jun 2025 | 44 Madrone Av | in kind framing repair in kitchen wall, relocation of vent line and furnace and water heater flu line, rewire all vent rooms, bathroom and hallway. not street visible. gas vent shall comply cmc 802.6 and sfmc 802.6.2Details
in kind framing repair in kitchen wall, relocation of vent line and furnace and water heater flu line, rewire all vent rooms, bathroom and hallway. not street visible. gas vent shall comply cmc 802.6 and sfmc 802.6.2 | $26,400 |
| Sep 18, 2024 | Completed final sign-off Nov 2024 | 60 Melrose Av | interior bathroom and kitchen remodel like for like. remove and replace plumbing fixtures, doors, baseboards, floor finishes and trim, paint walls and ceiling, remove and replace (e) skylights. no wall demolition or constructionDetails
interior bathroom and kitchen remodel like for like. remove and replace plumbing fixtures, doors, baseboards, floor finishes and trim, paint walls and ceiling, remove and replace (e) skylights. no wall demolition or construction | $97,580 |
| Aug 22, 2024 | Completed final sign-off Apr 2025 | 2459 41st Av | rev 2024-0612-4264: change location of water heater, change orientaion of w&d hookups, remove (1) shower head and remove pony walls for (n) bathroom.Details
rev 2024-0612-4264: change location of water heater, change orientaion of w&d hookups, remove (1) shower head and remove pony walls for (n) bathroom. | |
| Jul 24, 2024 | Completed final sign-off Sep 2024 | 2574 28th Av | bathroom renovation like for like no layout changes.Details
bathroom renovation like for like no layout changes. | $14,395 |
| Jul 11, 2024 | Completed final sign-off Oct 2024 | 2507 30th Av | interior 3 bathroom remodel and kitchen countertop sink faucet like for like no layout changes.Details
interior 3 bathroom remodel and kitchen countertop sink faucet like for like no layout changes. | $62,050 |
| Jun 12, 2024 | In progress issued Jun 2024 | 2459 41st Av | adding a bathroom in the existing garage area. 91 sq.ft will be added within the envelope of the house. moving the door to the backyard. replacing furnace.Details
adding a bathroom in the existing garage area. 91 sq.ft will be added within the envelope of the house. moving the door to the backyard. replacing furnace. | $80,000 |
| May 23, 2024 | Completed final sign-off Sep 2024 | 655 18th Av | kitchen and bathroom remodel like for like.Details
kitchen and bathroom remodel like for like. | $65,000 |